Home CMS Production Clean room MedAustron HEPHY testbeams old
testbeam-MA2018 testbeam-MA2019 testbeam-MA2020 testbeam-MA2021 testbeam-MA2023 testbeam-MA2024
  MedAustron 2020, Page 11 of 15  Not logged in ELOG logo
Entry  Sun May 10 17:44:50 2020, Felix Ulrich-Pur, Calibration Diamond+pCT6 500V, 11, Diamond + DSSD-pCT6, 252.7, none, none, , , , , none, , ,  
Diamond+pCT6
Dia HV = +/- 250V

ADC, FIR, ped, noise, cal
Entry  Sun May 10 22:21:11 2020, Felix Ulrich-Pur, Calibration Tracker+Diamond 500V, 24, Diamond + DSSD tracker, 252.7, none, none, , , , , none, , ,  
Diamond+Tracker
Dia HV = +/- 250V

 
Entry  Fri Jun 12 23:10:40 2020, Felix Ulrich-Pur, Calibration TERA MPV 200, 1, TERA-Cal, 800, 10, 60, 20, 10, 6dB, , none, , ,  
Setting 4

was stopped, cause timout setting was not adjusted to spill structure
Entry  Fri Jun 12 23:47:07 2020, Felix Ulrich-Pur, Calibration TERA MPV 200, 2, TERA-Cal, 800, 10, 60, 20, 10, 6dB, , none, , ,  
Setting 4

slice R1 did not converge therofor 9 steps
Entry  Sat Jun 13 00:01:43 2020, Felix Ulrich-Pur, Calibration TERA MPV 300, 3, TERA-Cal, 800, 10, 60, 20, 10, 6dB, , none, , ,  
Setting 4

 
Entry  Sat Jun 13 00:14:44 2020, Felix Ulrich-Pur, Calibration TERA MPV 400, 4, TERA-Cal, 800, 10, 60, 20, 10, 6dB, , none, , ,  
Setting 4

stopped because one slice could not be calibrated due to SW error
Entry  Sat Jun 13 00:29:22 2020, Felix Ulrich-Pur, Calibration TERA MPV 400, 5, TERA-Cal, 800, 10, 60, 20, 10, 6dB, , none, , ,  
Setting 4

S9 did not converge run stopped

 
Entry  Sat Jun 13 00:34:32 2020, Felix Ulrich-Pur, Calibration TERA MPV 400, 6, TERA-Cal, 800, 10, 60, 20, 10, 6dB, , none, , ,  
Setting 4

 
Entry  Sat Jun 13 00:54:47 2020, Felix Ulrich-Pur, Calibration TERA MPV 300, 7, TERA-Cal, 800, 10, 60, 20, 10, 6dB, , none, , ,  
Setting 4

repeated 300, because of SW error in previous run

 
Entry  Sat Jun 13 01:07:52 2020, Felix Ulrich-Pur, Calibration TERA MPV 200, 8, TERA-Cal, 800, 10, 60, 20, 10, 6dB, , none, , ,  
Setting 4

repeated 200, because of SW error in previous run

 
Entry  Sat Jun 13 01:29:35 2020, Felix Ulrich-Pur, Calibration TERA MPV 600, 9, TERA-Cal, 800, 10, 60, 20, 10, 6dB, , none, , ,  
Setting 4

few slices did not converge -> adapt range setting

 
Entry  Sat Jun 13 01:51:17 2020, Felix Ulrich-Pur, Calibration TERA MPV 600, 10, TERA-Cal, 800, 10, 60, 20, 10, 6dB, , none, , ,  
Setting 4

few slices did not converge -> adapted range setting

q9 and p3 did not converge-->choose mean voltage of group
Entry  Fri Jun 19 19:22:10 2020, Felix Ulrich-Pur, Calibration Diamond,Silimond,pCT6+Diamand, 30, Diamond, , , , , , , , , , ,  
300V-800V in 100V steps

xml files:

/mnt/data/xmls/local/pct_dia_01_diamond_800V_02-000030.xml
Entry  Sun Jun 21 05:31:37 2020, Felix Ulrich-Pur, Silimond, 31, Diamond + DSSD tracker, Noise, , , , , , , , , ,  
local run
Entry  Sun Jun 21 13:54:57 2020, Felix Ulrich-Pur, Diamond only 252.7 MeV 500V, 45, Diamond, 252.7, , , , EFE, , SID0, , , ,  
252.7 MeV 4MHz flux text no spill structure  in current visible

 

telescope shifted 6mm to the left (in beam direction)
Entry  Sun Jun 21 13:57:57 2020, Felix Ulrich-Pur, Diamond only 252.7 MeV 500V, 46, Diamond, 252.7, , , 10, , , , , , ,  
252.7 MeV 400MHz flux test: spill structure  in current visible

nominal flux degrader 10, random trigger

 
Entry  Sun Jun 21 14:17:34 2020, Felix Ulrich-Pur, Silimond 500V, 48, Diamond, Noise, , , , , , , , , ,  
500 V run after high flux irradiation

 
Entry  Sat Jul 4 03:58:14 2020, Felix Ulrich-Pur, EFE SID0 Energy measurement, 1, Peakfinder, 100.4, , , , yes, , SID0, , , ,  
3 spills per measurement point
Entry  Sat Jul 4 03:59:45 2020, Felix Ulrich-Pur, EFE SID0 Energy measurement, 2, Peakfinder, 145.4, , , , yes, , SID0, , , ,  
2 spills per measurement point
Entry  Sat Jul 4 04:00:05 2020, Felix Ulrich-Pur, EFE SID0 Energy measurement, 3, Peakfinder, 62.4, , , , yes, , SID0, , , ,  
1 spills per measurement point
ELOG V3.1.5-fc6679b