Home CMS Production Clean room MedAustron HEPHY testbeams old
testbeam-RD50-DESY-Jul2023 testbeam-RD50-CERN-Oct2022 testbeam-DESY-Oct2017 testbeam-DESY-April2017 testbeam-SPS2015 testbeam-SPS2014 testbeam-DESY14 testbeam-SPS12 testbeam-SPS11 testbeam-SPS10 testbeam-SPS09 testbeam-SPS08 LP-TPC
  HEPHY logbook for testbeam at SPS October 2012 and Irradiation Mol, Page 4 of 4  Not logged in ELOG logo
New entries since:Thu Jan 1 01:00:00 1970
Entry  Tue Oct 23 15:55:58 2012, Markus Friedl, MicronOrigami_gross, cal, cal026, 83800, 23.10.2012 14:56:47, 23.10.2012 15:42:17 , Good 
Belle Stack 4: 2 DSSD -z, Origami #3, #1, wedge new #2
HV = +-10V, Ibias=36uA
Position: APVs #2, 7, 11, 15 | # 17/18, 21, 25, 29
Entry  Tue Oct 23 16:06:09 2012, Markus Friedl, MicronOrigami_gross, run, run026, 102124, 23.10.2012 16:04:47, 23.10.2012 23:04:56, Unknown 
Belle Stack 4: 2 DSSD -z, Origami #3, #1, wedge new #2
HV = +-10V, Ibias=36uA
Position: APVs #2, 7, 11, 15 | # 17/18, 21, 25, 29
Entry  Tue Oct 23 23:12:03 2012, Thomas Bergauer, MicronOrigami_gross, run, run027, 220847, 23.10.2012 23:10:14, 24.10.2012 08:19:51, Unknown 
 Belle Stack 4: 2 DSSD -z, Origami #3, #1, wedge new #2
HV = +-5V, Ibias=23.5uA
Position: APVs #2, 7, 11, 15 | # 17/18, 21, 25, 29
= p: 2DSSD #2, Origami3 #3, Origami1 #3, wedgenew
#3
= n: 2DSSD #1/2, Origami3 #1, Origami1 #1, wedgenew #1
 
SPS Status during whole run: Still problems with North
Entry  Wed Oct 24 08:25:04 2012, Thomas Bergauer, MicronOrigami_gross, cal, cal027, 83800, 24.10.2012 08:22:25, 24.10.2012 09:10:19, Unknown 
 Belle Stack 4: 2 DSSD -z, Origami #3, #1, wedge new #2
HV = +-5V, Ibias=23.5uA
Position: APVs #2, 7, 11, 15 | # 17/18, 21, 25, 29
= p: 2DSSD #2, Origami3 #3, Origami1 #3, wedgenew
#3
= n: 2DSSD #1/2, Origami3 #1, Origami1 #1, wedgenew #1
Entry  Wed Oct 24 09:51:41 2012, Thomas Bergauer, MicronOrigami_gross, cal, cal028, 83800, 24.10.2012 09:50:53, 24.10.2012 10:39:43, Unknown 
 Belle Stack 4: 2 DSSD -z, Origami #3, #1, wedge new #2
HV = +-2.5V, Ibias=14.5uA
Position: APVs #2, 7, 11, 15 | # 17/18, 21, 25, 29
= p: 2DSSD #2, Origami3 #3, Origami1 #3,
wedgenew #3
= n: 2DSSD #1/2, Origami3 #1, Origami1 #1, wedgenew #1
Entry  Wed Oct 24 17:24:40 2012, Thomas Bergauer, MicronOrigami_gross, run ohne Strom ;-(, run028, , , , Unknown 
 
Belle Stack 4: 2 DSSD -z, Origami #3, #1, wedge new #2
HV = +-2.5V, Ibias=14.5uA
Entry  Sat Oct 27 19:36:24 2012, Markus Friedl, MicronOrigami_gross, cal, cal031, 83800, 27.10.2012 19:59:50, 27.10.2012 20:44:38, Good 
Belle stack 2 after irradiation
HV = +50V -50V
I = 112 µA
Entry  Sat Oct 27 21:49:08 2012, Markus Friedl, MicronOrigami_gross, run, run031, 150k, 27.10.2012 21:42:46, 28.10.2012 02:35:55 (+1h due to winter time), Good 
Belle stack 2 after gamma irrdiation
HV = +50V -50 V
I = 102 uA
Entry  Sun Oct 28 02:51:49 2012, Markus Friedl, MicronOrigami_gross, run, run032, 150k, 28.10.2012 02:47:24, 28.10.2012 08:31:19 , Good 
Belle stack 2 after gamma irradiation
HV = +50V -50V
I = 101 uA
Entry  Sun Oct 28 08:37:53 2012, Christian Irmler, MicronOrigami_gross, run, run033, 66937, 28.10.2012 08:33:42, 28.10.2012 14:10:43 , Unknown temp_run33.JPGtemp_run33_2.JPG
Belle stack 2 after gamma irradiation
HV = +50V -50V
I = 101 uA
Entry  Tue Oct 30 17:24:01 2012, Markus Friedl, MicronOrigami_gross, cal, cal040, 83800, 30.10.2012 17:20:28 , 30.10.2012 17:54:09, Unknown 
Cooling for 2DSSD established after some struggle.
2DSSD fully read out with cooling
HV= +40 V -40 V    I = 2 uA
Entry  Tue Oct 30 18:35:51 2012, Christian Irmler, MicronOrigami_gross, run, run040, 100k, 30.10.2012 18:23:21, 30.10.2012 21:55:53 , Unknown temperatures_run040.jpg
Cooling for 2DSSD established after some struggle.
2DSSD fully read out with cooling
HV= +40 V -40 V    I = 2.1 uA
Entry  Tue Oct 30 22:15:41 2012, Markus Friedl, MicronOrigami_gross, run, run041, 100k, 30.10.2012 22:09:13, , Unknown temperatures_run041.jpg
Cooling for 2DSSD established after some struggle.
2DSSD fully read out with cooling
HV= +40 V -40 V    I =  1.84 uA
Entry  Fri Oct 12 15:04:55 2012, Marko Dragicevic, common, Network configuration, , , , , Unknown 
Router:
IP 137.138.113.230
Hostname ROUTERHEPHY.cern.ch
Entry  Fri Oct 12 23:51:35 2012, Markus Friedl, common, Zimmernummer & Telefonnummern, , , , , Unknown 
2nd week:
Markus: 38 - 420   (phone: 70 420)
Thomas: 38 - 431   (phone: 70 431)
Entry  Fri Oct 12 23:52:57 2012, Markus Friedl, common, Sozialisierung, , , , , Unknown 
Prost, Bergi!
(Das ist nur ein Test, ob du wirklich all die Elog-Emails liest.)
Entry  Mon Oct 15 19:21:56 2012, Marko Dragicevic, common, Beam settings and profile, , , , , Unknown NetBeans_IDE_3.5_15-Oct-12_19-28-32.png
Beam setting file:
H6A.804: FM HAD (H8=+180, H6=120@0mrad) PARALL IN H6A; RD42
Kommentar (Marko):
Entry  Tue Oct 16 23:03:09 2012, Markus Friedl, common, Sozialisierung, , , , , Unknown IMAG2041.jpgfondue.jpg
So steuert man einen Testbeam!
Entry  Thu Oct 18 09:14:07 2012, Manfred Valentan, common, Fahrt nach Mol, , , , , Unknown 
 Liebe Kollegen,
wir brechen. auf. Wünscht uns Glück!
Entry  Wed Oct 31 15:54:59 2012, Christian Irmler, common, Ethernetkabel zu H6A, , , , , Unknown 2012-10-31_15.47.42.jpg2012-10-31_12.28.32.jpg
Ethernetkabel HNA447 -> H6A:
Das obere Ende im Counting Hut liegt im Zwischenboden unterhalb der orangenen Steckdose beim Eingang mit dem elektronischen Zahlenschloß.
Das untere Ende in der Zone hängt aufgerollt an einem Pfeiler der Kabeltasse, unweit der Stelle an der das Kabel von oben hinunter gelassen
ELOG V3.1.5-fc6679b