Home CMS Production Clean room MedAustron HEPHY testbeams old
testbeam-RD50-DESY-Jul2023 testbeam-RD50-CERN-Oct2022 testbeam-DESY-Oct2017 testbeam-DESY-April2017 testbeam-SPS2015 testbeam-SPS2014 testbeam-DESY14 testbeam-SPS12 testbeam-SPS11 testbeam-SPS10 testbeam-SPS09 testbeam-SPS08 LP-TPC
  Alibava testbeam at DESY in Oct. 2017 (Dominic, Peter)  Not logged in ELOG logo
Message ID: 9     Entry time: Wed Oct 18 12:19:14 2017
Author: Peter Paulitsch 
DUT: IFX_CenterBias 
Subject: run000093 
Run Number: 93 
Events: 1010000 
XYPosition: 122.9, 26, -3.3° 
Cooling: No 
Data: Good 
run settings
Parameter Value
Alibava filename  run000093.dat
Telescope filename  run000093.raw
Pedestal filename pedestal_17102017
Bias voltage -100 V
Dark current -165 nA
Sensor temperature 24.5 °C
Latency 140 [a.u.]
Alibava triggers 1010000
Telescope triggers 1000000
Data synced yes
Table position x/y 122.9, 26
Region of interest all
Trigger frequency  185 Hz
Meas. time 90 min
Beam energy 5.6 GeV
Cooling no
Alibava efficiency 44.1%

 

ELOG V3.1.5-fc6679b