Home CMS Production Clean room MedAustron HEPHY testbeams old
testbeam-rd50-desy-Oct2024 testbeam-RD50-DESY-Apr2024 testbeam-RD50-DESY-Jul2023 testbeam-RD50-CERN-Oct2022 testbeam-DESY-Oct2017 testbeam-DESY-April2017 testbeam-SPS2015 testbeam-SPS2014 testbeam-DESY14 testbeam-SPS12 testbeam-SPS11 testbeam-SPS10 testbeam-SPS09 testbeam-SPS08 LP-TPC
  Alibava/Mapsa testbeam at DESY in April 2017 (Axel, Grossi)  Not logged in ELOG logo
Message ID: 59     Entry time: Fri Apr 14 08:59:26 2017
Author: Axel Koenig 
Project: ALiBaVa (IFX) 
Subject: run_020_IFX_CB_100V.dat 
Run Number: 020 
Events: 190000 
XYPosition: 109, 4.5, 240 
Cooling: No 
Data: Crap 

Remarks: Telescope run 535. Bias scan 100 V. Run crashed over night. Telescope sync only up to event 190000 (planned 2500000 events).

Parameter Value
Alibava run run_020_IFX_CB_100V.dat
Telescope run 535
Triggers 190000
Alibava trigger eff. ~60%
Beam energy 5.6 GeV
Telescope threshold 6
Bias voltage -100
Latency 132
Table x 109 mm
Table z 4.5 mm
Tabe rot

240 deg (parallel to tele. planes)

ELOG V3.1.5-fc6679b