Home CMS Production Clean room MedAustron HEPHY testbeams old
electronics module assembly SiDDaTA scratch
  HEPHY logbook of the Electronics Group  Not logged in ELOG logo
Message ID: 61     Entry time: Mon Nov 30 19:01:54 2015
Type: Measurement 
Author: Hao Yin 
Project: Belle II 
Subject:  
Object ID: Hardware_Cold 
Measurement Type: system 
Run Number: 002 

ADC Cold diff to hot: 1-3 adc delay config (max 1.5 ns), FIRRun_Cold_001

Temp = 0°C

target: CE

 

Attachment 1: Cold_ce_n.png  224 kB  Uploaded Tue Dec 1 11:26:28 2015  | Hide | Hide all | Show all
Cold_ce_n.png
Attachment 2: Cold_ce_p.png  230 kB  Uploaded Tue Dec 1 11:26:28 2015  | Show | Hide all | Show all
ELOG V3.1.5-fc6679b