Home CMS Production Clean room MedAustron HEPHY testbeams old
testbeam-RD50-DESY-Jul2023 testbeam-RD50-CERN-Oct2022 testbeam-DESY-Oct2017 testbeam-DESY-April2017 testbeam-SPS2015 testbeam-SPS2014 testbeam-DESY14 testbeam-SPS12 testbeam-SPS11 testbeam-SPS10 testbeam-SPS09 testbeam-SPS08 LP-TPC
  Belle/Infineon/AIDA testbeam at SPS in Nov 2014, Page 1 of 6  Not logged in ELOG logo
ID Date Author Project Subject Run Number Events StartTime EndTime Dataup
  47   Wed Nov 19 22:59:24 2014 Hao YinBelle SVDCalibrationRun_004    Crap

cooled (see last calibration run)

Latest noise, FIRfilter settings. 

 

Failed due to VME read timeout.

  58   Thu Nov 20 11:13:44 2014 Hao Yin HardwareRun_008008   Crap

cooled see attachment in FIRRun_003

PedestalRun_009

CalibrationRun_005

zerosuppressed

  59   Thu Nov 20 11:14:19 2014 Benedikt Würkner HardwareRun_009009   Crap

 cooling see attachment of FIRRun003

Ped 009

Cal 005

Multi 6 raw mode

L5_n_side out of order

 

FIFO_FULL_ERROR starting at ~2000 events

  60   Thu Nov 20 15:32:33 2014 Hao Yin HardwareRun010   Crap

same as hardware run 009

FIFO FULL ERROR starting at ~event 5000

  63   Thu Nov 20 16:13:18 2014 Hao YinBelle SVDHardwareRun011   Crap

cooled see appendix (FirRun003)

PedestalRun_009

multi 6 Raw Mode

FIFO size increased

 

 

FIFO FULL at  event ~27000

  74   Fri Nov 21 15:10:19 2014 Benedikt Würkner HardwareRun15-22 (exept 19) none  Crap
  105   Sun Nov 23 01:05:43 2014 Hao YinBelle SVDHardwareRun039200002014-11-22 15:18:40 Crap

Cooled down to -20

Bias voltage set to +-80V

Pedestal_013 (cooled)

Noisefile: HardwareRun_036.noi

 

  14   Mon Nov 17 22:21:41 2014 Hao Yin FIR run001 Mon Nov 17 22:08:29 CET 2014 Good

Excellent, brilliant run. 

  66   Thu Nov 20 22:11:06 2014 Hao YinBelle SVDHardwareRun012   Good

cooled see appendix (FirRun003)

PedestalRun_009

multi 6 Raw Mode

FIFO size increased

  83   Fri Nov 21 19:42:36 2014 Hao Yin HardwareRun_033    Good

L6 are swapped, needs to be corrected later in the offline analysis.

cooled at -25

latest ADC delay and FIRRun

PedestalRun_012

CalibrationRun_006

100k trigger dead time

 

Need to change L6n apv definition to:

mod = 9,0,1,1,1,m,29,0,0,0,0,0,0,L6_n_side

apv = 9,1,34,3,30,x,0,0,5,1,7,0,0,x
apv = 9,0,36,3,50,x,0,0,5,1,6,0,0,x
apv = 9,3,38,3,30,x,0,0,5,1,9,0,0,x
apv = 9,2,40,3,30,x,0,0,5,1,8,0,0,x

to  get the right mapping of the sensor.

Attachment 1: Temp_21-11-14.PNG
Temp_21-11-14.PNG
  116   Sun Nov 23 15:09:53 2014 Markus FriedlBelle SVDPedestalRun00110000  Good

Initial pedestal run with SVD3 setup and WedgeOld, FW993, BW993 (reading out 4 chips on every p-side)

  117   Sun Nov 23 15:10:42 2014 Markus FriedlBelle SVDCalibrationRun00183400  Good

Initial calibration run with SVD3 setup and WedgeOld, FW993, BW993 (reading out 4 chips on every p-side)

  118   Sun Nov 23 15:13:37 2014 Markus FriedlBelle SVDHardwareRun00310060023.11.2014 14:07:2323.11.2014 16:51:27Good

Hardware run, hitting APVs 0/1 on p-sides, 1/2 on n-sides

EUDAT telescope running with difference of 2 events

  119   Sun Nov 23 16:55:37 2014 Markus FriedlBelle SVDHardwareRun0046060023.11.2014 16:51:4923.11.2014 18:23:54Good

Hardware run, hitting APVs 1/2 on p-sides, 1/2 on n-sides

EUDAT telescope running with difference of 2 events

  121   Sun Nov 23 18:26:54 2014 Markus FriedlBelle SVDHardwareRun0056060023.11.2014 18:24:3423.11.2014 Good

Hardware run, hitting APVs 2/3 on p-sides, 1/2 on n-sides

EUDAT telescope running with difference of 2 events

  1   Fri Nov 14 19:01:27 2014 Thomas BergauercommonAdministrative Procedures for Departure    Unknown

Wednesday:

* Transport request starten (I do not need any transport service) von 887 nach Wien. Das triggert automatisch die Radio Protection Leute. Der EDH Request hängt dann bei irgend einem Franzosen. Den bitte anrufen und für Montag mittags einen Termin ausmachen. Es muss alles geschnüffelt werden, was in der Zone war (also nicht im Counting room)

Merchandise-Bestätigung für die Anreise ist im attachment!

 

Anreise: https://edh.cern.ch/Document/SupplyChain/SHIP/5855845

Abreise: https://edh.cern.ch/Document/SupplyChain/SHIP/5863835

Attachment 1: Merchandise-2014.pdf
Attachment 2: ankunftsbestaetigung.pdf
  2   Fri Nov 14 19:22:40 2014 Martin Kurzcommonip addresses, portforwarding, wlan    Unknown

WLAN Router:

SSID: Hephy

password: 20supersecret14

DHCP Range: 192.168.0.200 to 239

Netmask: /24

DNS Server: 192.168.0.254

Gateway: 192.168.0.254

external IP: 128.141.61.16 (für diverse Port Forwardings)

 

Manuell vergebene IP Adressen bitte unbedingt Martin Kurz mitteilen oder/und in der folgenden Tabelle eintragen! 

IP/MAC Zuweisung:

IP Machine/Name intern Port Forwarding (aussen)
192.168.0.10 SVD Kenwood  VNC(5900)  VNC(9000)
192.168.0.11 AIDA DAQ  VNC(5900)  VNC(9001)
192.168.0.12 TUX DAQ  VNC(5900), VNC(5901), SSH(22)  VNC(9009), VNC(9002), SSH(9003),
192.168.0.13 Belle XY Tisch    
192.168.0.14 TUXOA  SSH(22)  SSH(9004)
192.168.0.15 JTAG Server    
192.168.0.148 alixcool    
192.168.0.16 slowcontrol  VNC(5900)  VNC(9005)
192.168.0.144 CAEN Power supply    
192.168.0.17 zenpixelwiki  SSH(22), VNC(5900)  SSH(9006), VNC(9008)
192.168.0.18 TLU (pcx25042, XY)  VNC(5900)  VNC(9007)
192.168.0.240 NI GPIB - ENET / 1000    
192.168.0.150 Printserver  VNC(5900)  VNC(9010)
       
       

 

Admin Zugang Wlan Router:

IP: 192.168.0.254

Username: admin

password: Hephy2014

 

  3   Fri Nov 14 19:47:25 2014 Thomas Bergauer Telefonnummern    Unknown

* CCC (zentraler Beschleuniger-Kontrollraum): 77500

* H6A Controlroom: 76755

* HEPHY-Handy: 16-2471 or +41 76 487 2471 from outside of CERN

* Office in Meyrin: 12-R11: 74592

 

Hostel-Zimmern:

* Bergi: 79326

* Benni: 60232

* Hao: 70408

 

Andere Wichtige Leute:

* Beam-Dame: Edda Gschwendner 16-5080

* NA Hallen Verantwortlicher: Michael Jeckel

Lookup Telefonnummern: http://phonebook.cern.ch

 
  4   Fri Nov 14 19:49:04 2014 Florian BuchsteinercommonBelle Setup    Unknown
Attachment 1: SPS_2014_Testbeam_-_Belle_Setup-Model.pdf
  5   Fri Nov 14 19:52:12 2014 Thomas Bergauer important web pages    Unknown

SPS Accelerator status:  http://op-webtools.web.cern.ch/op-webtools/vistar/vistars.php?usr=SPS1

general Information about the Beam line(s): http://sba.web.cern.ch/sba/

ELOG V3.1.5-fc6679b