Home CMS Production Clean room MedAustron HEPHY testbeams old
testbeam-RD50-DESY-Apr2024 testbeam-RD50-DESY-Jul2023 testbeam-RD50-CERN-Oct2022 testbeam-DESY-Oct2017 testbeam-DESY-April2017 testbeam-SPS2015 testbeam-SPS2014 testbeam-DESY14 testbeam-SPS12 testbeam-SPS11 testbeam-SPS10 testbeam-SPS09 testbeam-SPS08 LP-TPC
  Alibava/Mapsa testbeam at DESY in April 2017 (Axel, Grossi)  Not logged in ELOG logo
Message ID: 72     Entry time: Fri Apr 14 21:11:18 2017
Author: Axel Koenig 
Project: ALiBaVa (IFX) 
Subject: run_028_IFX_CB_100V.dat 
Run Number: 028 
Events: 3000000 
XYPosition: 109, 4.5, 240 
Cooling: No 
Data: Crap 

Remarks: Telescope run 551. Longrun over night. Run crashed. Events only up to 2288000 valid.

Parameter Value
Alibava run run_028_IFX_CB_100V.dat
Telescope run 551
Triggers 3000000
Alibava trigger eff. ~60 %
Beam energy 5.6 GeV
Telescope threshold 6
Bias voltage -100
Latency 132
Table x 109 mm
Table z 4.5 mm
Tabe rot

240 deg

ELOG V3.1.5-fc6679b