ID |
Date |
Author |
Subject |
Run Number |
DUT |
Beam Energy |
Beam Betatron |
Beam Chopper |
Beam Degrader |
Beam EFE |
Beam Orb |
Beam QuadScan |
PhantomType |
PhantomAngle |
Events |
Data |
22
|
Sun May 10 20:26:25 2020 |
Felix Ulrich-Pur | Beam+Diamond 500V | 20 | Diamond | 100.4 | none | none | | EFE | | SID2 | none | | 103032 | |
Diamond
Dia HV = +/- 250V
ADC, FIR, ped, noise, cal |
23
|
Sun May 10 20:41:43 2020 |
Felix Ulrich-Pur | Beam+Diamond 500V | 21 | Diamond | 194.3 | none | none | | EFE | | SID2 | none | | 150960 | |
Diamond
Dia HV = +/- 250V
ADC, FIR, ped, noise, cal |
24
|
Sun May 10 22:04:51 2020 |
Christian Irmler | Beam+Diamond 500V | 22 | Diamond | 252.7 | none | none | | EFE | | SID2 | none | | 221012 | |
Diamond
Dia HV = +/- 250V
run taken instead of 800MeV --> beam parameters for 800 were not prepared |
92
|
Fri Jun 19 19:22:10 2020 |
Felix Ulrich-Pur | Calibration Diamond,Silimond,pCT6+Diamand | 30 | Diamond | | | | | | | | | | | |
300V-800V in 100V steps
xml files:
/mnt/data/xmls/local/pct_dia_01_diamond_800V_02-000030.xml
/mnt/data/xmls/global/pct_dia_01_diamond_800V_beam_02-000030.xml
all calibration files
800 is only example replace with according voltage |
95
|
Sun Jun 21 07:53:56 2020 |
Felix Ulrich-Pur | Diamond only 800MeV 500V | 33 | Diamond | 800 | 10 | 60 | 20 | 10 | 6dB | | | | 109363 | |
800 MeV global run (tracking effciency)
setting4
telescope shifted 6mm to the left (in beam direction) |
96
|
Sun Jun 21 07:54:38 2020 |
Felix Ulrich-Pur | Diamond only 800MeV 600V | 34 | Diamond | 800 | 10 | 60 | 20 | 10 | 6dB | | | | 101831 | |
800 MeV global run (tracking effciency)
setting4
telescope shifted 6mm to the left (in beam direction) |
97
|
Sun Jun 21 08:15:13 2020 |
Felix Ulrich-Pur | Diamond only 800MeV 700V | 35 | Diamond | 800 | 10 | 60 | 20 | 10 | 6dB | | | | 101522 | |
800 MeV global run (tracking effciency)
setting4
telescope shifted 6mm to the left (in beam direction)
4 strips on n- side started to getted really noisy (408,409,483,484) |
98
|
Sun Jun 21 08:43:23 2020 |
Felix Ulrich-Pur | Diamond only 800MeV 400V | 36 | Diamond | 800 | 10 | 60 | 20 | 10 | 6dB | | | | 101680 | |
800 MeV global run (tracking effciency)
setting4
telescope shifted 6mm to the left (in beam direction)
strips are not noisy |
99
|
Sun Jun 21 09:11:38 2020 |
Felix Ulrich-Pur | Diamond only 800MeV 300V | 37 | Diamond | 800 | 10 | 60 | 20 | 10 | 6dB | | | | 116365 | |
800 MeV global run (tracking effciency)
setting4
telescope shifted 6mm to the left (in beam direction)
|
102
|
Sun Jun 21 10:22:37 2020 |
Felix Ulrich-Pur | Diamond only 800MeV 800V | 40 | Diamond | 800 | 10 | 60 | 20 | 10 | 6dB | | | | 108625 | |
800 MeV global run (tracking effciency)
setting4
telescope shifted 6mm to the left (in beam direction)
|
104
|
Sun Jun 21 12:29:57 2020 |
Felix Ulrich-Pur | Diamond only 252.7MeV 700V | 42 | Diamond | 252.7 | | | | EFE | | SID2 | | | 113770 | |
252.7 MeV global run
telescope shifted 6mm to the left (in beam direction)
|
105
|
Sun Jun 21 13:11:19 2020 |
Felix Ulrich-Pur | Diamond only 252.7MeV 500V | 43 | Diamond | 252.7 | | | | EFE | | SID2 | | | 101536 | |
252.7 MeV global run
telescope shifted 6mm to the left (in beam direction)
|
106
|
Sun Jun 21 13:11:37 2020 |
Felix Ulrich-Pur | Diamond only 62.4MeV 700V | 44 | Diamond | 62.4 | | | | EFE | | SID2 | | | 100528 | |
62.4MeV global run
telescope shifted 6mm to the left (in beam direction)
|
107
|
Sun Jun 21 13:54:57 2020 |
Felix Ulrich-Pur | Diamond only 252.7 MeV 500V | 45 | Diamond | 252.7 | | | | EFE | | SID0 | | | | |
252.7 MeV 4MHz flux text no spill structure in current visible
telescope shifted 6mm to the left (in beam direction)
|
108
|
Sun Jun 21 13:57:57 2020 |
Felix Ulrich-Pur | Diamond only 252.7 MeV 500V | 46 | Diamond | 252.7 | | | 10 | | | | | | | |
252.7 MeV 400MHz flux test: spill structure in current visible
nominal flux degrader 10, random trigger
telescope shifted 6mm to the left (in beam direction)
|
109
|
Sun Jun 21 14:16:41 2020 |
Felix Ulrich-Pur | Diamond only 252.7 MeV 800V | 47 | Diamond | 252.7 | | | | EFE | | SID2 | | | 118671 | |
252.7 MeV lobal run
telescope shifted 6mm to the left (in beam direction)
|
110
|
Sun Jun 21 14:17:34 2020 |
Felix Ulrich-Pur | Silimond 500V | 48 | Diamond | Noise | | | | | | | | | | |
500 V run after high flux irradiation
|
Draft
|
Fri May 8 15:17:39 2020 |
Felix Ulrich-Pur | | | DSSD-Tracker | Noise | | | | | | | | | | |
|
146
|
Sun Sep 20 07:39:31 2020 |
Alexander Burker | 2020-09-20 | 7 | DSSD-Tracker | 252.7 | 1 | | | 1 | | | none | | | Crap |
|
147
|
Sun Sep 20 08:39:17 2020 |
Alexander Burker | 2020-09-20 | 8 | DSSD-Tracker | 252.7 | 1 | | | 1 | | | none | | | Crap |
|