Home CMS Production Clean room MedAustron HEPHY testbeams old
testbeam-RD50-DESY-Jul2023 testbeam-RD50-CERN-Oct2022 testbeam-DESY-Oct2017 testbeam-DESY-April2017 testbeam-SPS2015 testbeam-SPS2014 testbeam-DESY14 testbeam-SPS12 testbeam-SPS11 testbeam-SPS10 testbeam-SPS09 testbeam-SPS08 LP-TPC
  Alibava/Mapsa testbeam at DESY in April 2017 (Axel, Grossi)  Not logged in ELOG logo
Message ID: 122     Entry time: Tue Apr 18 17:56:37 2017
Author: Axel Koenig 
Project: common 
Subject: Run summary HPK_CB 
Run Number:  
Events:  
XYPosition:  
Cooling: No 
Data: Unknown 
Alibava run Telescope run File existence check Run type Triggers Remarks
001 604 yes first run, only one chip 450000 none
002 605 yes only one chip 450000 none
003 606 yes angle scan -10 deg 250000 none
004 607 yes angle scan +10 deg 250000 none
005 609 yes Bias scan -50V 150000 none
006 610 yes Bias scan -100V 150000 none
007 611 yes Bias scan -150V 300000 none
008 613 yes Bias scan -250V 150000 none
009 614 yes Long run over night 2400000 run crashed over night
010 616 yes repeated long run ~10000 run crashed

Central beam position: x = 107 mm, y = 2.6 mm, rot = 240 deg

Current was stable for all runs i.e. 80 +- 5 nA at 200 V

Trigger efficiency ~ 65% for all runs (except bias scan).

Temperature in area 20+-1 deg.

Telescope chiller off for all runs.

ELOG V3.1.5-fc6679b