Home CMS Production Clean room MedAustron HEPHY testbeams old
electronics module assembly SiDDaTA scratch
  HEPHY logbook of the Electronics Group  Not logged in ELOG logo
Message ID: 62     Entry time: Mon Nov 30 19:48:05 2015
Type: Measurement 
Author: Hao Yin 
Project: Belle II 
Subject:  
Object ID: Hardware_Room_With_Cold_I2C 
Measurement Type: system 
Run Number: 001 

ADC Cold diff to hot: 1-3 adc delay config (max 1.5 ns), FIRRun_Cold_001

with room temp i2c config

Temp = 0°C

target: CE

 

Attachment 1: RoomTemp_with_cold_config_ce_p.png  155 kB  Uploaded Tue Dec 1 10:28:58 2015  | Show | Show all
Attachment 2: RoomTemp_with_cold_config_ce_n.png  152 kB  Uploaded Tue Dec 1 10:29:08 2015  | Show | Show all
ELOG V3.1.5-fc6679b