Home CMS Production Clean room MedAustron HEPHY testbeams old
testbeam-MA2018 testbeam-MA2019 testbeam-MA2020 testbeam-MA2021 testbeam-MA2023 testbeam-MA2024
  MedAustron 2020, Page 11 of 15  Not logged in ELOG logo
ID Date Authordown Subject Run Number DUT Beam Energy Beam Betatron Beam Chopper Beam Degrader Beam EFE Beam Orb Beam QuadScan PhantomType PhantomAngle Events Data
  3   Sun May 10 14:51:12 2020 Christian IrmlerCalibration Runs1Diamond + DSSD trackerNoise      none   

ADC delay, FIR, ped, noise,cal with DSSD tracker + diamond
DSSD HV= +/- 50V
Dia HV = +/- 250V

diamond not yet pumped

calibration files: pct_dia_01_silimond_tb_01-000001.xml

  4   Sun May 10 15:26:33 2020 Christian Irmleralignment1Diamond + DSSD tracker252.7nonenone EFE SID2none 75970 

alignment run
DSSD HV = +/- 50V
Dia HV = +/- 250V
xml = pct_dia_01_silimond_beam_01-000001.xml

start: 15:00
stop: 15:56

Attachment 1: 01-000001.root-cogLocations_5.1.1.0-Empirics.png
01-000001.root-cogLocations_5.1.1.0-Empirics.png
Attachment 2: 01-000001.root-cogLocations_5.1.1.1-Empirics.png
01-000001.root-cogLocations_5.1.1.1-Empirics.png
Attachment 3: 01-000001.root-cogLocations_5.1.2.0-Empirics.png
01-000001.root-cogLocations_5.1.2.0-Empirics.png
Attachment 4: 01-000001.root-cogLocations_5.1.2.1-Empirics.png
01-000001.root-cogLocations_5.1.2.1-Empirics.png
Attachment 5: 01-000001.root-cogLocations_5.1.3.0-Empirics.png
01-000001.root-cogLocations_5.1.3.0-Empirics.png
Attachment 6: 01-000001.root-cogLocations_5.1.3.1-Empirics.png
01-000001.root-cogLocations_5.1.3.1-Empirics.png
Attachment 7: 01-000001.root-cogLocations_5.1.4.0-Empirics.png
01-000001.root-cogLocations_5.1.4.0-Empirics.png
Attachment 8: 01-000001.root-cogLocations_5.1.4.1-Empirics.png
01-000001.root-cogLocations_5.1.4.1-Empirics.png
  5   Sun May 10 15:58:42 2020 Christian Irmleralignment2Diamond + DSSD tracker252.7nonenone EFE SID2none 42740 

alignment run
DSSD HV = +/- 50V
Dia HV = +/- 250V
xml = pct_dia_01_silimond_beam_01-000001.xml

after ~ 1h beam (pumping)

start: 15:58
stop:  16:26

Attachment 1: 01-000002.root-cogLocations_5.1.1.0-Empirics.png
01-000002.root-cogLocations_5.1.1.0-Empirics.png
Attachment 2: 01-000002.root-cogLocations_5.1.1.1-Empirics.png
01-000002.root-cogLocations_5.1.1.1-Empirics.png
Attachment 3: 01-000002.root-cogLocations_5.1.2.0-Empirics.png
01-000002.root-cogLocations_5.1.2.0-Empirics.png
Attachment 4: 01-000002.root-cogLocations_5.1.2.1-Empirics.png
01-000002.root-cogLocations_5.1.2.1-Empirics.png
Attachment 5: 01-000002.root-cogLocations_5.1.3.0-Empirics.png
01-000002.root-cogLocations_5.1.3.0-Empirics.png
Attachment 6: 01-000002.root-cogLocations_5.1.3.1-Empirics.png
01-000002.root-cogLocations_5.1.3.1-Empirics.png
Attachment 7: 01-000002.root-cogLocations_5.1.4.0-Empirics.png
01-000002.root-cogLocations_5.1.4.0-Empirics.png
Attachment 8: 01-000002.root-cogLocations_5.1.4.1-Empirics.png
01-000002.root-cogLocations_5.1.4.1-Empirics.png
  6   Sun May 10 16:44:46 2020 Christian IrmlerCalibration Diamond 500V3Diamond252.7nonenone    none   

diamond only
Dia HV = +/- 250V

ADC, FIR, ped, noise, cal

  7   Sun May 10 16:47:10 2020 Christian IrmlerCalibration Diamond 600V4Diamond252.7nonenone    none   

diamond only
Dia HV = +/- 300V

ADC, FIR, ped, noise, cal

  8   Sun May 10 16:47:49 2020 Christian IrmlerBeam Diamond 600V5Diamond252.7nonenone EFE SID2none 103286 

diamond only
Dia HV = +/- 300V

pct_dia_01_diamond_600V_01-000005.xml

  9   Sun May 10 17:01:42 2020 Christian IrmlerCalibration Diamond + pCT-6 600V6Diamond + DSSD-pCT6252.7nonenone    none   

pCT-6 + diamond

DSSD HV = +/-50V
Dia HV = +/- 300V

ADC, FIR, ped, noise, cal

  10   Sun May 10 17:14:00 2020 Christian IrmlerCalibration Diamond + pCT-6 300V7Diamond + DSSD-pCT6252.7nonenone    none   

pCT-6 + diamond

DSSD HV = +/-50V
Dia HV = +/- 150V

ADC, FIR, ped, noise, cal

  11   Sun May 10 17:16:58 2020 Christian IrmlerCalibration Diamond 300V8Diamond252.7nonenone    none   

Diamond only
Dia HV = +/- 150V

ADC, FIR, ped, noise, cal

  24   Sun May 10 22:04:51 2020 Christian IrmlerBeam+Diamond 500V22Diamond252.7nonenone EFE SID2none 221012 

Diamond
Dia HV = +/- 250V

run taken instead of 800MeV --> beam parameters for 800 were not prepared

  275   Sun Dec 6 12:52:17 2020 Christian IrmlerMPW2 setup and configuration             

First testbeam with MPW2, Setup as depicted in attachment 1,

Default beam setting EFE/SID0 252 MeV, released setting 

TRIMDAC config from Friday: trimconfig_W13_04_80V_06_12_13_00 - New trimdac run taken on Sunday! 

 

Attachment 1: Setup_for_first_MPW2_Beamtest.pdf
Attachment 2: Shiftplan_MPW2shift_2020-12-06.pdf
  276   Sun Dec 6 13:59:35 2020 Christian IrmlerMPW2196W13_04252.7   1 SID0    

Testrun to check number of hits per splill --> ~5k hits per spill

  277   Sun Dec 6 15:37:05 2020 Christian IrmlerMPW2197W13_04252.7   1 SID0 HV = 80V10 spills 

HV = 80V

r0 c2

  278   Sun Dec 6 15:38:59 2020 Christian IrmlerMPW2198W13_04252.7   1 SID0 HV = 60V10 spills 

HV = 60V

r0 c2

  279   Sun Dec 6 15:41:31 2020 Christian IrmlerMPW2199W13_04252.7   1 SID0 HV = 40V10 spills 

HV = 40V

r0 c2

  281   Sun Dec 6 15:44:51 2020 Christian IrmlerMPW2200W13_04252.7   1 SID0 HV = during ramping10 spillsCrap

HV = 

r0 c2

  282   Sun Dec 6 15:45:45 2020 Christian IrmlerMPW2201W13_04252.7   1 SID0 HV = 100V10 spills 

r0 c2

  283   Sun Dec 6 15:53:12 2020 Christian IrmlerMPW2202W13_04252.7   1 SID0 HV off10 spills 

r0 c2

HV set to 0V, but KeithRC SW turned SMU output off 

  284   Sun Dec 6 15:55:13 2020 Christian IrmlerMPW2203W13_04252.7   1 SID0 HV = 1V10 spills 

r0 c2

lowest Voltage, which could be set with SMU outputs on.

  285   Sun Dec 6 15:57:28 2020 Christian IrmlerMPW2204W13_04252.7   1 SID0 HV = 20V10 spills 

r0 c2

ELOG V3.1.5-fc6679b