Home CMS Production Clean room MedAustron HEPHY testbeams old
testbeam-RD50-DESY-Apr2024 testbeam-RD50-DESY-Jul2023 testbeam-RD50-CERN-Oct2022 testbeam-DESY-Oct2017 testbeam-DESY-April2017 testbeam-SPS2015 testbeam-SPS2014 testbeam-DESY14 testbeam-SPS12 testbeam-SPS11 testbeam-SPS10 testbeam-SPS09 testbeam-SPS08 LP-TPC
  Alibava/Mapsa testbeam at DESY in April 2017 (Axel, Grossi)  Not logged in ELOG logo
Message ID: 81     Entry time: Sat Apr 15 21:18:26 2017
Author: Axel Koenig 
Project: ALiBaVa (IFX) 
Subject: run_007_Baby_10V.dat 
Run Number: 007 
Events: 450000 
XYPosition: 102.5, 22.5, 240 
Cooling: No 
Data: Crap 

Remarks: Telescope run 579. Bias scan 10 V. run crashed. Data vaild up to 274915.

Telescope chiller turned off (could be the root cause of runs crashing).

Parameter Value
Alibava run run_007_Baby_10V.dat
Telescope run 579
Triggers 450000
Alibava trigger eff. ~24%
Beam energy 5.6 GeV
Telescope threshold 6
Bias voltage -10
Latency 132
Table x 102.5 mm
Table z 22.5 mm
Tabe rot

240 deg

ELOG V3.1.5-fc6679b