Message ID: 119     Entry time: Tue Apr 18 08:07:15 2017
Author: Axel Koenig 
Project: ALiBaVa (IFX) 
Subject: run_010_HPK_CB_200V.dat 
Run Number: 010 
Events: 350000 
XYPosition: 107, 2.6, 240 
Cooling: No 
Data: Unknown 

Remarks: Telescope run 616. Short run central position. Repeated due to crash over night.

No beam during run.Only ~10000 events.

Telescope chiller turned off (could be the root cause of runs crashing).

Parameter Value
Alibava run run_010_HPK_CB_200V.dat
Telescope run 616
Triggers 350000
Alibava trigger eff. ~62%
Beam energy 5.6 GeV
Telescope threshold 6
Bias voltage -200
Latency 132
Table x 107 mm
Table z 2.6 mm
Tabe rot

240 deg