Home CMS Production Clean room MedAustron HEPHY testbeams old
testbeam-RD50-DESY-Jul2023 testbeam-RD50-CERN-Oct2022 testbeam-DESY-Oct2017 testbeam-DESY-April2017 testbeam-SPS2015 testbeam-SPS2014 testbeam-DESY14 testbeam-SPS12 testbeam-SPS11 testbeam-SPS10 testbeam-SPS09 testbeam-SPS08 LP-TPC
  Belle testbeam at SPS in June 2015, Page 4 of 6  Not logged in ELOG logo
New entries since:Thu Jan 1 01:00:00 1970
Entry  Thu Jun 11 16:38:17 2015, Hao Yin, Belle II FADC (H6A), Hardware, 023, , 7, Yes, Good Pos7.PNG
temp: attachment (in 1st col, out 2nd col)

FIRRun002,
PedestalRun010,
Entry  Thu Jun 11 18:01:54 2015, Hao Yin, Belle II FADC (H6A), Hardware, 024, , 6, Yes, Good Pos6.PNG
temp: attachment (in 1st col, out 2nd col)

FIRRun002,
PedestalRun010,
Entry  Thu Jun 11 18:37:11 2015, Hao Yin, Belle II FADC (H6A), Hardware, 025, , 6, Yes, Good pos3.PNG
temp: attachment (in 1st col, out 2nd col)

FIRRun002,
PedestalRun010,
Entry  Fri Jun 12 17:11:45 2015, Hao Yin, Belle II FADC (H6A), Hardware, 026, 50k, 1, No, Good 
room temp

FIRRun002,
PedestalRun012,
Entry  Sat Jun 13 09:09:37 2015, Hao Yin, Belle II FADC (H6A), Hardware, 027, ~200k, 2, No, Good 
room temp

FIRRun002,
PedestalRun012,
Entry  Sat Jun 13 10:07:36 2015, Hao Yin, Belle II FADC (H6A), Hardware, 028, 50k, 4, No, Good 
room temp

FIRRun002,
PedestalRun012,
Entry  Sat Jun 13 13:01:39 2015, Hao Yin, Belle II FADC (H6A), Hardware, 029, , 3, No, Good 
room temp

FIRRun002,
PedestalRun012,
Entry  Sat Jun 13 19:26:26 2015, Hao Yin, Belle II FADC (H6A), Hardware, 030, , 3, No, Good 
room temp

FIRRun002,
PedestalRun012,
Entry  Sat Jun 13 19:29:50 2015, Hao Yin, Belle II FADC (H6A), Hardware, 030, , 1, No, Good 
room temp

FIRRun002,
PedestalRun012,
Entry  Mon Jun 8 15:03:53 2015, Benedikt Würkner, SVD3 (H6B), hardware run with TLU and FEI4 WORKING, 59, 19000, , , Unknown 
Testrun with the FEI4 working for the first time. 

Lessons learned about the configuration:

EnableDUTVeto needs to be set for the FEI4 to allow it to work
Entry  Wed Jun 10 20:54:36 2015, Benedikt Würkner, SVD3 (H6B), Residuals FE-I4 (Upstream), 59, , 10, No, Good run000059-fitter-residuals.pdf
 
Entry  Mon Jun 8 15:49:23 2015, Benedikt Würkner, SVD3 (H6B), Hardware FEI4, 60, 50000, 10, No, Unknown Screenshot_2015-06-08_17.59.50.pngScreenshot_2015-06-08_17.41.03.png
Hardware run with FEI4, Telescope and FW&BW Modules

Pos 10: x= 136.08mm, y=68.9 mm (narrow
side down)
Entry  Mon Jun 8 20:16:41 2015, Benedikt Würkner, SVD3 (H6B), Hardware FEI4, 62, 50000, 3, No, Unknown 
RUN WITH SVD3, telescope and FEI4

EUDET Run 62

Mimosa Threshold 6
Entry  Mon Jun 8 22:11:07 2015, Benedikt Würkner, SVD3 (H6B), Hardware FEI4, 63, 490000, 4, No, Unknown 
RUN WITH SVD3, telescope and FEI4

EUDET Run 63

Mimosa Threshold 6
Entry  Tue Jun 9 09:50:15 2015, Benedikt Würkner, SVD3 (H6B), Hardware FEI4, 64, 50000, 5, No, Unknown 
RUN WITH SVD3, telescope and FEI4

EUDET Run 64

Mimosa Threshold 6
Entry  Tue Jun 9 11:20:25 2015, Benedikt Würkner, SVD3 (H6B), Vertical Beam Profile Run, 65, 50000, 2, No, Unknown 
Trying to get a nice plot of the beam profile by only using the vertical PMTs (number 0 and 2) see http://elog.hephy.at/testbeam-SPS2015/66
for details. 

Pos 2: x=69.3 mm, y=79 mm (Hits in APV 3-4 und 8-9 in p-Seite und 13 und 18 in n-Seite) 
Entry  Tue Jun 9 12:34:16 2015, Benedikt Würkner, SVD3 (H6B), Horizontal Beam Profile Run, 66, 50000, 2, No, Unknown 
Trying to get a nice plot of the beam profile by only using the PMTs 1 and 3 (horizontal)  see http://elog.hephy.at/testbeam-SPS2015/66
for details. 

Pos 2: x=69.3 mm, y=79 mm (Hits in APV 3-4 und 8-9 in p-Seite und 13 und 18 in n-Seite) 
Entry  Tue Jun 9 16:22:59 2015, Benedikt Würkner, SVD3 (H6B), Beam Profile Results, 66 und 67, , 2, No, Good HW_066_002_Result.pdfHW_066_003_Result.pdfHW_067_000_Result.pdfHW_067_001_Result.pdf
 
Entry  Tue Jun 9 14:33:50 2015, Benedikt Würkner, SVD3 (H6B), Vertical Beam Profile Run, 67, 50000, 2, No, Unknown 
Trying to get a nice plot of the beam profile by only using the vertical PMT 0 (upstream vertical, the long one)  see http://elog.hephy.at/testbeam-SPS2015/66
for details. 

Pos 2: x=69.3 mm, y=79 mm (Hits in APV 3-4 und 8-9 in p-Seite und 13 und 18 in n-Seite) 
Entry  Tue Jun 9 20:27:55 2015, Benedikt Würkner, SVD3 (H6B), Hardware FEI4, 68, 503505, 8, No, Unknown 
RUN WITH SVD3, telescope and FEI4

EUDET Run 68

Mimosa Threshold 6
ELOG V3.1.5-fc6679b