Home CMS Production Clean room MedAustron HEPHY testbeams old
testbeam-RD50-DESY-Jul2023 testbeam-RD50-CERN-Oct2022 testbeam-DESY-Oct2017 testbeam-DESY-April2017 testbeam-SPS2015 testbeam-SPS2014 testbeam-DESY14 testbeam-SPS12 testbeam-SPS11 testbeam-SPS10 testbeam-SPS09 testbeam-SPS08 LP-TPC
  Belle testbeam at SPS in June 2015, Page 4 of 6  Not logged in ELOG logo
New entries since:Thu Jan 1 01:00:00 1970
Entry  Mon Jun 8 22:11:07 2015, Benedikt Würkner, SVD3 (H6B), Hardware FEI4, 63, 490000, 4, No, Unknown 
RUN WITH SVD3, telescope and FEI4

EUDET Run 63

Mimosa Threshold 6
Entry  Tue Jun 9 09:50:15 2015, Benedikt Würkner, SVD3 (H6B), Hardware FEI4, 64, 50000, 5, No, Unknown 
RUN WITH SVD3, telescope and FEI4

EUDET Run 64

Mimosa Threshold 6
Entry  Tue Jun 9 09:57:56 2015, Hao Yin, Belle II FADC (H6A), Hardware, 019, 62k, 1, No, Good 
room temp

FIRRun002, PedestalRun007, Calibrationrun003
Entry  Tue Jun 9 11:20:25 2015, Benedikt Würkner, SVD3 (H6B), Vertical Beam Profile Run, 65, 50000, 2, No, Unknown 
Trying to get a nice plot of the beam profile by only using the vertical PMTs (number 0 and 2) see http://elog.hephy.at/testbeam-SPS2015/66
for details. 

Pos 2: x=69.3 mm, y=79 mm (Hits in APV 3-4 und 8-9 in p-Seite und 13 und 18 in n-Seite) 
Entry  Tue Jun 9 12:34:16 2015, Benedikt Würkner, SVD3 (H6B), Horizontal Beam Profile Run, 66, 50000, 2, No, Unknown 
Trying to get a nice plot of the beam profile by only using the PMTs 1 and 3 (horizontal)  see http://elog.hephy.at/testbeam-SPS2015/66
for details. 

Pos 2: x=69.3 mm, y=79 mm (Hits in APV 3-4 und 8-9 in p-Seite und 13 und 18 in n-Seite) 
Entry  Tue Jun 9 14:33:50 2015, Benedikt Würkner, SVD3 (H6B), Vertical Beam Profile Run, 67, 50000, 2, No, Unknown 
Trying to get a nice plot of the beam profile by only using the vertical PMT 0 (upstream vertical, the long one)  see http://elog.hephy.at/testbeam-SPS2015/66
for details. 

Pos 2: x=69.3 mm, y=79 mm (Hits in APV 3-4 und 8-9 in p-Seite und 13 und 18 in n-Seite) 
Entry  Tue Jun 9 16:22:59 2015, Benedikt Würkner, SVD3 (H6B), Beam Profile Results, 66 und 67, , 2, No, Good HW_066_002_Result.pdfHW_066_003_Result.pdfHW_067_000_Result.pdfHW_067_001_Result.pdf
 
Entry  Tue Jun 9 20:27:55 2015, Benedikt Würkner, SVD3 (H6B), Hardware FEI4, 68, 503505, 8, No, Unknown 
RUN WITH SVD3, telescope and FEI4

EUDET Run 68

Mimosa Threshold 6
Entry  Tue Jun 9 20:32:46 2015, Hao Yin, Belle II FADC (H6A), Pedestal, 008, 10000, , No, Good 
Room temp, fir004
Entry  Tue Jun 9 20:36:39 2015, Hao Yin, Belle II FADC (H6A), Hardware, 020, 62k, , No, Good 
room temp

FIRRun004, PedestalRun008
telescope alignment
Entry  Wed Jun 10 10:40:24 2015, Hao Yin, Belle II FADC (H6A), Sixlet Calibration, 004, , , No, Good 
room temp
pedestalrun 008
FIRRun004
Entry  Wed Jun 10 11:19:33 2015, Hao Yin, Belle II FADC (H6A), Sixlet Calibration, 005, , , No, Good 
room temp
pedestalrun 008
FIRRun004
Entry  Wed Jun 10 12:03:53 2015, Hao Yin, Belle II FADC (H6A), Sixlet Calibration, 006, , , No, Good 
room temp
pedestalrun 008
FIRRun004
Entry  Wed Jun 10 12:04:27 2015, Hao Yin, Belle II FADC (H6A), Sixlet Calibration, 007, , , No, Good 
room temp
pedestalrun 008
FIRRun004
Entry  Wed Jun 10 18:05:03 2015, Benedikt Würkner, SVD3 (H6B), FEI4 configuration, , , , No, Unknown 
There are two planes, one fixed upstream and one fixed downstream. 

CIS3WII_6 upstream and CIS2WI_IBL2 downstream.

They are configured using the pc in H6B which can be accessed via microsoft remote desktop from the network 192.168.5.x using the ip 192.168.5.6. 
Entry  Wed Jun 10 19:05:04 2015, Benedikt Würkner, SVD3 (H6B), Hardware FEI4, 71, 50000, 1, No, Unknown 
RUN WITH SVD3, telescope and FEI4

EUDET Run 71

Mimosa Threshold 6
Entry  Wed Jun 10 20:54:36 2015, Benedikt Würkner, SVD3 (H6B), Residuals FE-I4 (Upstream), 59, , 10, No, Good run000059-fitter-residuals.pdf
 
Entry  Wed Jun 10 21:36:25 2015, Benedikt Würkner, SVD3 (H6B), Horizontal Beam Profile Run, 72, 50000, 1, No, Good HW_072_002_Result.pdfHW_072_003_Result.pdfHW_072_000_Result.pdfHW_072_001_Result.pdf
Trying to get a nice plot of the beam profile by only using the and 3 (horizontal)  see http://elog.hephy.at/testbeam-SPS2015/66
for details. 

Pos 1: x=100 mm, y=79 mm (Hits
Entry  Thu Jun 11 15:56:32 2015, Benedikt Würkner, SVD3 (H6B), Hardware FEI4, 73, 20000, 7, No, Unknown 
RUN WITH SVD3, telescope and FEI4

EUDET Run 73

Mimosa Threshold 6
Entry  Thu Jun 11 17:11:40 2015, Benedikt Würkner, SVD3 (H6B), Hardware FEI4, 74, 20000, 8, No, Unknown 
RUN WITH SVD3, telescope and FEI4

EUDET Run 74

Mimosa Threshold 6
ELOG V3.1.5-fc6679b