Home CMS Production Clean room MedAustron HEPHY testbeams old
testbeam-MA2018 testbeam-MA2019 testbeam-MA2020 testbeam-MA2021 testbeam-MA2023 testbeam-MA2024
  MedAustron 2019  Not logged in ELOG logo
Message ID: 24     Entry time: Sun Jul 14 17:51:31 2019
Author: Alexander Burker 
Subject: 2019-07-13f proton CT 
DUT: Drehtisch 
Beam Energy: 145.4 
Beam Setting: EFE, QuadScan SID2 
Run Number: 19 
Events: 52016 
PhantomType: Alu 
PhantomAngle: 80 

Trigger: Coincidence using MaltaPix

This was a frame too late, however a bug in the TLU configuration is suspected. Actually, Felix put in two different configurations in this run: the first one "was wrong" and the second was a coincidence between Malta planes 1 and 3

pCT

timing setting 43

 

 

ELOG V3.1.5-fc6679b