Home CMS Production Clean room MedAustron HEPHY testbeams old
testbeam-RD50-DESY-Apr2024 testbeam-RD50-DESY-Jul2023 testbeam-RD50-CERN-Oct2022 testbeam-DESY-Oct2017 testbeam-DESY-April2017 testbeam-SPS2015 testbeam-SPS2014 testbeam-DESY14 testbeam-SPS12 testbeam-SPS11 testbeam-SPS10 testbeam-SPS09 testbeam-SPS08 LP-TPC
  Belle testbeam at SPS in June 2015  Not logged in ELOG logo
Message ID: 38     Entry time: Sun Jun 7 15:59:05 2015
Author: Hao Yin 
Project: Belle II FADC (H6A) 
Subject: Hardware 
Run Number: 012 
Events: 50000 
XYPosition:  
Cooling:  
Data: Unknown 

cooled (see attachment)

FIRRun002, PedestalRun006

target: CE, pos 2

cooling box emergency break ... ie about the last 1-10 k not useable.

Attachment 1: Pos3.PNG  417 kB  Uploaded Sun Jun 7 17:01:38 2015  | Show | Show all
ELOG V3.1.5-fc6679b