Home CMS Production Clean room MedAustron HEPHY testbeams old
testbeam-RD50-DESY-Jul2023 testbeam-RD50-CERN-Oct2022 testbeam-DESY-Oct2017 testbeam-DESY-April2017 testbeam-SPS2015 testbeam-SPS2014 testbeam-DESY14 testbeam-SPS12 testbeam-SPS11 testbeam-SPS10 testbeam-SPS09 testbeam-SPS08 LP-TPC
  Belle testbeam at SPS in June 2015, Page 3 of 6  Not logged in ELOG logo
New entries since:Thu Jan 1 01:00:00 1970
Entry  Tue Jun 9 20:36:39 2015, Hao Yin, Belle II FADC (H6A), Hardware, 020, 62k, , No, Good 
room temp

FIRRun004, PedestalRun008
telescope alignment
Entry  Wed Jun 10 10:40:24 2015, Hao Yin, Belle II FADC (H6A), Sixlet Calibration, 004, , , No, Good 
room temp
pedestalrun 008
FIRRun004
Entry  Wed Jun 10 11:19:33 2015, Hao Yin, Belle II FADC (H6A), Sixlet Calibration, 005, , , No, Good 
room temp
pedestalrun 008
FIRRun004
Entry  Wed Jun 10 12:03:53 2015, Hao Yin, Belle II FADC (H6A), Sixlet Calibration, 006, , , No, Good 
room temp
pedestalrun 008
FIRRun004
Entry  Wed Jun 10 12:04:27 2015, Hao Yin, Belle II FADC (H6A), Sixlet Calibration, 007, , , No, Good 
room temp
pedestalrun 008
FIRRun004
Entry  Wed Jun 10 13:12:33 2015, Hao Yin, Belle II FADC (H6A), Sixlet Calibration, 010, , , Yes, Good 
cooled
pedestalrun 008
FIRRun004
Entry  Wed Jun 10 18:05:03 2015, Benedikt Würkner, SVD3 (H6B), FEI4 configuration, , , , No, Unknown 
There are two planes, one fixed upstream and one fixed downstream. 

CIS3WII_6 upstream and CIS2WI_IBL2 downstream.

They are configured using the pc in H6B which can be accessed via microsoft remote desktop from the network 192.168.5.x using the ip 192.168.5.6. 
Entry  Wed Jun 10 18:52:34 2015, Hao Yin, Belle II FADC (H6A), Pedestal, 009, 10000, , Yes, Good temperature.PNG
temp: in -22 out -18,
FIRRun004,
Entry  Thu Jun 11 11:41:50 2015, Hao Yin, Belle II FADC (H6A), Sixlet Calibration, 011, , , Yes, Good 
cooled
pedestalrun 008
FIRRun004
Entry  Thu Jun 11 11:42:39 2015, Hao Yin, Belle II FADC (H6A), Sixlet Calibration, 012, , , Yes, Good 
cooled until about 400k after that room temp
pedestalrun 009
FIRRun005
Entry  Fri Jun 12 09:31:58 2015, Hao Yin, Belle II FADC (H6A), FIR, 005, , , Yes, Good 
FIR filer and ADC delay for long sixlet cal run.
Entry  Fri Jun 12 16:52:52 2015, Benedikt Würkner, SVD3 (H6B), Telescope without DUT, 76, ~30k, , No, Good Telescope_without_DUT.png
Threshold 6

Testrun to see how the telescope behaves without a DUT to test if there is an increased amount of multiple scattering after the aluminum planes
of the FW and BW module. 
Entry  Fri Jun 12 17:00:18 2015, Hao Yin, Belle II FADC (H6A), Pedestal, 011, 10000, , No, Good 
cooled pedestal vaules for long sixlet cal
Entry  Fri Jun 12 17:03:02 2015, Hao Yin, Belle II FADC (H6A), Pedestal, 012, 10000, , No, Good 
room temp
FIRRun002
 
Entry  Fri Jun 12 17:08:23 2015, Benedikt Würkner, SVD3 (H6B), Telescope with FEI4, 80, ~30k, , No, Good 
Threshold 6

Testrun to see how the telescope behaves without a DUT to test if there is an increased amount of multiple scattering after the aluminum planes
of the FW and BW module. 
Entry  Sat Jun 13 16:47:28 2015, Benedikt Würkner, SVD3 (H6B), Mimosa threshold with FEI4, 82, 12000, , No, Good 
Set mimosa threshold to 5 and recorded with FEI4 upstream

L3 already in sensor but not yet configured. 

Probably to noisy to help much
Entry  Thu Jun 4 15:12:41 2015, Hao Yin, Belle II FADC (H6A), Hardware, 001, 50000, 1, No, Good 20x
PedestalRun001, FIRRun001, room temp
telescope n-side switched.
In order to correct the position change the
Entry  Sun Jun 7 13:18:20 2015, Benedikt Würkner, SVD3 (H6B), hardware run with TLU and Telescope, hw008, 53670, 1, No, Good 
FIRST GOOD RUN WITH SVD3 plus telescope

EUDET Run 49

Mimosa Threshold 7
Entry  Tue Jun 9 09:57:56 2015, Hao Yin, Belle II FADC (H6A), Hardware, 019, 62k, 1, No, Good 
room temp

FIRRun002, PedestalRun007, Calibrationrun003
Entry  Wed Jun 10 19:05:04 2015, Benedikt Würkner, SVD3 (H6B), Hardware FEI4, 71, 50000, 1, No, Unknown 
RUN WITH SVD3, telescope and FEI4

EUDET Run 71

Mimosa Threshold 6
ELOG V3.1.5-fc6679b