Home CMS Production Clean room MedAustron HEPHY testbeams old
testbeam-RD50-DESY-Jul2023 testbeam-RD50-CERN-Oct2022 testbeam-DESY-Oct2017 testbeam-DESY-April2017 testbeam-SPS2015 testbeam-SPS2014 testbeam-DESY14 testbeam-SPS12 testbeam-SPS11 testbeam-SPS10 testbeam-SPS09 testbeam-SPS08 LP-TPC
  Alibava/Mapsa testbeam at DESY in April 2017 (Axel, Grossi)  Not logged in ELOG logo
Message ID: 125     Entry time: Tue Apr 18 21:03:42 2017
Author: Axel Koenig 
Project: ALiBaVa (IFX) 
Subject: run_003_double_irrad_100V.dat 
Run Number: 003 
Events: 3500000 
XYPosition: 103, 1, 240 
Cooling: No 
Data: Unknown 

Remarks: Telescope run 625. Both chips. Central position. Run crashed over night.

Collected triggers 2710991.

Telescope chiller turned on!

Parameter Value
Alibava run run_003_double_irrad_100V.dat
Telescope run 625
Triggers 3500000
Alibava trigger eff. ~70%
Beam energy 5.6 GeV
Telescope threshold 6
Bias voltage -100
Latency 132
Table x 103 mm
Table z 1 mm
Tabe rot

240 deg

ELOG V3.1.5-fc6679b