Home CMS Production Clean room MedAustron HEPHY testbeams old
electronics module assembly SiDDaTA scratch
  HEPHY logbook of the Electronics Group  Not logged in ELOG logo
Message ID: 18     Entry time: Wed May 7 14:36:29 2014
Type: Measurement 
Author: Benedikt Würkner 
Project: Belle II 
Subject: No 1 of 6 room temperature measurements using Sr90 Source (multi6) 
Object ID: L3 module 
Measurement Type: source 
Run Number: run01 

Sr90 Radioactive Source
No cooling
Module position: -5:-20(top left)
HV Turned to +40,-40V with currents. +1.2 and -1.2 µA

N+1.25V current: 0.22A
N+2.5 V current: 0.56A
P+1.25V current: 0.26A
P+2.50V current: 0.70A

Events: 200000

Attachment 1: run01_all_hits_apv0.png  195 kB  Uploaded Wed May 7 15:52:50 2014  | Show | Hide all | Show all
Attachment 2: run01_all_hits_apv1.png  192 kB  Uploaded Wed May 7 15:52:59 2014  | Show | Hide all | Show all
Attachment 3: run01_all_hits_apv2.png  192 kB  Uploaded Wed May 7 15:53:07 2014  | Hide | Hide all | Show all
run01_all_hits_apv2.png
Attachment 4: run01_all_hits_apv3.png  193 kB  Uploaded Wed May 7 15:53:12 2014  | Hide | Hide all | Show all
run01_all_hits_apv3.png
Attachment 5: run01_all_hits_apv4.png  189 kB  Uploaded Wed May 7 15:53:19 2014  | Show | Hide all | Show all
Attachment 6: run01_all_hits_apv5.png  192 kB  Uploaded Wed May 7 15:53:24 2014  | Hide | Hide all | Show all
run01_all_hits_apv5.png
Attachment 7: run01_all_hits_apv6.png  193 kB  Uploaded Wed May 7 15:53:30 2014  | Show | Hide all | Show all
Attachment 8: run01_all_hits_apv7.png  191 kB  Uploaded Wed May 7 15:53:36 2014  | Hide | Hide all | Show all
run01_all_hits_apv7.png
Attachment 9: run01_all_hits_apv8.png  190 kB  Uploaded Wed May 7 15:53:43 2014  | Hide | Hide all | Show all
run01_all_hits_apv8.png
Attachment 10: run01_all_hits_apv9.png  189 kB  Uploaded Wed May 7 15:53:49 2014  | Show | Hide all | Show all
ELOG V3.1.5-fc6679b