Home CMS Production Clean room MedAustron HEPHY testbeams old
electronics module assembly SiDDaTA scratch
  HEPHY logbook of the Electronics Group  Not logged in ELOG logo
Message ID: 29     Entry time: Fri May 9 16:44:41 2014
Type: Measurement 
Author: Benedikt Würkner 
Project: Belle II 
Subject: No 3 of 6 room temperature measurements using Sr90 Source (single) 
Object ID: L3 module 
Measurement Type: source 
Run Number: run09 

Sr90 Radioactive Source
No cooling
Module position: -54:0(top center)
HV Turned to +40,-40V with currents. +1.2 and -1.22 µA

N+1.25V current: 0.22A
N+2.50V current: 0.54A
P+1.25V current: 0.26A
P+2.50V current: 0.68A

Events: 200000

Attachment 1: run09_all_hits_apv0.png  192 kB  | Hide | Hide all | Show all
run09_all_hits_apv0.png
Attachment 2: run09_all_hits_apv1.png  195 kB  | Show | Hide all | Show all
Attachment 3: run09_all_hits_apv2.png  191 kB  | Hide | Hide all | Show all
run09_all_hits_apv2.png
Attachment 4: run09_all_hits_apv3.png  191 kB  | Show | Hide all | Show all
Attachment 5: run09_all_hits_apv4.png  188 kB  | Hide | Hide all | Show all
run09_all_hits_apv4.png
Attachment 6: run09_all_hits_apv5.png  194 kB  | Hide | Hide all | Show all
run09_all_hits_apv5.png
Attachment 7: run09_all_hits_apv6.png  187 kB  | Hide | Hide all | Show all
run09_all_hits_apv6.png
Attachment 8: run09_all_hits_apv7.png  188 kB  | Show | Hide all | Show all
Attachment 9: run09_all_hits_apv8.png  189 kB  | Hide | Hide all | Show all
run09_all_hits_apv8.png
Attachment 10: run09_all_hits_apv9.png  191 kB  | Hide | Hide all | Show all
run09_all_hits_apv9.png
ELOG V3.1.5-fc6679b