Home CMS Production Clean room MedAustron HEPHY testbeams old
testbeam-RD50-DESY-Jul2023 testbeam-RD50-CERN-Oct2022 testbeam-DESY-Oct2017 testbeam-DESY-April2017 testbeam-SPS2015 testbeam-SPS2014 testbeam-DESY14 testbeam-SPS12 testbeam-SPS11 testbeam-SPS10 testbeam-SPS09 testbeam-SPS08 LP-TPC
  Belle testbeam at SPS in June 2015  Not logged in ELOG logo
Message ID: 66     Entry time: Tue Jun 9 10:01:03 2015
Author: Lukas Bulla 
Project: SVD3 (H6B) 
Subject: TLU setup info 
Run Number:  
Events:  
XYPosition:  
Cooling:  
Data: Unknown 

Channels:

  • Upstream vertical -> channel 0; (bitmask 1)
  • Upstream horizontal -> channel 1; (bitmask 2)
  • Downstream vertical -> channel 2; (bitmask 4)
  • Downstream horizontal ->channel 3; (bitmask 8)

 

TLU DuT interface:

DUT Interface Bitmask DAQ
1 1 Mimosa (EUDET Telescope)
2 2 leer
3 4 SVD3
4 8 FE-I4

 

Attachment 1: upstream.jpg  1.235 MB  | Show | Hide all | Show all
Attachment 2: downstream.jpg  1.484 MB  | Hide | Hide all | Show all
downstream.jpg
ELOG V3.1.5-fc6679b