Home CMS Production Clean room MedAustron HEPHY testbeams old
testbeam-RD50-DESY-Jul2023 testbeam-RD50-CERN-Oct2022 testbeam-DESY-Oct2017 testbeam-DESY-April2017 testbeam-SPS2015 testbeam-SPS2014 testbeam-DESY14 testbeam-SPS12 testbeam-SPS11 testbeam-SPS10 testbeam-SPS09 testbeam-SPS08 LP-TPC
  Alibava/Mapsa testbeam at DESY in April 2017 (Axel, Grossi)  Not logged in ELOG logo
Message ID: 118     Entry time: Tue Apr 18 08:04:39 2017
Author: Axel Koenig 
Project: ALiBaVa (IFX) 
Subject: run_004_HPK_CB_200V.dat 
Run Number: 004 
Events: 250000 
XYPosition: 107, 2.6, 250 
Cooling: No 
Data: Unknown 

Remarks: Telescope run 607. Angle scan.

Telescope chiller turned off (could be the root cause of runs crashing).

Parameter Value
Alibava run run_004_HPK_CB_200V.dat
Telescope run 607
Triggers 250000
Alibava trigger eff. ~62%
Beam energy 5.6 GeV
Telescope threshold 6
Bias voltage -200
Latency 132
Table x 107 mm
Table z 2.6 mm
Tabe rot

250 deg

ELOG V3.1.5-fc6679b