Home CMS Production Clean room MedAustron HEPHY testbeams old
electronics module assembly SiDDaTA scratch
  HEPHY logbook of the Electronics Group  Not logged in ELOG logo
Message ID: 49     Entry time: Wed May 27 09:30:54 2015
Type: Measurement 
Author: Hao Yin 
Project: Belle II 
Subject:  
Object ID: CAEN PS Primary side 
Measurement Type: system 
Run Number: 000 

Measured Primary side of caen wo load (setup attachment 2 and prelimilary res. attachment 1. )

and with load (attachment 3: Load, att. 4 corresponding circuit scheme)

Attachment 1: P1000776.JPG  4.078 MB  | Show | Hide all | Show all
Attachment 2: P1000774.JPG  4.579 MB  Uploaded Wed May 27 10:32:23 2015  | Show | Hide all | Show all
Attachment 3: P1000777.JPG  4.289 MB  Uploaded Wed May 27 11:06:48 2015  | Show | Hide all | Show all
Attachment 4: P1000780.JPG  3.809 MB  Uploaded Wed May 27 11:09:06 2015  | Hide | Hide all | Show all
P1000780.JPG
ELOG V3.1.5-fc6679b