tested 180s exposure time of Lynx
Start 11:45
alignment run DSSD HV = +/- 50V Dia HV = +/- 250V xml = pct_dia_01_silimond_beam_01-000001.xml after ~ 1h beam (pumping)
start: 15:58 stop: 16:26
Setting 4
slice R1 did not converge therofor 9 steps
2 spills per measurement point
800 MeV, "Setting 4"
Timeout stop
Start 06:58; "Setting 4", Calibration
HV = 40V
r0 c2
HV = 60V
HV = 80V
Testrun to check number of hits per splill --> ~5k hits per spill
Diamond+pCT6 Dia HV = +/- 250V
ADC, FIR, ped, noise, cal
9Linearity Messung Gain Sr-90
Calibration from Lab not useful-> maybe different voltages if all slices are connected
Start 11:38
Diamond+pCT6 Dia HV = +/- 300V
PARTII
Linearity Messung Gain 400MPV previous voltages were not applied
Start 11:30; with Tracker
unterbrochen, da TLU-ERROR