Start 21:34; Stop 21:56; PCT phase;
Start 21:57; Stop 22:10; PCT phase;
300V-800V in 100V steps
xml files:
/mnt/data/xmls/local/pct_dia_01_diamond_800V_02-000030.xml /mnt/data/xmls/global/pct_dia_01_diamond_800V_beam_02-000030.xml
all calibration files
800 is only example replace with according voltage
local run
800 MeV global run (tracking effciency) setting4
telescope shifted 6mm to the left (in beam direction)
4 strips on n- side started to getted really noisy (408,409,483,484)
strips are not noisy
252.7 MeV global run
62.4MeV global run
252.7 MeV 4MHz flux text no spill structure in current visible
252.7 MeV 400MHz flux test: spill structure in current visible
nominal flux degrader 10, random trigger