Home CMS Production Clean room MedAustron HEPHY testbeams old
testbeam-MA2018 testbeam-MA2019 testbeam-MA2020 testbeam-MA2021 testbeam-MA2023 testbeam-MA2024
  MedAustron 2020, Page 12 of 15  Not logged in ELOG logo
New entries since:Thu Jan 1 01:00:00 1970
Entry  Sat Jul 4 04:43:54 2020, Felix Ulrich-Pur, Beta+EFE spot-size measurement, 20, Lynx+RaMon+Octavius, 83, yes, , , yes, , , , , ,  
tested 180s exposure time of Lynx
Entry  Sat Oct 10 11:53:27 2020, Manuel Christanell, 2020-10-10, 20, TERA+Tracker, 100.4, , , , 1, , SID2, , , ,  
Start 11:45
Entry  Sun May 10 15:58:42 2020, Christian Irmler, alignment, 2, Diamond + DSSD tracker, 252.7, none, none, , EFE, , SID2, none, , 42740,  8x
alignment run
DSSD HV = +/- 50V
Dia HV = +/- 250V
Entry  Fri Jun 12 23:47:07 2020, Felix Ulrich-Pur, Calibration TERA MPV 200, 2, TERA-Cal, 800, 10, 60, 20, 10, 6dB, , none, , ,  
Setting 4

slice R1 did not converge therofor 9 steps
Entry  Sat Jul 4 03:59:45 2020, Felix Ulrich-Pur, EFE SID0 Energy measurement, 2, Peakfinder, 145.4, , , , yes, , SID0, , , ,  
2 spills per measurement point
Entry  Sun Sep 20 06:43:10 2020, Alexander Burker, 2020-09-20, 2, TERA-Cal, 800, , , , , , , none, , ,  
800 MeV, "Setting 4"

Timeout stop
Entry  Sat Oct 10 09:38:12 2020, Alexander Burker, 2020-10-10, 2, TERA-Cal, 800, , , , , , , , , ,  
Start 06:58; "Setting 4", Calibration

 
Entry  Sun Dec 6 15:41:31 2020, Christian Irmler, MPW2, 199, W13_04, 252.7, , , , 1, , SID0, , HV = 40V, 10 spills,  
HV = 40V

r0 c2
Entry  Sun Dec 6 15:38:59 2020, Christian Irmler, MPW2, 198, W13_04, 252.7, , , , 1, , SID0, , HV = 60V, 10 spills,  
HV = 60V

r0 c2
Entry  Sun Dec 6 15:37:05 2020, Christian Irmler, MPW2, 197, W13_04, 252.7, , , , 1, , SID0, , HV = 80V, 10 spills,  
HV = 80V

r0 c2
Entry  Sun Dec 6 13:59:35 2020, Christian Irmler, MPW2, 196, W13_04, 252.7, , , , 1, , SID0, , , ,  
Testrun to check number of hits per splill --> ~5k hits per spill
Entry  Sun May 10 19:39:34 2020, Felix Ulrich-Pur, Beam Diamond+pCT6 500V, 19, Diamond + DSSD-pCT6, 62.4, none, none, , EFE, , SID2, none, , 101031,  01-000019.root-cogLocations_5.1.1.0-Empirics.png01-000019.root-cogLocations_5.1.1.1-Empirics.png
Diamond+pCT6
Dia HV = +/- 250V

ADC, FIR, ped, noise, cal
Entry  Sat Jun 13 03:08:39 2020, Felix Ulrich-Pur, Linearity measurement TERA 100.4 gain Sr90, 19, TERA-Cal, 100.4, BETA, , , EFE, , SID2, none, , 200000,  
9Linearity Messung Gain Sr-90

Calibration from Lab not useful-> maybe different voltages if all slices are connected
Entry  Sat Jul 4 04:43:36 2020, Felix Ulrich-Pur, Beta+EFE spot-size measurement, 19, Lynx+RaMon+Octavius, 100.4, yes, , , yes, , , , , ,  
tested 180s exposure time of Lynx
Entry  Sat Oct 10 11:51:19 2020, Manuel Christanell, 2020-10-10, 19, TERA+Tracker, 100.4, , , , 1, , SID2, , , 300.000,  
Start 11:38
Entry  Sun May 10 19:28:36 2020, Felix Ulrich-Pur, Beam Diamond 600V, 18, Diamond, 62.4, none, none, , EFE, , SID2, none, , 62250,  
Diamond+pCT6
Dia HV = +/- 300V

ADC, FIR, ped, noise, cal
Entry  Sat Jun 13 03:08:25 2020, Felix Ulrich-Pur, Linearity measurement TERA 100.4 gain 400MPV, 18, TERA-Cal, 100.4, BETA, , , EFE, , SID2, none, , 200000,  
Linearity Messung Gain 400MPV previous voltages were not applied
Entry  Sat Jul 4 04:16:41 2020, Felix Ulrich-Pur, Beta+EFE spot-size measurement, 18, Lynx+RaMon+Octavius, 145.4, yes, , , yes, , , , , ,  
tested 180s exposure time of Lynx
Entry  Sat Oct 10 11:49:36 2020, Manuel Christanell, 2020-10-10, 18, TERA+Tracker, 100.4, 1, , , 1, , , , , ,  
Start 11:30; with Tracker
Entry  Sun May 10 19:27:52 2020, Felix Ulrich-Pur, Beam Diamond 600V, 17, Diamond, 62.4, none, none, , EFE, , SID2, none, , 44667,  
Diamond+pCT6
Dia HV = +/- 300V

ADC, FIR, ped, noise, cal
ELOG V3.1.5-fc6679b