Home CMS Production Clean room MedAustron HEPHY testbeams old
testbeam-RD50-DESY-Jul2023 testbeam-RD50-CERN-Oct2022 testbeam-DESY-Oct2017 testbeam-DESY-April2017 testbeam-SPS2015 testbeam-SPS2014 testbeam-DESY14 testbeam-SPS12 testbeam-SPS11 testbeam-SPS10 testbeam-SPS09 testbeam-SPS08 LP-TPC
  Belle/Infineon/AIDA testbeam at SPS in Nov 2014, Page 3 of 6  Not logged in ELOG logo
ID Date Author Project Subject Run Number Events StartTime EndTime Dataup
  27   Tue Nov 18 10:26:56 2014 Hao YinBelle SVDCalibrationRun_003  Tue Nov 18 10:26:52 CET 2014 Unknown

At room temperature

Latest delay and FIRRun 

  28   Tue Nov 18 12:35:32 2014 Axel KönigcommonInfineon (4 modules) TLU Settings    Unknown
  1.  VNC to 192.168.0.18
  2. In command line: cd C:\Users\telescope\eudaq\bin
  3. TLUControl.exe.exe -d 2 -a 11 - i RJ45

Operating with AIDA telescope: TLUControl.exe.exe -d 3 -a 11 - i RJ45

Dut Position (left to right):  11, 06, 05, 07

  29   Tue Nov 18 13:13:53 2014 Thomas BergauerInfineonhardware runinfineon_run001225508  Unknown

Infineon new stack - batch 4

single hit
 
HV=300V, total I = 4.2475 µA
 
strips horizontal
 
data file in L:\cern14\infineon\Infineon Run horiz
config file l:\cern14\infineon\Infineon Run horiz\cern14_infineon_single.cfg
 
 
STOPPED by main User in H6B (18:11, 15:00)
 
Events: 225508
Next step: rearange modules vertically
 
  30   Tue Nov 18 18:29:55 2014 Axel KönigInfineoncalibration runInfineon_run002   Unknown

Infineon_run002 is just a calibration run for the vertical positioned sensors. 

data file in L:\cern14\infineon\Infineon Run vert
config file l:\cern14\infineon\Infineon Run horiz\cern14_infineon_single.cfg
  31   Tue Nov 18 18:33:31 2014 Axel KönigInfineonhardware runInfineon_run003300000  Unknown

Infineon new stack - batch 4

single hit

HV=300V, total I = 4.0044 µA

strips vertical

Table Position: H: 96mm V: 101mm

data file in L:\cern14\infineon\Infineon Run vert

config file l:\cern14\infineon\Infineon Run horiz\cern14_infineon_single.cfg

 

--Stopped 18.11 / 20:20---

Reason: Enough events, adjusting new DUT position for next run

Events: 300000

  32   Tue Nov 18 18:45:01 2014 Hao YinBelle SVDTrigger Delay scan  Tue Nov 18 18:21:50 CET 2014 Unknown

At room temperature

First run was at: 23 (no track)

 

TimingRun_001:

Trigger delay: 26

 

TimingRun_002:

Trigger delay: 29

 

TimingRun_003:

Trigger delay: 32


 

TimingRun_004:

Trigger delay: 20

 
 

TimingRun_005:

Trigger delay: 17

 

TimingRun_005:

Trigger delay: 14
Trigger chip delay: 110

 

 

 

  33   Tue Nov 18 20:26:12 2014 Hao YinBelle SVDHardwareRun_001  Tue Nov 18 18:21:50 CET 2014 Unknown

At room temperature

Latest ADC scan and FIR run.

Latest CAL.

 

Position: 0.0, see elog entry.

  35   Tue Nov 18 20:42:18 2014 Benedikt WürknerBelle SVDCoordinates of the DUT    Unknown

We set the coordinates trying to put the beam in an area with well working APVs

Peak of course differs for n and p sensors due to their different pitch.

L4-6 n-side Peak around strip 180

L4&6 p-side mean value around strip 380

L5 p-side moved by 4.8mm due to reasons (APV misalignment I think) therefore the peak of the same measurements is moved by 4.8/75µm = 64 strips therefore centered around strip 320

The coordinates of the x-y table were set to 0:0 at this point. Refer to Run Alignment2 for reference data.

  36   Tue Nov 18 23:04:34 2014 Axel KönigInfineonhardware runInfineon_run004400000  Unknown

Infineon new stack - batch 4 

single hit
 
HV=300V, total I = 4.0044 µA
 
strips vertical
 
Table Position: H: 96mm V: 81mm
 
data file in L:\cern14\infineon\Infineon Run vert
 
config file l:\cern14\infineon\Infineon Run horiz\cern14_infineon_single.cfg
 
--stopped 18.11 // 23:05---
Reason: Enough events, next run with the same position but now multi six
Events: 400000
 
  37   Wed Nov 19 00:58:27 2014 Axel KönigInfineonhardware runInfineon_run00587000  Unknown

Infineon new stack - batch 4 

multi hit
 
HV=300V, total I = 4.0200 µA
 
strips vertical
 
Table Position: H: 96mm V: 81mm
 
data file in L:\cern14\infineon\Infineon Run vert
 
config file l:\cern14\infineon\Infineon Run horiz\cern14_infineon_multi6.cfg
 
--stopped 19.11 // 01:00 --
Reason: Enough events, new dut postion for next multi run
Events: 87000
  38   Wed Nov 19 09:26:39 2014 Axel KönigInfineonhardware runInfineon_run0061500  Unknown

Infineon new stack - batch 4

multi hit
 
HV=300V, total I = 4.0200 µA
 
strips vertical
 
Table Position: H: 96mm V: 91mm
 
data file in L:\cern14\infineon\Infineon Run vert
 
config file l:\cern14\infineon\Infineon Run horiz\cern14_infineon_multi6.cfg
 
-- stopped --
1500 Events only --> no trigger signals from TU (01:30 Uhr)
  39   Wed Nov 19 16:24:25 2014 Axel KönigcommonRunning EUDAQ    Unknown

Windows PC at Telescope:

0.) JTAG Programming: Chose a threshold file (recommended threshold 5) File: M26TB_Cern_2011.thresh5.mcf--> press start

1.) C:\Users\telescope\Desktop\users\BelleII --> start Mimosa 26 Telescope --> select all six Mimosa's

2.) C:\Users\telescope\Desktop\users\BelleII --> start startEudaq_fullWindows.bat

3.) Use configuration file hephy1 (location: C:\eudaq\conf). Change it according to your TLU settings (DUT mask, AND mask, etc.)

4.) configure

5.) start

x) Online monitor in preparation

Files: Are saved in C:\eudaq\data with internal numbering "run000000xxx.raw" (look at the date and time). [You can connect locally to this folder at HEPHY-SVD PC]

  40   Wed Nov 19 18:20:29 2014 Axel KönigInfineoncalibration runInfineon_run007_cal   Unknown
  42   Wed Nov 19 20:04:53 2014 Hao YinBelle SVDPedestalRun_006    Unknown

Temperature: See attachment

FIRFilterRun_002

Layer 3-n side deactivated, because Hao broke it.

Attachment 1: Temp_19-11-14.PNG
Temp_19-11-14.PNG
  43   Wed Nov 19 20:07:05 2014 Hao YinBelle SVDHardwareRun_002    Unknown

Multi-6 cooled.

See latest Noise, and PedestalRun.

 

  44   Wed Nov 19 21:56:44 2014 Axel KönigInfineonhardware runInfineon_run008244167  Unknown

Infineon new stack - batch 4 

single hit
 
HV=300V, total I = 4.0758 µA
 
strips vertical
 
Table Position: H: 92.5mm V: 81mm
 
data file in L:\cern14\infineon\Infineon Run vert
 
config file l:\cern14\infineon\Infineon Run horiz\cern14_infineon_single.cfg
 
--stopped 19.11 // 21:53 --
Reason: Want to run the eudaq for the next run
Events: 244167
  45   Wed Nov 19 22:15:41 2014 Axel KönigInfineonhardware runInfineon_run0101498709  Unknown

Infineon new stack - batch 4 

 
single hit
 
HV=300V, total I = 4.0200 µA
 
strips vertical
 
Table Position: H: 92.5mm V: 81mm
 
EUDAQ data: Run951 and Run952
 
data file in L:\cern14\infineon\Infineon Run vert
 
config file l:\cern14\infineon\Infineon Run horiz\cern14_infineon_multi6.cfg
 
-- stopped 20.11 / 09:35-- 
 
SVD3DAQ Events: 1498709
EUDAQ Events: 2777
 
EUDAQ stopped counting events --> log entry: "01:38 6-ERROR unexpected trigger number 277714 (expecting 277713)" (TLU Producer)
  46   Wed Nov 19 22:25:29 2014 Hao YinBelle SVDPedestalRun_008 [CheckLayout]    Unknown

cooled (temperature see attachment latest noise run),

latest Noise, FIR settings with the right layout mapping.

  48   Wed Nov 19 23:15:50 2014 Hao YinBelle SVDHardwareRun_003    Unknown

cooled, latest noise, cal, PedestalRun.

Rawmode

  49   Wed Nov 19 23:31:08 2014 Hao YinBelle SVDHardwareRun_004    Unknown

Same as HardwareRun_003 but with ZS.  

ELOG V3.1.5-fc6679b