Home CMS Production Clean room MedAustron HEPHY testbeams old
testbeam-MA2018 testbeam-MA2019 testbeam-MA2020 testbeam-MA2021 testbeam-MA2023 testbeam-MA2024
  MedAustron 2020, Page 11 of 15  Not logged in ELOG logo
New entries since:Thu Jan 1 01:00:00 1970
Entry  Sun May 10 14:51:12 2020, Christian Irmler, Calibration Runs, 1, Diamond + DSSD tracker, Noise, , , , , , , none, , ,  

ADC delay, FIR, ped, noise,cal with DSSD tracker + diamond
DSSD HV= +/- 50V
Dia HV = +/- 250V

diamond not yet pumped

calibration files: pct_dia_01_silimond_tb_01-000001.xml

Entry  Sun May 10 15:26:33 2020, Christian Irmler, alignment, 1, Diamond + DSSD tracker, 252.7, none, none, , EFE, , SID2, none, , 75970,  8x

alignment run
DSSD HV = +/- 50V
Dia HV = +/- 250V
xml = pct_dia_01_silimond_beam_01-000001.xml

start: 15:00
stop: 15:56

Entry  Sun May 10 15:58:42 2020, Christian Irmler, alignment, 2, Diamond + DSSD tracker, 252.7, none, none, , EFE, , SID2, none, , 42740,  8x

alignment run
DSSD HV = +/- 50V
Dia HV = +/- 250V
xml = pct_dia_01_silimond_beam_01-000001.xml

after ~ 1h beam (pumping)

start: 15:58
stop:  16:26

Entry  Sun May 10 16:44:46 2020, Christian Irmler, Calibration Diamond 500V, 3, Diamond, 252.7, none, none, , , , , none, , ,  

diamond only
Dia HV = +/- 250V

ADC, FIR, ped, noise, cal

Entry  Sun May 10 16:47:10 2020, Christian Irmler, Calibration Diamond 600V, 4, Diamond, 252.7, none, none, , , , , none, , ,  

diamond only
Dia HV = +/- 300V

ADC, FIR, ped, noise, cal

Entry  Sun May 10 16:47:49 2020, Christian Irmler, Beam Diamond 600V, 5, Diamond, 252.7, none, none, , EFE, , SID2, none, , 103286,  

diamond only
Dia HV = +/- 300V

pct_dia_01_diamond_600V_01-000005.xml

Entry  Sun May 10 17:01:42 2020, Christian Irmler, Calibration Diamond + pCT-6 600V, 6, Diamond + DSSD-pCT6, 252.7, none, none, , , , , none, , ,  

pCT-6 + diamond

DSSD HV = +/-50V
Dia HV = +/- 300V

ADC, FIR, ped, noise, cal

Entry  Sun May 10 17:14:00 2020, Christian Irmler, Calibration Diamond + pCT-6 300V, 7, Diamond + DSSD-pCT6, 252.7, none, none, , , , , none, , ,  

pCT-6 + diamond

DSSD HV = +/-50V
Dia HV = +/- 150V

ADC, FIR, ped, noise, cal

Entry  Sun May 10 17:16:58 2020, Christian Irmler, Calibration Diamond 300V, 8, Diamond, 252.7, none, none, , , , , none, , ,  

Diamond only
Dia HV = +/- 150V

ADC, FIR, ped, noise, cal

Entry  Sun May 10 22:04:51 2020, Christian Irmler, Beam+Diamond 500V, 22, Diamond, 252.7, none, none, , EFE, , SID2, none, , 221012,  

Diamond
Dia HV = +/- 250V

run taken instead of 800MeV --> beam parameters for 800 were not prepared

Entry  Sun Dec 6 12:52:17 2020, Christian Irmler, MPW2 setup and configuration, , , , , , , , , , , , ,  Setup_for_first_MPW2_Beamtest.pdfShiftplan_MPW2shift_2020-12-06.pdf

First testbeam with MPW2, Setup as depicted in attachment 1,

Default beam setting EFE/SID0 252 MeV, released setting 

TRIMDAC config from Friday: trimconfig_W13_04_80V_06_12_13_00 - New trimdac run taken on Sunday! 

 

Entry  Sun Dec 6 13:59:35 2020, Christian Irmler, MPW2, 196, W13_04, 252.7, , , , 1, , SID0, , , ,  

Testrun to check number of hits per splill --> ~5k hits per spill

Entry  Sun Dec 6 15:37:05 2020, Christian Irmler, MPW2, 197, W13_04, 252.7, , , , 1, , SID0, , HV = 80V, 10 spills,  

HV = 80V

r0 c2

Entry  Sun Dec 6 15:38:59 2020, Christian Irmler, MPW2, 198, W13_04, 252.7, , , , 1, , SID0, , HV = 60V, 10 spills,  

HV = 60V

r0 c2

Entry  Sun Dec 6 15:41:31 2020, Christian Irmler, MPW2, 199, W13_04, 252.7, , , , 1, , SID0, , HV = 40V, 10 spills,  

HV = 40V

r0 c2

Entry  Sun Dec 6 15:44:51 2020, Christian Irmler, MPW2, 200, W13_04, 252.7, , , , 1, , SID0, , HV = during ramping, 10 spills, Crap 

HV = 

r0 c2

Entry  Sun Dec 6 15:45:45 2020, Christian Irmler, MPW2, 201, W13_04, 252.7, , , , 1, , SID0, , HV = 100V, 10 spills,  

r0 c2

Entry  Sun Dec 6 15:53:12 2020, Christian Irmler, MPW2, 202, W13_04, 252.7, , , , 1, , SID0, , HV off, 10 spills,  

r0 c2

HV set to 0V, but KeithRC SW turned SMU output off 

Entry  Sun Dec 6 15:55:13 2020, Christian Irmler, MPW2, 203, W13_04, 252.7, , , , 1, , SID0, , HV = 1V, 10 spills,  

r0 c2

lowest Voltage, which could be set with SMU outputs on.

Entry  Sun Dec 6 15:57:28 2020, Christian Irmler, MPW2, 204, W13_04, 252.7, , , , 1, , SID0, , HV = 20V, 10 spills,  

r0 c2

ELOG V3.1.5-fc6679b