  22   Sat Jun 6 16:18:48 2015 Benedikt WürknerSVD3 (H6B)hardware runhw00350000  Unknown

Table: 100:70

Bias: +-50V

Run to confirm trigger delay

  24   Sat Jun 6 21:00:15 2015 Benedikt WürknerSVD3 (H6B)first hardware run with TLU and Telescopehw004117171  Unknown

Table: 100:70

Bias: +-50V

600 pedestal

0 offset (at the beginning)

Started APVDAQ and waited till 600 were taken then started EUDAQ

EUDAQ Run 21

Mimosa Thresholds lvl 6

  27   Sun Jun 7 10:36:38 2015 Hao YinBelle II FADC (H6A)Pedestal00610000  Unknown

Cooled, Temp see attachment
FirRun002
 

  30   Sun Jun 7 12:10:24 2015 Benedikt WürknerSVD3 (H6B)Telescope Threshold8b test run 004614399  Unknown

Telescope in combination with SVD3

  31   Sun Jun 7 12:11:42 2015 Benedikt WürknerSVD3 (H6B)Telescope Threshold7 test run 004738175  Unknown

Telescope alone

  32   Sun Jun 7 12:12:00 2015 Benedikt WürknerSVD3 (H6B)Telescope Threshold7 test run 004853356  Unknown

Telescope alone

  36   Sun Jun 7 14:44:29 2015 Thomas BergauerSVD3 (H6B)XY Stage and DUT Positions    Unknown

Coordinate system:

pos x-Direction = Jura side

pos y-Direction = Down

Zero-point is in the top right corner in Beam direction

 

absolute Position of PI Stages:

Pos 1: x=100 mm, y=79 mm (Hits in APV 3 und 8-9 in p-Seite und 14 und 17 in n-Seite )

Pos 2: x=69.3 mm, y=79 mm (Hits in APV 3-4 und 8-9 in p-Seite und 13 und 18 in n-Seite) 

Pos 3: x=38.6 mm, y=84 mm

Pos 4: x=130.7 mm, y=84 mm

Pos 5: x=30.5 mm, y= 99.74 mm (wide side top)

Pos 6: x=136.08 mm, y= 91.49 mm (narrow side top)

Pos 7: x= 30.5 mm, y= 79 mm (wide side center)

Pos 8: x=136.08 mm, y= 79 mm (narrow side center)

Pos 9: x=30.5 mm, y= 60.67 mm (wide side down)

Pos 10: x= 136.08mm, y=68.9 mm (narrow side down)

  38   Sun Jun 7 15:59:05 2015 Hao YinBelle II FADC (H6A)Hardware01250000  Unknown

cooled (see attachment)

FIRRun002, PedestalRun006

target: CE, pos 2

cooling box emergency break ... ie about the last 1-10 k not useable.

  39   Sun Jun 7 20:02:40 2015 Hao YinBelle II FADC (H6A)Cooling Box Emergency break    Unknown

Something triggered a emergency break. HWRun012 only last 1-10k event has to be discarded.

  50   Mon Jun 8 11:33:24 2015 Thomas Bergauercommonbeam profile    Unknown

120GeV hadrons, beam config H6A.BELLE.003

  53   Mon Jun 8 15:03:53 2015 Benedikt WürknerSVD3 (H6B)hardware run with TLU and FEI4 WORKING5919000  Unknown

Testrun with the FEI4 working for the first time. 

Lessons learned about the configuration:

EnableDUTVeto needs to be set for the FEI4 to allow it to work

HandShakeMode needs to be enabled for the FEI4 as well

"Enable RJ45 input during scans" needs to be enabled for the USB-controller

  54   Mon Jun 8 15:49:23 2015 Benedikt WürknerSVD3 (H6B)Hardware FEI4605000010NoUnknown

Hardware run with FEI4, Telescope and FW&BW Modules

Pos 10: x= 136.08mm, y=68.9 mm (narrow side down)

 

Bilder: Hitmap FE-I4 und Correlation zw. Mimosa und FE-I4

  56   Mon Jun 8 16:53:13 2015 Benedikt WürknerSVD3 (H6B)EUTelescope Fitter not working investigation    Unknown

Apparently every problem can be attributed to a misalignment problem. The telescope has troubles with heavily misaligned DUTs. Was resolved by creating different gear-files for each run with pretty precise coordinates of the DUT position calculated for the telescope coordinate system. 

Additionally one has to watch out for misaligned planes of the telescope itself. It was required to allow for more than 2mm offset for the telescope planes behind the DUTs. This can be easily checked by looking at the PreAligner plots in the -hitmaker-histo.root file.

It look something like this:

and not like this:

 

Run number offset value Comment
49 -1  
50 -1 Expected default value. EORE=49401
51 -1 Expected default value. EORE=49400
52 -1 Checked -1 EORE= 49401
53 -1 Checked -1 EORE= 49401
54 -1 Checked -1 EORE= 119401, 
55 -1 Checked -1 EORE= 409388
56 -1 Checked -1 EORE= 49392
57 -1 Checked -1 EORE= 49377
58 -1 Checked -1 EORE= 49397

 

Run Position x-Table x-telescope FW x-telescope BW
49 1 100 -13,7 -16,7
50 2 69,3 17 14
51 3 38,6 47,7 44,7
52 4 130,7 -44,4 -47,4
53 5 30,5 55,8 52,8
54 6 136,8 -50,5 -53,5
55 7 30,5 55,8 52,8
56 8 136,8 -50,5 -53,5
57 9 30,5 55,8 52,8
58 10 136,8 -50,5 -53,5
  57   Mon Jun 8 18:00:06 2015 Benedikt WürknerSVD3 (H6B)Hardware FEI4hw061500002NoUnknown

RUN WITH SVD3, telescope and FEI4

EUDET Run 61

Mimosa Threshold 6

Pos 2: x=69.3 mm, y=79 mm (Hits in APV 3-4 und 8-9 in p-Seite und 13 und 18 in n-Seite) 

  58   Mon Jun 8 18:08:49 2015 Thomas BergauerSVD3 (H6B)Telescope online monitor    Unknown

a working version of the EUDET online monitor (which works also with the FE-I4) is at the following location

~/BELLETEST/eudaq-neu/build/monitors/onlinemon$ ./OnlineMon.exe -sc 0 -f /home/telescope/eudaq/data/run000060.raw

  60   Mon Jun 8 20:16:41 2015 Benedikt WürknerSVD3 (H6B)Hardware FEI462500003NoUnknown

RUN WITH SVD3, telescope and FEI4

EUDET Run 62

Mimosa Threshold 6

Pos 3: x=38.6 mm, y=84 mm

  61   Mon Jun 8 22:11:07 2015 Benedikt WürknerSVD3 (H6B)Hardware FEI4634900004NoUnknown

RUN WITH SVD3, telescope and FEI4

EUDET Run 63

Mimosa Threshold 6

Pos 4: x=130.7 mm, y=84 mm

  64   Tue Jun 9 09:50:15 2015 Benedikt WürknerSVD3 (H6B)Hardware FEI464500005NoUnknown

RUN WITH SVD3, telescope and FEI4

EUDET Run 64

Mimosa Threshold 6

Pos 5: x=30.5 mm, y= 99.74 mm (wide side top)

  66   Tue Jun 9 10:01:03 2015 Lukas BullaSVD3 (H6B)TLU setup info    Unknown

Channels:

  • Upstream vertical -> channel 0; (bitmask 1)
  • Upstream horizontal -> channel 1; (bitmask 2)
  • Downstream vertical -> channel 2; (bitmask 4)
  • Downstream horizontal ->channel 3; (bitmask 8)

 

TLU DuT interface:

DUT Interface Bitmask DAQ
1 1 Mimosa (EUDET Telescope)
2 2 leer
3 4 SVD3
4 8 FE-I4

 

  67   Tue Jun 9 11:20:25 2015 Benedikt WürknerSVD3 (H6B)Vertical Beam Profile Run65500002NoUnknown

Trying to get a nice plot of the beam profile by only using the vertical PMTs (number 0 and 2) see http://elog.hephy.at/testbeam-SPS2015/66 for details. 

Pos 2: x=69.3 mm, y=79 mm (Hits in APV 3-4 und 8-9 in p-Seite und 13 und 18 in n-Seite) 

Producer.TLU Config Change:

  • AndMask=0x5