Home CMS Production Clean room MedAustron HEPHY testbeams old
testbeam-RD50-DESY-Jul2023 testbeam-RD50-CERN-Oct2022 testbeam-DESY-Oct2017 testbeam-DESY-April2017 testbeam-SPS2015 testbeam-SPS2014 testbeam-DESY14 testbeam-SPS12 testbeam-SPS11 testbeam-SPS10 testbeam-SPS09 testbeam-SPS08 LP-TPC
  Belle testbeam at SPS in June 2015, Page 6 of 6  Not logged in ELOG logo
New entries since:Thu Jan 1 01:00:00 1970
ID Date Author Project Subject Run Numberdown Events XYPosition Cooling Data Text Attachments
  36   Sun Jun 7 14:44:29 2015 Thomas BergauerSVD3 (H6B)XY Stage and DUT Positions    UnknownCoordinate system:

pos x-Direction = Jura side

pos y-Direction = Down
 FWD-BWD.PNGapv-numbering.jpgFWD-BWD_Bemaßung.PNG 
  39   Sun Jun 7 20:02:40 2015 Hao YinBelle II FADC (H6A)Cooling Box Emergency break    UnknownSomething triggered a emergency break.
HWRun012 only last 1-10k event has to be
discarded.
  
  50   Mon Jun 8 11:33:24 2015 Thomas Bergauercommonbeam profile    Unknown120GeV hadrons, beam config H6A.BELLE.003  Beamprofile.png 
  56   Mon Jun 8 16:53:13 2015 Benedikt WürknerSVD3 (H6B)EUTelescope Fitter not working investigation    UnknownApparently every problem can be attributed
to a misalignment problem. The telescope
has troubles with heavily misaligned DUTs.
 nice-alignment.pngbad-alignment.png 
  58   Mon Jun 8 18:08:49 2015 Thomas BergauerSVD3 (H6B)Telescope online monitor    Unknowna working version of the EUDET online monitor
(which works also with the FE-I4) is at the
following location
  
  66   Tue Jun 9 10:01:03 2015 Lukas BullaSVD3 (H6B)TLU setup info    UnknownChannels:


Upstream vertical ->
channel 0; (bitmask 1)
Upstream
 upstream.jpgdownstream.jpg 
  80   Wed Jun 10 18:05:03 2015 Benedikt WürknerSVD3 (H6B)FEI4 configuration   NoUnknownThere are two planes, one fixed upstream
and one fixed downstream. 

CIS3WII_6 upstream and CIS2WI_IBL2
  
ELOG V3.1.5-fc6679b