Home CMS Production Clean room MedAustron HEPHY testbeams old
testbeam-rd50-desy-Oct2024 testbeam-RD50-DESY-Apr2024 testbeam-RD50-DESY-Jul2023 testbeam-RD50-CERN-Oct2022 testbeam-DESY-Oct2017 testbeam-DESY-April2017 testbeam-SPS2015 testbeam-SPS2014 testbeam-DESY14 testbeam-SPS12 testbeam-SPS11 testbeam-SPS10 testbeam-SPS09 testbeam-SPS08 LP-TPC
  Alibava/Mapsa testbeam at DESY in April 2017 (Axel, Grossi)  Not logged in ELOG logo
Message ID: 1     Entry time: Wed Apr 12 21:06:44 2017
Author: Axel König 
Project: ALiBaVa (IFX) 
Subject: run_001_IFX_CB_100V.dat 
Run Number: 001 
Events: 200000 
XYPosition: 109, 4.5, 240 
Cooling: No 
Data: Unknown 

First run for alibava modules with Sensor IFX_CB.

Beam energy = 5.6 GeV

Telescope threshold = 6

Telescope data file = 496

Bias voltage = -100V

Telescope synchornisation: yes

Position table (is center of sensor):

x=109mm

y=4.5mm

phi=240 deg

 

Attachment 1: 11.png  10 kB  Uploaded Wed Apr 12 23:11:21 2017  | Hide | Hide all | Show all
11.png
Attachment 2: 46.png  15 kB  Uploaded Wed Apr 12 23:11:35 2017  | Show | Hide all | Show all
ELOG V3.1.5-fc6679b