Home CMS Production Clean room MedAustron HEPHY testbeams old
testbeam-RD50-DESY-Jul2023 testbeam-RD50-CERN-Oct2022 testbeam-DESY-Oct2017 testbeam-DESY-April2017 testbeam-SPS2015 testbeam-SPS2014 testbeam-DESY14 testbeam-SPS12 testbeam-SPS11 testbeam-SPS10 testbeam-SPS09 testbeam-SPS08 LP-TPC
  Belle/Infineon/AIDA testbeam at SPS in Nov 2014, Page 5 of 6  Not logged in ELOG logo
IDdown Date Author Project Subject Run Number Events StartTime EndTime Data
  39   Wed Nov 19 16:24:25 2014 Axel KönigcommonRunning EUDAQ    Unknown

Windows PC at Telescope:

0.) JTAG Programming: Chose a threshold file (recommended threshold 5) File: M26TB_Cern_2011.thresh5.mcf--> press start

1.) C:\Users\telescope\Desktop\users\BelleII --> start Mimosa 26 Telescope --> select all six Mimosa's

2.) C:\Users\telescope\Desktop\users\BelleII --> start startEudaq_fullWindows.bat

3.) Use configuration file hephy1 (location: C:\eudaq\conf). Change it according to your TLU settings (DUT mask, AND mask, etc.)

4.) configure

5.) start

x) Online monitor in preparation

Files: Are saved in C:\eudaq\data with internal numbering "run000000xxx.raw" (look at the date and time). [You can connect locally to this folder at HEPHY-SVD PC]

  38   Wed Nov 19 09:26:39 2014 Axel KönigInfineonhardware runInfineon_run0061500  Unknown

Infineon new stack - batch 4

multi hit
 
HV=300V, total I = 4.0200 µA
 
strips vertical
 
Table Position: H: 96mm V: 91mm
 
data file in L:\cern14\infineon\Infineon Run vert
 
config file l:\cern14\infineon\Infineon Run horiz\cern14_infineon_multi6.cfg
 
-- stopped --
1500 Events only --> no trigger signals from TU (01:30 Uhr)
  37   Wed Nov 19 00:58:27 2014 Axel KönigInfineonhardware runInfineon_run00587000  Unknown

Infineon new stack - batch 4 

multi hit
 
HV=300V, total I = 4.0200 µA
 
strips vertical
 
Table Position: H: 96mm V: 81mm
 
data file in L:\cern14\infineon\Infineon Run vert
 
config file l:\cern14\infineon\Infineon Run horiz\cern14_infineon_multi6.cfg
 
--stopped 19.11 // 01:00 --
Reason: Enough events, new dut postion for next multi run
Events: 87000
  36   Tue Nov 18 23:04:34 2014 Axel KönigInfineonhardware runInfineon_run004400000  Unknown

Infineon new stack - batch 4 

single hit
 
HV=300V, total I = 4.0044 µA
 
strips vertical
 
Table Position: H: 96mm V: 81mm
 
data file in L:\cern14\infineon\Infineon Run vert
 
config file l:\cern14\infineon\Infineon Run horiz\cern14_infineon_single.cfg
 
--stopped 18.11 // 23:05---
Reason: Enough events, next run with the same position but now multi six
Events: 400000
 
  35   Tue Nov 18 20:42:18 2014 Benedikt WürknerBelle SVDCoordinates of the DUT    Unknown

We set the coordinates trying to put the beam in an area with well working APVs

Peak of course differs for n and p sensors due to their different pitch.

L4-6 n-side Peak around strip 180

L4&6 p-side mean value around strip 380

L5 p-side moved by 4.8mm due to reasons (APV misalignment I think) therefore the peak of the same measurements is moved by 4.8/75µm = 64 strips therefore centered around strip 320

The coordinates of the x-y table were set to 0:0 at this point. Refer to Run Alignment2 for reference data.

  33   Tue Nov 18 20:26:12 2014 Hao YinBelle SVDHardwareRun_001  Tue Nov 18 18:21:50 CET 2014 Unknown

At room temperature

Latest ADC scan and FIR run.

Latest CAL.

 

Position: 0.0, see elog entry.

  32   Tue Nov 18 18:45:01 2014 Hao YinBelle SVDTrigger Delay scan  Tue Nov 18 18:21:50 CET 2014 Unknown

At room temperature

First run was at: 23 (no track)

 

TimingRun_001:

Trigger delay: 26

 

TimingRun_002:

Trigger delay: 29

 

TimingRun_003:

Trigger delay: 32


 

TimingRun_004:

Trigger delay: 20

 
 

TimingRun_005:

Trigger delay: 17

 

TimingRun_005:

Trigger delay: 14
Trigger chip delay: 110

 

 

 

  31   Tue Nov 18 18:33:31 2014 Axel KönigInfineonhardware runInfineon_run003300000  Unknown

Infineon new stack - batch 4

single hit

HV=300V, total I = 4.0044 µA

strips vertical

Table Position: H: 96mm V: 101mm

data file in L:\cern14\infineon\Infineon Run vert

config file l:\cern14\infineon\Infineon Run horiz\cern14_infineon_single.cfg

 

--Stopped 18.11 / 20:20---

Reason: Enough events, adjusting new DUT position for next run

Events: 300000

  30   Tue Nov 18 18:29:55 2014 Axel KönigInfineoncalibration runInfineon_run002   Unknown

Infineon_run002 is just a calibration run for the vertical positioned sensors. 

data file in L:\cern14\infineon\Infineon Run vert
config file l:\cern14\infineon\Infineon Run horiz\cern14_infineon_single.cfg
  29   Tue Nov 18 13:13:53 2014 Thomas BergauerInfineonhardware runinfineon_run001225508  Unknown

Infineon new stack - batch 4

single hit
 
HV=300V, total I = 4.2475 µA
 
strips horizontal
 
data file in L:\cern14\infineon\Infineon Run horiz
config file l:\cern14\infineon\Infineon Run horiz\cern14_infineon_single.cfg
 
 
STOPPED by main User in H6B (18:11, 15:00)
 
Events: 225508
Next step: rearange modules vertically
 
  28   Tue Nov 18 12:35:32 2014 Axel KönigcommonInfineon (4 modules) TLU Settings    Unknown
  1.  VNC to 192.168.0.18
  2. In command line: cd C:\Users\telescope\eudaq\bin
  3. TLUControl.exe.exe -d 2 -a 11 - i RJ45

Operating with AIDA telescope: TLUControl.exe.exe -d 3 -a 11 - i RJ45

Dut Position (left to right):  11, 06, 05, 07

  27   Tue Nov 18 10:26:56 2014 Hao YinBelle SVDCalibrationRun_003  Tue Nov 18 10:26:52 CET 2014 Unknown

At room temperature

Latest delay and FIRRun 

  26   Tue Nov 18 10:12:25 2014 Hao YinBelle SVD6let PedestalRun_005 10000Tue Nov 18 10:11:45 CET 2014 Unknown

At room temperature

Latest delay, FIRRun002. 

Check for bad strips.

  25   Tue Nov 18 09:51:11 2014 Hao Yin CalibrationRun_002  Tue Nov 18 09:50:24 CET 2014 Unknown

At room temperature

PedestalRun004 

Latest delay settings and FIRRun

  24   Tue Nov 18 09:48:53 2014 Hao YinBelle SVDPedestalRun_004 10000Tue Nov 18 09:48:30 CET 2014 Unknown

At room temperature.

Old delay settings and FIRRun_002

 

  23   Tue Nov 18 09:45:59 2014 Hao Yin FIRRun_002002 Tue Nov 18 09:45:58 CET 2014 Unknown

New FIR run after reconecting to original setting. 

  22   Tue Nov 18 01:05:04 2014 Hao YinBelle SVDPedestalRun_003  Tue Nov 18 01:03:32 CET 2014 Unknown

New pedestal run after switching the connectors.

At room temperature 

  21   Tue Nov 18 01:03:18 2014 Hao YinBelle SVDRemapped FADC inputs  Tue Nov 18 01:03:32 CET 2014 Unknown

We moved the second cable to the third connector on the FADC to match DESY testbeam conditions. 

  20   Mon Nov 17 23:04:57 2014 Hao YinBelle SVDPedestalRun_002 10338Mon Nov 17 23:03:03 CET 2014 Unknown

Pedestal run at room temperature.

6 subevents. Noise reference run.

Delay as latest run.

 

Reference run for bad strips.

  19   Mon Nov 17 22:28:09 2014 Hao Yin CalibrationRun001 Mon Nov 17 22:27:07 CET 2014 Unknown

Noise file from run 001 

PedestalRun_001

FIRRun_001

At room temperature

See DelayRun_001

 

ELOG V3.1.5-fc6679b