Home CMS Production Clean room MedAustron HEPHY testbeams old
testbeam-RD50-DESY-Jul2023 testbeam-RD50-CERN-Oct2022 testbeam-DESY-Oct2017 testbeam-DESY-April2017 testbeam-SPS2015 testbeam-SPS2014 testbeam-DESY14 testbeam-SPS12 testbeam-SPS11 testbeam-SPS10 testbeam-SPS09 testbeam-SPS08 LP-TPC
  Alibava testbeam at DESY in Oct. 2017 (Dominic, Peter)  Not logged in ELOG logo
Message ID: 42     Entry time: Fri Oct 20 15:30:18 2017
Author: Peter Paulitsch 
DUT: IFX_200_3e14 
Subject: run000206 
Run Number: 206 
Events: 1010000 
XYPosition: 75.93, 65.30, -90.55° 
Cooling: Yes 
Data: Good 
run settings
Parameter Value
Alibava filename  run000206.dat
Telescope filename  run000206.raw
Pedestal filename KIT_pedestal_600V_20102017.ped
Bias voltage -600 V
Dark current 40 uA
Sensor temperature -6
Latency 140 [a.u.]
Alibava triggers 1010000
Telescope triggers 1000000
Data synced yes
Table position x/y 75.93, 65.30
Region of interest bias line
Trigger frequency   
Meas. time  
Beam energy 5.6 GeV
Cooling yes
Alibava efficiency 33.1%

 

ELOG V3.1.5-fc6679b