Home CMS Production Clean room MedAustron HEPHY testbeams old
testbeam-rd50-desy-Oct2024 testbeam-RD50-DESY-Apr2024 testbeam-RD50-DESY-Jul2023 testbeam-RD50-CERN-Oct2022 testbeam-DESY-Oct2017 testbeam-DESY-April2017 testbeam-SPS2015 testbeam-SPS2014 testbeam-DESY14 testbeam-SPS12 testbeam-SPS11 testbeam-SPS10 testbeam-SPS09 testbeam-SPS08 LP-TPC
  Alibava/Mapsa testbeam at DESY in April 2017 (Axel, Grossi)  Not logged in ELOG logo
Message ID: 108     Entry time: Mon Apr 17 17:25:24 2017
Author: Axel Koenig 
Project: common 
Subject: Telescope geometry ALiBaVa 
Run Number:  
Events:  
XYPosition:  
Cooling: No 
Data: Unknown 

The plane distances are measured at the center of the planes.

The distance of the DUT to the neighbouring planes is measured from the position of the sensor to the center of the planes.

   
Attachment 1: IMG_1522.JPG  1.969 MB  Uploaded Mon Apr 17 18:40:10 2017  | Show | Hide all | Show all
Attachment 2: beam.pdf  16 kB  Uploaded Tue Apr 18 22:41:07 2017
Attachment 3: beam1.pdf  14 kB  Uploaded Tue Apr 18 22:41:33 2017
Attachment 4: beam2.pdf  14 kB  Uploaded Tue Apr 18 22:41:52 2017
ELOG V3.1.5-fc6679b