Home CMS Production Clean room MedAustron HEPHY testbeams old
testbeam-RD50-DESY-Jul2023 testbeam-RD50-CERN-Oct2022 testbeam-DESY-Oct2017 testbeam-DESY-April2017 testbeam-SPS2015 testbeam-SPS2014 testbeam-DESY14 testbeam-SPS12 testbeam-SPS11 testbeam-SPS10 testbeam-SPS09 testbeam-SPS08 LP-TPC
  Belle/Infineon/AIDA testbeam at SPS in Nov 2014, Page 3 of 6  Not logged in ELOG logo
ID Date Author Project Subject Run Number Eventsdown StartTime EndTime Data Text Attachments
  71   Fri Nov 21 15:02:28 2014 Benedikt WürknerBelle SVDHardwareRun0131433  Unknowncooled see appendix (FirRun003)
PedestalRun_010
multi 6 Raw Mode
  
  20   Mon Nov 17 23:04:57 2014 Hao YinBelle SVDPedestalRun_002 10338Mon Nov 17 23:03:03 CET 2014 UnknownPedestal run at room temperature.
6 subevents. Noise reference run.
Delay as latest run.
  
  118   Sun Nov 23 15:13:37 2014 Markus FriedlBelle SVDHardwareRun00310060023.11.2014 14:07:2323.11.2014 16:51:27GoodHardware run, hitting APVs 0/1 on p-sides,
1/2 on n-sides
EUDAT telescope running with difference
  
Entry is currently edited by Thomas Bergauer on 193.170.243.91    120   Sun Nov 23 17:51:44 2014 Benedikt WürknerBelle SVDHardwareRun04610000020:0620:36UnknownHardware Run +-60V Bias
Room Temperature
Pedestal 018 (again marked all the
  
  16   Mon Nov 17 22:22:56 2014 Hao Yin PedestalRun_00100110000Mon Nov 17 22:22:41 CET 2014 UnknownAt room temperature.
 
  
  24   Tue Nov 18 09:48:53 2014 Hao YinBelle SVDPedestalRun_004 10000Tue Nov 18 09:48:30 CET 2014 UnknownAt room temperature.
Old delay settings and FIRRun_002
 
  
  26   Tue Nov 18 10:12:25 2014 Hao YinBelle SVD6let PedestalRun_005 10000Tue Nov 18 10:11:45 CET 2014 UnknownAt room temperature
Latest delay, FIRRun002. 
Check for bad strips.
  
  84   Fri Nov 21 22:08:32 2014 Hao Yin PedestalRun01310000  Unknowncorrect mapping 
cooled -25 °C
L3n deactivated
  
  110   Sun Nov 23 10:32:41 2014 Hao YinBelle SVDPedestalRun01610000  UnknownPedestal Run 
room temperature (30C)
Bias scans planned
  
  116   Sun Nov 23 15:09:53 2014 Markus FriedlBelle SVDPedestalRun00110000  GoodInitial pedestal run with SVD3 setup and
WedgeOld, FW993, BW993 (reading out 4 chips
on every p-side)
  
  85   Fri Nov 21 23:33:54 2014 Axel KönigAIDAhardware run (PC crashed)AIDA_run008---  Unknown22:00 SVD3 PC crashed!!! data will be collected.    
  1   Fri Nov 14 19:01:27 2014 Thomas BergauercommonAdministrative Procedures for Departure    UnknownWednesday:
* Transport request starten (I do
not need any transport service) von 887 nach
 Merchandise-2014.pdfankunftsbestaetigung.pdf 
  2   Fri Nov 14 19:22:40 2014 Martin Kurzcommonip addresses, portforwarding, wlan    UnknownWLAN Router:

SSID:
Hephy

password: 20supersecret14
  
  3   Fri Nov 14 19:47:25 2014 Thomas Bergauer Telefonnummern    Unknown* CCC (zentraler Beschleuniger-Kontrollraum):
77500
* H6A Controlroom: 76755
  
  4   Fri Nov 14 19:49:04 2014 Florian BuchsteinercommonBelle Setup    Unknown   SPS_2014_Testbeam_-_Belle_Setup-Model.pdf 
  5   Fri Nov 14 19:52:12 2014 Thomas Bergauer important web pages    UnknownSPS Accelerator status:  http://op-webtools.web.cern.ch/op-webtools/vistar/vistars.php?usr=SPS1
general Information about the Beam
  
  6   Sat Nov 15 11:36:41 2014 Thomas BergauercommonChecklist for North Area access    Unknown 
  
  7   Sat Nov 15 11:37:19 2014 Thomas BergauerAIDAList of EUDET Telescope PCs in H6b    Unknown https://twiki.cern.ch/twiki/bin/view/CLIC/ClicPixelDataTakingCERNPS2014   
  8   Sat Nov 15 12:41:50 2014 Benedikt WürknerBelle SVDDiscoveries during preliminary sensor tests    UnknownL5_p_side APV #3 faulty signal
L4_n_side APV #2 and #3 faulty signal
 weird_signal.pngfaulty-signal-l4_n.pngfaulty-signal_l4_n_2.png 
  9   Sun Nov 16 14:22:51 2014 Thomas BergauerAIDAPC Configuration EUDET Telescope in H6b    UnknownPC (gehört AIDA) in H6b control room:  ssh
telescope@
  
ELOG V3.1.5-fc6679b