Message ID: 25     Entry time: Thu Apr 13 17:11:31 2017
Author: Axel Koenig 
Project: ALiBaVa (IFX) 
Subject: run_014_IFX_CB_80V.dat 
Run Number: 014 
Events: 175000 
XYPosition: 109, 4.5, 240 
Cooling: No 
Data: Unknown 

3Remarks: Telescope run 525. Bias scan 80 V.

Parameter Value
Alibava run run_014_IFX_CB_80V.dat
Telescope run 525
Triggers 175000
Alibava trigger eff. ~60%
Beam energy 5.6 GeV
Telescope threshold 6
Bias voltage -80
Latency 132
Table x 109 mm
Table z 4.5 mm
Tabe rot

240 deg (parallel to tele. planes)