HV=300V I=11.1uA
position centered horizontally (+5mm)
DESY table z=-346 x=-255
3 GeV beam momentum
HV=100V I=8.5uA
HV=200V I=9.3uA
HV=250V I=9.5uA
HV=230V I=9.9uA
HV=240V I=9.4uA
HV=220V I=9.1uA
HV=210V I=9.0uA
HV=260V I=9.3uA
HV=270V I=9.6uA
HV=280V I=9.6uA
HV=150V I=8.0uA
close to end: switched to 6GeV
HV=150V I=7.90uA
Delay scan with single sample
Several runs
HV=300V I=9.2uA
position adapted to center beam better (+10mm horizontal)
narrow trigger width (~5ns)
single sample run
Beam energy = 3 GeV
HV=300V I=8.5uA
multi6 with same settings as run019 (htr+3)
HV=100V I=7.2uA
single trigger
HV=150V I=7.3uA
HV=200V I=8.0uA
HV=210V I=8.1uA