Home CMS Production Clean room MedAustron HEPHY testbeams old
testbeam-rd50-desy-Oct2024 testbeam-RD50-DESY-Apr2024 testbeam-RD50-DESY-Jul2023 testbeam-RD50-CERN-Oct2022 testbeam-DESY-Oct2017 testbeam-DESY-April2017 testbeam-SPS2015 testbeam-SPS2014 testbeam-DESY14 testbeam-SPS12 testbeam-SPS11 testbeam-SPS10 testbeam-SPS09 testbeam-SPS08 LP-TPC
  Alibava/Mapsa testbeam at DESY in April 2017 (Axel, Grossi)  Not logged in ELOG logo
Message ID: 70     Entry time: Fri Apr 14 18:22:58 2017
Author: Axel Koenig 
Project: ALiBaVa (IFX) 
Subject: run_026_IFX_CB_100V.dat 
Run Number: 026 
Events: 350000 
XYPosition: 109, 4.5, 230 
Cooling: No 
Data: Unknown 

Remarks: Telescope run 549. Angle shift 230 deg.

Parameter Value
Alibava run run_026_IFX_CB_100V.dat
Telescope run 549
Triggers 350000
Alibava trigger eff. ~59.8%
Beam energy 5.6 GeV
Telescope threshold 6
Bias voltage -100
Latency 132
Table x 109 mm
Table z 4.5 mm
Tabe rot

230 deg

ELOG V3.1.5-fc6679b