Home CMS Production Clean room MedAustron HEPHY testbeams old
testbeam-RD50-DESY-Jul2023 testbeam-RD50-CERN-Oct2022 testbeam-DESY-Oct2017 testbeam-DESY-April2017 testbeam-SPS2015 testbeam-SPS2014 testbeam-DESY14 testbeam-SPS12 testbeam-SPS11 testbeam-SPS10 testbeam-SPS09 testbeam-SPS08 LP-TPC
  Belle/Infineon/AIDA testbeam at SPS in Nov 2014, Page 6 of 6  Not logged in ELOG logo
ID Date Authorup Project Subject Run Number Events StartTime EndTime Data Text Attachments
  92   Sat Nov 22 11:16:26 2014 Markus FriedlBelle SVDcooling    UnknownCooling box plant hung up (I2C error on
Alix, persistent after reboot)
Power-cycled cooling plant, now working
  
  109   Sun Nov 23 09:49:00 2014 Markus FriedlBelle SVDcooling    UnknownSaturday evening, the cooling became unstable
which indicates the end of the CO2 supply,
possibly having a mixture of liquid and gas
 temp_last_night.png 
  115   Sun Nov 23 15:07:54 2014 Markus FriedlBelle SVDcommon    UnknownGeometry setup of FW/BW:
(all dimensions are in mm and refer
to the sensor planes)
 fwbw_setup.png 
  116   Sun Nov 23 15:09:53 2014 Markus FriedlBelle SVDPedestalRun00110000  GoodInitial pedestal run with SVD3 setup and
WedgeOld, FW993, BW993 (reading out 4 chips
on every p-side)
  
  117   Sun Nov 23 15:10:42 2014 Markus FriedlBelle SVDCalibrationRun00183400  GoodInitial calibration run with SVD3 setup
and WedgeOld, FW993, BW993 (reading out 4
chips on every p-side)
  
  118   Sun Nov 23 15:13:37 2014 Markus FriedlBelle SVDHardwareRun00310060023.11.2014 14:07:2323.11.2014 16:51:27GoodHardware run, hitting APVs 0/1 on p-sides,
1/2 on n-sides
EUDAT telescope running with difference
  
  119   Sun Nov 23 16:55:37 2014 Markus FriedlBelle SVDHardwareRun0046060023.11.2014 16:51:4923.11.2014 18:23:54GoodHardware run, hitting APVs 1/2 on p-sides,
1/2 on n-sides
EUDAT telescope running with difference
  
  121   Sun Nov 23 18:26:54 2014 Markus FriedlBelle SVDHardwareRun0056060023.11.2014 18:24:3423.11.2014 GoodHardware run, hitting APVs 2/3 on p-sides,
1/2 on n-sides
EUDAT telescope running with difference
  
  2   Fri Nov 14 19:22:40 2014 Martin Kurzcommonip addresses, portforwarding, wlan    UnknownWLAN Router:

SSID:
Hephy

password: 20supersecret14
  
  12   Mon Nov 17 22:03:02 2014 Martin KurzcommonDrucker    UnknownDrucken über den Printserver
(192.168.0.150):
 
  
  1   Fri Nov 14 19:01:27 2014 Thomas BergauercommonAdministrative Procedures for Departure    UnknownWednesday:
* Transport request starten (I do
not need any transport service) von 887 nach
 Merchandise-2014.pdfankunftsbestaetigung.pdf 
  3   Fri Nov 14 19:47:25 2014 Thomas Bergauer Telefonnummern    Unknown* CCC (zentraler Beschleuniger-Kontrollraum):
77500
* H6A Controlroom: 76755
  
  5   Fri Nov 14 19:52:12 2014 Thomas Bergauer important web pages    UnknownSPS Accelerator status:  http://op-webtools.web.cern.ch/op-webtools/vistar/vistars.php?usr=SPS1
general Information about the Beam
  
  6   Sat Nov 15 11:36:41 2014 Thomas BergauercommonChecklist for North Area access    Unknown 
  
  7   Sat Nov 15 11:37:19 2014 Thomas BergauerAIDAList of EUDET Telescope PCs in H6b    Unknown https://twiki.cern.ch/twiki/bin/view/CLIC/ClicPixelDataTakingCERNPS2014   
  9   Sun Nov 16 14:22:51 2014 Thomas BergauerAIDAPC Configuration EUDET Telescope in H6b    UnknownPC (gehört AIDA) in H6b control room:  ssh
telescope@
  
  11   Mon Nov 17 19:23:57 2014 Thomas BergauerInfineonPI XY table initial position    Unknowninitial position of Infineon Stack (PI
Micromove):
(guess center position by eye)
  
  29   Tue Nov 18 13:13:53 2014 Thomas BergauerInfineonhardware runinfineon_run001225508  UnknownInfineon new stack - batch 4
single hit
 
HV=300V,
total I = 4.2475 µA
 
strips
  
ELOG V3.1.5-fc6679b