Home CMS Production Clean room MedAustron HEPHY testbeams old
testbeam-RD50-DESY-Jul2023 testbeam-RD50-CERN-Oct2022 testbeam-DESY-Oct2017 testbeam-DESY-April2017 testbeam-SPS2015 testbeam-SPS2014 testbeam-DESY14 testbeam-SPS12 testbeam-SPS11 testbeam-SPS10 testbeam-SPS09 testbeam-SPS08 LP-TPC
  Belle testbeam at SPS in June 2015, Page 4 of 6  Not logged in ELOG logo
Entry  Tue Jun 9 09:32:41 2015, Hao Yin, Belle II FADC (H6A), Pedestal, 007, 10000, , , Good 

Room temp, fir002

Entry  Tue Jun 9 20:32:46 2015, Hao Yin, Belle II FADC (H6A), Pedestal, 008, 10000, , No, Good 

Room temp, fir004

Entry  Wed Jun 10 18:52:34 2015, Hao Yin, Belle II FADC (H6A), Pedestal, 009, 10000, , Yes, Good temperature.PNG

temp: in -22 out -18,
FIRRun004,

Entry  Fri Jun 12 17:00:18 2015, Hao Yin, Belle II FADC (H6A), Pedestal, 011, 10000, , No, Good 

cooled pedestal vaules for long sixlet cal

Entry  Fri Jun 12 17:03:02 2015, Hao Yin, Belle II FADC (H6A), Pedestal, 012, 10000, , No, Good 

room temp
FIRRun002
 

Entry  Wed Jun 10 20:54:36 2015, Benedikt Würkner, SVD3 (H6B), Residuals FE-I4 (Upstream), 59, , 10, No, Good run000059-fitter-residuals.pdf
 
Entry  Thu Jun 4 18:49:03 2015, Benedikt Würkner, SVD3 (H6B), Setup, , , , , Unknown IMG_20150604_184442.jpgIMG_20150604_184451.jpgIMG_20150604_184516.jpg
 
Entry  Tue May 12 10:27:39 2015, Benedikt Würkner, SVD3 (H6B), Setup information, , , , , Unknown spider-config.jpg

Information concerning the SVD3 setup during a beam test

In the beam area setup the whole crate and the power supply with the usual spider cable and the two Keithly 2410 high voltage supplies. Monitoring of the 2410 happens via a NI MAX interface that connects to the GPIB-Ethernet interface and needs to be configured there. The IP and password are noted on the device. The software can be found on heros in medialib/LONGTERM/longterm R3.1_doubleSided as a normal *.vi file. 

Default adresses 16 and 17 as defined in labview, need to figure out on site which is which, if the voltage selected (e.g. 100V) is applied as +50/-50 or if it is applied as +100/-100 before connecting the cables. 

Take a run without dut as well to check the telescope integrity. Without dut in beamline!!!!!

Entry  Fri Jun 5 12:02:29 2015, Hao Yin, Belle II FADC (H6A), Sixlet Calibration, 001, , , , Good 

room temp max subevent at 2. with lat = 96

Entry  Fri Jun 5 12:03:34 2015, Hao Yin, Belle II FADC (H6A), Sixlet Calibration, 002, , , , Good 

lat = 97 to a greater range of lat scan

Entry  Fri Jun 5 19:55:00 2015, Hao Yin, Belle II FADC (H6A), Sixlet Calibration, 003, , , , Unknown 

lat = 98

room temp

pedestalrun 003

Entry  Wed Jun 10 10:40:24 2015, Hao Yin, Belle II FADC (H6A), Sixlet Calibration, 004, , , No, Good 

room temp
pedestalrun 008
FIRRun004

max frame pos = 0. frame

[six]
lvl = 20, 30
lat = 95
sam = 20
grp = 8

Entry  Wed Jun 10 11:19:33 2015, Hao Yin, Belle II FADC (H6A), Sixlet Calibration, 005, , , No, Good 

room temp
pedestalrun 008
FIRRun004

max frame pos = 0. frame

[six]
lvl = 20, 30
lat = 96
sam = 20
grp = 8

Entry  Wed Jun 10 12:03:53 2015, Hao Yin, Belle II FADC (H6A), Sixlet Calibration, 006, , , No, Good 

room temp
pedestalrun 008
FIRRun004

max frame pos = 1-2-3. frame n side still shifted

[six]
lvl = 20, 30
lat = 97
sam = 20
grp = 8

Entry  Wed Jun 10 12:04:27 2015, Hao Yin, Belle II FADC (H6A), Sixlet Calibration, 007, , , No, Good 

room temp
pedestalrun 008
FIRRun004

max frame pos = 1-2-3. frame n side still shifted

[six]
lvl = 20, 30
lat = 98
sam = 20
grp = 8

Entry  Wed Jun 10 13:12:33 2015, Hao Yin, Belle II FADC (H6A), Sixlet Calibration, 010, , , Yes, Good 

cooled
pedestalrun 008
FIRRun004

max frame pos = 1-2-3. frame n side still shifted

[six]
lvl = 15, 35
lat = 96
sam = 50
grp = 8

Entry  Thu Jun 11 11:41:50 2015, Hao Yin, Belle II FADC (H6A), Sixlet Calibration, 011, , , Yes, Good 

cooled
pedestalrun 008
FIRRun004

max frame pos = 1-2-3. frame n side still shifted

[six]
lvl = 15, 35
lat = 96
sam = 50
grp = 8

Entry  Thu Jun 11 11:42:39 2015, Hao Yin, Belle II FADC (H6A), Sixlet Calibration, 012, , , Yes, Good 

cooled until about 400k after that room temp
pedestalrun 009
FIRRun005

sixlet calibration run with only ladders

[six]
lvl = 0, 255
lat = 97
sam = 50
grp = 8

Entry  Tue Jun 9 10:01:03 2015, Lukas Bulla, SVD3 (H6B), TLU setup info, , , , , Unknown upstream.jpgdownstream.jpg

Channels:

  • Upstream vertical -> channel 0; (bitmask 1)
  • Upstream horizontal -> channel 1; (bitmask 2)
  • Downstream vertical -> channel 2; (bitmask 4)
  • Downstream horizontal ->channel 3; (bitmask 8)

 

TLU DuT interface:

DUT Interface Bitmask DAQ
1 1 Mimosa (EUDET Telescope)
2 2 leer
3 4 SVD3
4 8 FE-I4

 

Entry  Sun Jun 7 12:11:42 2015, Benedikt Würkner, SVD3 (H6B), Telescope Threshold7 test run , 0047, 38175, , , Unknown 

Telescope alone

ELOG V3.1.5-fc6679b