  Belle testbeam at SPS in June 2015, Page 3 of 6  Not logged in ELOG logo
New entries since:Thu Jan 1 01:00:00 1970
ID Date Author Projectup Subject Run Number Events XYPosition Cooling Data
  81   Wed Jun 10 18:52:34 2015 Hao YinBelle II FADC (H6A)Pedestal00910000 YesGood

temp: in -22 out -18,
FIRRun004,

Attachment 1: temperature.PNG
temperature.PNG
  83   Wed Jun 10 19:07:42 2015 Hao YinBelle II FADC (H6A)Hardware021 5YesGood

temp: in -23 out -20

FIRRun002,
PedestalRun010,
Calibrationrun002

taget: BW

  86   Thu Jun 11 11:41:50 2015 Hao YinBelle II FADC (H6A)Sixlet Calibration011  YesGood

cooled
pedestalrun 008
FIRRun004

max frame pos = 1-2-3. frame n side still shifted

[six]
lvl = 15, 35
lat = 96
sam = 50
grp = 8

  87   Thu Jun 11 11:42:39 2015 Hao YinBelle II FADC (H6A)Sixlet Calibration012  YesGood

cooled until about 400k after that room temp
pedestalrun 009
FIRRun005

sixlet calibration run with only ladders

[six]
lvl = 0, 255
lat = 97
sam = 50
grp = 8

  89   Thu Jun 11 16:35:14 2015 Hao YinBelle II FADC (H6A)Hardware022 5YesGood

temp: in -23 out -20

FIRRun002,
PedestalRun010,
Calibrationrun002

taget: BW, pos 5

  90   Thu Jun 11 16:38:17 2015 Hao YinBelle II FADC (H6A)Hardware023 7YesGood

temp: attachment (in 1st col, out 2nd col)

FIRRun002,
PedestalRun010,
Calibrationrun002

taget: CE, pos 7

Attachment 1: Pos7.PNG
Pos7.PNG
  92   Thu Jun 11 18:01:54 2015 Hao YinBelle II FADC (H6A)Hardware024 6YesGood

temp: attachment (in 1st col, out 2nd col)

FIRRun002,
PedestalRun010,
Calibrationrun002

taget: -z, pos 6

Attachment 1: Pos6.PNG
Pos6.PNG
  93   Thu Jun 11 18:37:11 2015 Hao YinBelle II FADC (H6A)Hardware025 6YesGood

temp: attachment (in 1st col, out 2nd col)

FIRRun002,
PedestalRun010,
Calibrationrun002

taget: ce, pos 3

Attachment 1: pos3.PNG
pos3.PNG
  94   Fri Jun 12 09:31:58 2015 Hao YinBelle II FADC (H6A)FIR005  YesGood

FIR filer and ADC delay for long sixlet cal run.

  96   Fri Jun 12 17:00:18 2015 Hao YinBelle II FADC (H6A)Pedestal01110000 NoGood

cooled pedestal vaules for long sixlet cal

  97   Fri Jun 12 17:03:02 2015 Hao YinBelle II FADC (H6A)Pedestal01210000 NoGood

room temp
FIRRun002
 

  99   Fri Jun 12 17:11:45 2015 Hao YinBelle II FADC (H6A)Hardware02650k1NoGood

room temp

FIRRun002,
PedestalRun012,
CalibrationRun003

L3 rotated.
taget: bw, pos 1
 

  100   Sat Jun 13 09:09:37 2015 Hao YinBelle II FADC (H6A)Hardware027~200k2NoGood

room temp

FIRRun002,
PedestalRun012,
CalibrationRun003

L3 rotated.
taget: CE, pos 1
 

  101   Sat Jun 13 10:07:36 2015 Hao YinBelle II FADC (H6A)Hardware02850k4NoGood

room temp

FIRRun002,
PedestalRun012,
CalibrationRun003

L3 rotated.
taget: FW, pos 4
 

  102   Sat Jun 13 13:01:39 2015 Hao YinBelle II FADC (H6A)Hardware029 3NoGood

room temp

FIRRun002,
PedestalRun012,
CalibrationRun003

L3 rotated.
taget: CE, pos 3
 

  107   Sat Jun 13 19:26:26 2015 Hao YinBelle II FADC (H6A)Hardware030 3NoGood

room temp

FIRRun002,
PedestalRun012,
CalibrationRun003

wo L3 and L4
taget: CE, pos 3
 

  108   Sat Jun 13 19:29:50 2015 Hao YinBelle II FADC (H6A)Hardware030 1NoGood

room temp

FIRRun002,
PedestalRun012,
CalibrationRun003

wo L3 and L4
taget: bw, pos 1
 

  1   Tue May 12 10:27:39 2015 Benedikt WürknerSVD3 (H6B)Setup information    Unknown

Information concerning the SVD3 setup during a beam test

In the beam area setup the whole crate and the power supply with the usual spider cable and the two Keithly 2410 high voltage supplies. Monitoring of the 2410 happens via a NI MAX interface that connects to the GPIB-Ethernet interface and needs to be configured there. The IP and password are noted on the device. The software can be found on heros in medialib/LONGTERM/longterm R3.1_doubleSided as a normal *.vi file. 

Default adresses 16 and 17 as defined in labview, need to figure out on site which is which, if the voltage selected (e.g. 100V) is applied as +50/-50 or if it is applied as +100/-100 before connecting the cables. 

Take a run without dut as well to check the telescope integrity. Without dut in beamline!!!!!

Attachment 1: spider-config.jpg
spider-config.jpg
  9   Thu Jun 4 18:49:03 2015 Benedikt WürknerSVD3 (H6B)Setup    Unknown
Attachment 1: IMG_20150604_184442.jpg
IMG_20150604_184442.jpg
Attachment 2: IMG_20150604_184451.jpg
IMG_20150604_184451.jpg
Attachment 3: IMG_20150604_184516.jpg
IMG_20150604_184516.jpg
  20   Sat Jun 6 16:14:36 2015 Benedikt WürknerSVD3 (H6B)calibration run and setup informationcal01   Unknown

Calibration Run with +- 50V Bias with higher compliance since the p-side draws more current than expected (23muA by the MAMBO)

 