Home CMS Production Clean room MedAustron HEPHY testbeams old
testbeam-rd50-desy-Oct2024 testbeam-RD50-DESY-Apr2024 testbeam-RD50-DESY-Jul2023 testbeam-RD50-CERN-Oct2022 testbeam-DESY-Oct2017 testbeam-DESY-April2017 testbeam-SPS2015 testbeam-SPS2014 testbeam-DESY14 testbeam-SPS12 testbeam-SPS11 testbeam-SPS10 testbeam-SPS09 testbeam-SPS08 LP-TPC
  Alibava testbeam at DESY in Oct. 2017 (Dominic, Peter)  Not logged in ELOG logo
Message ID: 95     Entry time: Tue Oct 24 18:28:56 2017
Author: Peter Paulitsch 
DUT: HPK_3e14 
Subject: run000311 
Run Number: 311 
Events: 110000 
XYPosition: 75.50, 66.00, -40° 
Cooling: Yes 
Data: Good 
Parameter Value
Alibava filename  run000311.dat
Telescope filename  run000311.raw
Pedestal filename KIT_pedestal_600V_22102017.ped
Bias voltage -600 V
Dark current  
Sensor temperature  
Latency 140 [a.u.]
Alibava triggers 110000
Telescope triggers 100000
Data synced yes
Table position x/y 75.50, 66.00
Region of interest bias line
Trigger frequency   
Meas. time  
Beam energy 5.6 GeV
Cooling yes
Alibava efficiency  
ELOG V3.1.5-fc6679b