Home CMS Production Clean room MedAustron HEPHY testbeams old
testbeam-rd50-desy-Oct2024 testbeam-RD50-DESY-Apr2024 testbeam-RD50-DESY-Jul2023 testbeam-RD50-CERN-Oct2022 testbeam-DESY-Oct2017 testbeam-DESY-April2017 testbeam-SPS2015 testbeam-SPS2014 testbeam-DESY14 testbeam-SPS12 testbeam-SPS11 testbeam-SPS10 testbeam-SPS09 testbeam-SPS08 LP-TPC
  Alibava/Mapsa testbeam at DESY in April 2017 (Axel, Grossi)  Not logged in ELOG logo
Message ID: 12     Entry time: Thu Apr 13 12:00:40 2017
Author: Axel Koenig 
Project: ALiBaVa (IFX) 
Subject: run_008_IFX_CB_40V.dat 
Run Number: 008 
Events: 175000 
XYPosition: 109, 4.5, 240 
Cooling: No 
Data: Unknown 

Remarks: Telescope run 515. Bias scan 40 V.

Parameter Value
Alibava run run_008_IFX_CB_40V.dat
Telescope run 515
Triggers 175000
Alibava trigger eff. ~58%
Beam energy 5.6 GeV
Telescope threshold 6
Bias voltage -40
Latency 132
Table x 109 mm
Table z 4.5 mm
Tabe rot

240 deg (parallel to tele. planes)

ELOG V3.1.5-fc6679b