Home CMS Production Clean room MedAustron HEPHY testbeams old
testbeam-RD50-DESY-Jul2023 testbeam-RD50-CERN-Oct2022 testbeam-DESY-Oct2017 testbeam-DESY-April2017 testbeam-SPS2015 testbeam-SPS2014 testbeam-DESY14 testbeam-SPS12 testbeam-SPS11 testbeam-SPS10 testbeam-SPS09 testbeam-SPS08 LP-TPC
  HEPHY logbook for testbeam at SPS October 2012 and Irradiation Mol, Page 4 of 4  Not logged in ELOG logo
New entries since:Thu Jan 1 01:00:00 1970
ID Date Author Project Subject Run Numberdown Events StartTime EndTime Data
  29   Tue Oct 16 22:19:21 2012 Christian IrmlerMicronOrigami_grosscalcal0078380016.10.2012 20:25:17 16.10.2012 21:12:01 Unknown

Origami Stack 2: Origami #4, #3, Wedge new1, old
HV = +-50V, Ibias=12.3µA
Position: verticallbtween APV 1&2 of 6,  left side of sensor,
wide side of wedge sensors

calibration for run013

Temperatures @ 21:00:

T11: -32 degC
T12: -33 degC
T13: -16 degC (obviously wrong value)
T14: -35 degC
T15: -18 degC
T16: -17 degC
T17: -15 degC
T18: -15 degC

  26   Tue Oct 16 11:07:17 2012 Christian IrmlerMicronOrigami_grosscalcal0068380016.10.2012 10:30:3416.10.2012 11:00:51Unknown

Origami Stack 2a: Origami #4, Wedge new1
reading out all 6 APV of p-side
HV = +-40V, Ibias=5.12µA
 

no beam

no cooling

  23   Mon Oct 15 22:13:28 2012 Marko DragicevicMicronOrigami_grosscal ATTENTION: wrong bias voltage cal0058380015.10.2012 22:16:2615.10.2012 23:07:37 Unknown

ATTENTION: Bias voltage was +-100 V instead of +- 50 V

Origami Stack 2: Origami #4, #3, Wedge new1, old
HV = +-100V

Ibias=12.3µA
 

beam position:
vertical: between APV 1&2 (of 6)
horizontal: centered on APV#1 ->  right side of sensor

Position of xy table:
x = 23, y = -25


Temperatures:

Origami #4: In=-33 degC / Out=-34 degC
Origami #3: Out=-35 degC (temperatur sensor of inlet is not working)
Wedge new 1: Out =  -17 degC, cooling block = -14 degC
Wedge old: Out = -16 degC, cooling block = -14 degC

 

  18   Sun Oct 14 23:01:11 2012 Marko DragicevicInfineoncalcal0048380014.10.2012 21:44:0014.10.2012 21:03:00Unknown

Infineon Stack Version 1 (with height information, BabyStrips horizontal Strixel vertical)

HV = 300V   I=3.1 uA

  15   Sun Oct 14 08:25:10 2012 Manfred ValentanMicronBabycalcal0038380014.10.2012 08:21:4614.10.2012 08:51:58Unknown

Micron baby intermediate stack

HV = -100 V
I = 6.9 uA

  12   Sat Oct 13 23:04:22 2012 Markus FriedlMicronOrigami_grosscalcal0028380013.10.2012 23:03:1813.10.2012 22:57:48Unknown

Belle stack 3 (2-DSSD, Micron new, Micron old)
HV = +-50V   I=10.5A
beam on CE sensor

CO2 gas cooling:
Temp. @ Origami ~ -18°C (inlet) / -8°C (outlet)
Temp. @ Wedge new1: ~ 0°C
Temp. @ Wedge old: ~ -5°C

  3   Fri Oct 12 22:00:52 2012 Christian IrmlerMicronBabycalcal0018380012.10.2012 21:16:3312.10.2012 21:59:02Good

12.10.2012  21:16:33  event=0  Disk space: Needed=0.00 GB, Available=206.59 GB, Total=931.51 GB
12.10.2012  21:16:33  event=0  DAQ start (mode: Calibration Scan)
12.10.2012  21:16:33  event=0  Init NECO... done
12.10.2012  21:16:34  event=0  Init APVs... done
12.10.2012  21:16:37  event=0  Send 10 dummy triggers to initialize APV pedestals... done
12.10.2012  21:16:37  event=0  Init FADCs... done
12.10.2012  21:16:37  event=0  Taking 600 pedestal events
12.10.2012  21:16:45  event=599  Pedestal and Noise evaluation done - switching to Calibration Scan
12.10.2012  21:17:39  event=2459  rate=8events/s temp/curr=32.7/097.5 32.7/-08.2 32.7/-08.3 32.8/-08.3 31.2/001.6 31.2/001.7 31.2/001.6 31.2/001.4
12.10.2012  21:18:43  event=4023  rate=8events/s temp/curr=32.6/097.3 32.7/-08.2 32.7/-08.5 32.7/-08.3 31.1/001.6 31.1/001.6 31.1/001.6 31.1/001.6
12.10.2012  21:19:49  event=5600  rate=50events/s temp/curr=32.7/097.5 32.6/-08.3 32.6/-08.3 32.6/-08.3 31.1/001.6 31.1/001.6 31.1/001.6 31.1/001.6
12.10.2012  21:20:53  event=7990  rate=7events/s temp/curr=32.6/097.5 32.6/-08.2 32.6/-08.5 32.6/-08.3 31.1/001.6 31.0/001.6 31.1/001.6 31.0/001.6
12.10.2012  21:21:59  event=8694  rate=6events/s temp/curr=32.5/097.3 32.6/-08.2 32.6/-08.5 32.6/-08.3 31.1/001.6 31.0/001.6 31.0/001.6 31.0/001.6
12.10.2012  21:23:02  event=11116  rate=66events/s temp/curr=32.5/097.3 32.6/-08.3 32.5/-08.3 32.5/-08.3 31.0/001.4 31.0/001.7 31.0/001.6 31.0/001.6
12.10.2012  21:24:06  event=13095  rate=7events/s temp/curr=32.5/097.3 32.5/-08.3 32.5/-08.3 32.5/-08.3 31.0/001.6 30.9/001.6 31.0/001.6 31.0/001.6
12.10.2012  21:25:08  event=15105  rate=5events/s temp/curr=32.4/097.5 32.5/-08.3 32.5/-08.3 32.5/-08.3 31.0/001.6 30.9/001.6 30.9/001.6 31.0/001.6
12.10.2012  21:26:13  event=16444  rate=7events/s temp/curr=32.5/097.3 32.4/-08.3 32.4/-08.3 32.5/-08.3 30.9/001.6 30.9/001.6 31.0/001.6 31.0/001.6
12.10.2012  21:27:22  event=18050  rate=6events/s temp/curr=32.4/097.5 32.4/-08.3 32.4/-08.5 32.4/-08.5 30.9/001.6 30.9/001.6 30.9/001.6 30.9/001.6
12.10.2012  21:28:25  event=19878  rate=8events/s temp/curr=32.4/097.3 32.4/-08.3 32.4/-08.3 32.4/-08.3 30.7/001.6 30.9/001.6 30.9/001.6 30.7/001.6
12.10.2012  21:29:26  event=21875  rate=7events/s temp/curr=32.3/097.3 32.3/-08.2 32.4/-08.3 32.3/-08.3 30.7/001.4 30.7/001.6 30.7/001.6 30.7/001.6
12.10.2012  21:30:28  event=24200  rate=50events/s temp/curr=32.3/097.3 32.3/-08.2 32.3/-08.3 32.3/-08.5 30.7/001.6 30.7/001.7 30.7/001.6 30.7/001.6
12.10.2012  21:31:33  event=26300  rate=50events/s temp/curr=32.4/097.5 32.3/-08.2 32.4/-08.3 32.3/-08.3 30.7/001.6 30.7/001.7 30.7/001.6 30.7/001.6
12.10.2012  21:32:41  event=28400  rate=9events/s temp/curr=32.3/097.3 32.3/-08.3 32.2/-08.3 32.3/-08.3 30.7/001.6 30.7/001.6 30.7/001.6 30.6/001.6
12.10.2012  21:33:43  event=30300  rate=50events/s temp/curr=32.3/097.5 32.3/-08.3 32.3/-08.3 32.3/-08.3 30.7/001.6 30.7/001.6 30.7/001.6 30.7/001.6
12.10.2012  21:34:46  event=32242  rate=42events/s temp/curr=32.2/097.5 32.3/-08.3 32.2/-08.5 32.3/-08.3 30.7/001.6 30.7/001.7 30.7/001.6 30.6/001.4
12.10.2012  21:35:50  event=34167  rate=67events/s temp/curr=32.2/097.3 32.3/-08.3 32.2/-08.3 32.2/-08.3 30.7/001.6 30.7/001.6 30.7/001.6 30.7/001.4
12.10.2012  21:36:54  event=35928  rate=7events/s temp/curr=32.2/097.3 32.2/-08.3 32.0/-08.3 32.2/-08.3 30.6/001.4 30.7/001.6 30.7/001.6 30.6/001.4
12.10.2012  21:37:54  event=38470  rate=8events/s temp/curr=32.0/097.5 32.2/-08.3 32.2/-08.3 32.2/-08.3 30.6/001.6 30.6/001.6 30.6/001.6 30.6/001.6
12.10.2012  21:39:00  event=40751  rate=1events/s temp/curr=32.2/097.5 32.2/-08.2 32.2/-08.3 32.2/-08.3 30.6/001.6 30.6/001.6 30.6/001.6 30.6/001.6
12.10.2012  21:40:04  event=42861  rate=7events/s temp/curr=32.2/097.5 32.2/-08.3 32.2/-08.3 32.2/-08.3 30.6/001.6 30.6/001.6 30.6/001.6 30.6/001.6
12.10.2012  21:41:05  event=44950  rate=50events/s temp/curr=32.2/097.5 32.2/-08.2 32.0/-08.3 32.2/-08.3 30.5/001.6 30.6/001.6 30.6/001.6 30.6/001.6
12.10.2012  21:42:10  event=47954  rate=4events/s temp/curr=32.2/097.5 32.2/-08.2 32.2/-08.5 32.2/-08.3 30.5/001.6 30.5/001.6 30.5/001.6 30.5/001.6
12.10.2012  21:43:18  event=49909  rate=7events/s temp/curr=32.2/097.3 32.0/-08.3 32.2/-08.3 32.2/-08.3 30.5/001.6 30.5/001.6 30.6/001.6 30.5/001.6
12.10.2012  21:44:17  event=52950  rate=68events/s temp/curr=32.0/097.3 32.2/-08.3 32.0/-08.3 32.0/-08.3 30.5/001.6 30.5/001.6 30.5/001.6 30.5/001.6
12.10.2012  21:45:17  event=55800  rate=50events/s temp/curr=32.2/097.3 32.2/-08.2 32.2/-08.3 32.2/-08.3 30.4/001.6 30.5/001.6 30.5/001.6 30.5/001.6
12.10.2012  21:46:18  event=59281  rate=31events/s temp/curr=32.2/097.5 32.2/-08.2 32.2/-08.5 32.0/-08.3 30.5/001.6 30.5/001.6 30.5/001.6 30.5/001.6
12.10.2012  21:47:19  event=61723  rate=73events/s temp/curr=32.0/097.5 32.0/-08.2 32.2/-08.5 32.0/-08.3 30.4/001.6 30.5/001.6 30.5/001.6 30.4/001.6
12.10.2012  21:48:20  event=64750  rate=60events/s temp/curr=32.0/097.3 32.2/-08.2 32.0/-08.5 32.0/-08.5 30.5/001.6 30.5/001.6 30.5/001.6 30.4/001.6
12.10.2012  21:49:21  event=66450  rate=50events/s temp/curr=32.0/097.3 32.2/-08.3 32.0/-08.3 32.0/-08.3 30.5/001.6 30.5/001.7 30.4/001.6 30.5/001.6
12.10.2012  21:50:23  event=69850  rate=2events/s temp/curr=32.0/097.5 32.0/-08.3 32.0/-08.5 32.0/-08.3 30.5/001.6 30.4/001.6 30.5/001.6 30.5/001.6
12.10.2012  21:51:23  event=73142  rate=7events/s temp/curr=32.0/097.3 32.2/-08.3 32.0/-08.3 32.0/-08.3 30.4/001.6 30.5/001.6 30.4/001.6 30.4/001.4
12.10.2012  21:52:33  event=74250  rate=5events/s temp/curr=32.0/097.3 31.9/-08.2 32.0/-08.3 32.0/-08.3 30.4/001.6 30.4/001.6 30.4/001.6 30.4/001.6
12.10.2012  21:53:43  event=75006  rate=30events/s temp/curr=32.0/097.3 32.0/-08.3 32.0/-08.3 32.0/-08.3 30.4/001.6 30.4/001.6 30.4/001.6 30.4/001.4
12.10.2012  21:54:45  event=76973  rate=6events/s temp/curr=32.0/097.3 32.0/-08.3 32.0/-08.5 32.0/-08.3 30.4/001.6 30.4/001.6 30.3/001.6 30.4/001.6
12.10.2012  21:55:49  event=78788  rate=6events/s temp/curr=32.0/097.5 31.9/-08.2 31.9/-08.3 32.0/-08.3 30.4/001.6 30.4/001.6 30.3/001.6 30.4/001.6
12.10.2012  21:56:57  event=80261  rate=7events/s temp/curr=32.0/097.5 31.9/-08.2 31.9/-08.3 32.0/-08.3 30.4/001.4 30.4/001.6 30.4/001.6 30.4/001.6
12.10.2012  21:57:58  event=82550  rate=64events/s temp/curr=31.9/097.3 32.0/-08.3 31.9/-08.3 31.9/-08.3 30.4/001.6 30.4/001.6 30.4/001.6 30.3/001.6
12.10.2012  21:58:54  event=83800  Processing calibration data... done
12.10.2012  21:58:55  event=83800  Writing calibration file D:\cern12\micronbaby\data\cal001.cal...done
12.10.2012  21:59:02  event=83800  DAQ stop (mode: Calibration Scan)
12.10.2012  21:59:02  event=83800  Writing properties file D:\cern12\micronbaby\data\cal001.pro...done
 

  1   Fri Oct 12 15:04:55 2012 Marko DragiceviccommonNetwork configuration    Unknown

Router:
IP 137.138.113.230
Hostname ROUTERHEPHY.cern.ch
connected on outlet 0887-1:4602/02

Devices
DAQPC: 192.168.0.36
Slowcontrol (REINRAUMLAPTOP): 192.168.0.37
AnneKathrinPC (AOH): 192.168.0.40
GPIB->Ethernet: 192.168.0.240
Coolingbox: 192.168.0.148
XY Table: 192.168.0.13
VAIO (CONF1): 192.168.0.42
BeamControl: 137.138.113.210 CWO-HNA447-H6A.CERN.CH
VMheros am DAQPC: 192.168.0.47
 

Port Forwards:
DAQPC (192.168.0.36): 5901
Slowcontrol (192.168.0.37): 5902
AnneKathrinPC (192.168.0.40): 5903
VAIO (CONF1) (192.168.0.42): 5904
VMheros am DAQPC (192.168.0.47): 5022

Comments:
Remote Control von CESAR:
$ x11vnc -bg -forever

  2   Fri Oct 12 19:42:36 2012 Christian IrmlerMicronBabyConfiguration of normal stack    Unknown

Micron baby stack with all strips connected to APV chips

n-side faces the beam, p-side not read out.

Channels counting from bottom to top

Modules as seen by the beam:

Module name                      z-position [mm]                        Sensor ID
COMM-1                               0.0                                               B2Micron_2965_10_baby2
COMM-2                               24.7                                             B2Micron_2965_14_baby2
SPRAY-1                              49.4                                             B2Micron_2825_05_baby3
SPRAY-2                              75.5                                             B2Micron_2825_05_baby4
COMB-1                               100.9                                           B2Micron_2965_10_baby4
COMB-2                               135.0                                           B2Micron_2965_14_baby4
ATOLL-1                              159.0                                           B2Micron_2965_14_baby3
ATOLL-2                              183.7                                           B2Micron_2965_17_baby3

Attachment 1: micronbaby_stack_geometry.jpg
micronbaby_stack_geometry.jpg
  5   Fri Oct 12 23:51:35 2012 Markus FriedlcommonZimmernummer & Telefonnummern    Unknown

2nd week:

Markus: 38 - 420   (phone: 70 420)

Thomas: 38 - 431   (phone: 70 431)

Chrisu: 38 - 428   (phone:  70 428)

Manni: 38 - 434   (phone: 70 434)

 

1st week:

Markus: 41 - 130   (phone: 60 130)

Annekathrin: 41 - 206   (phone: 60 206)

Thomas: 39 - 108   (phone: 79 108)

Chrisu: 41 - 224   (phone: 60 224)

Manni: 39 - 317   (phone: 79 317)

Marko: 39 - 206   (phone: 79 206)

 

HEPHYs CERN Handy: 162471 

 

Bat. 887 HNA-451:  C3568Y

Bat. 887 HNA-447: 12345 (westseitige Tür)

  6   Fri Oct 12 23:52:57 2012 Markus FriedlcommonSozialisierung    Unknown

Prost, Bergi!

(Das ist nur ein Test, ob du wirklich all die Elog-Emails liest.)

  8   Sat Oct 13 14:44:47 2012 Manfred ValentanMicronOrigami_grossStack configuration, Belle Stack 3    Unknown

Module in Beamrichtung:

2-DSSD Origami  -z
2-DSSD Origami ce
1 Micron Wedge New
1 Micron Wedge Old

n-Seite: Beam abgewand
p-Seite: Beam zugewand

Ausleserichtung Origami:

n-Seite aufsteigend links -> rechts
p-Seite aufsteigend oben -> unten

Ausleserichtung Wedge:

p-Seite: unten -> oben
n-Seite: rechts -> links

Breite Seite der Wedge Sensoren links

Auslese der p-Seite mit 4 APVs:
Origami: Obere 4 APVs (letzte 2 APVs nicht ausgelesen, unten)
Micron: APVs 4,5 nicht ausgelesen (2 obersten)

Micron new: APV0 auf n-Seite I²C - Fehler, APV3 auf p-Seite hat 1/2 Signal

 

 

  10   Sat Oct 13 19:04:23 2012 Markus FriedlMicronOrigami_grossCO2 cooling    Unknown

Wir haben ja schon seit langem vermutet, dass man mit reiner Gasphase nicht kühlen kann. Jetzt erbringen wir den experimentellen Beweis dafür.

Expandierendes Gas kühlt zwar auch, aber nicht so tief runter und vor allem sind beträchtliche Temperaturdifferenzen zwischen den einzelnen Modulen zu beobachten. Das erste Origami bekommt etwa -13°C aber bis zum letzten Micron sind wir auf Raumtemperatur.

Warum das Ganze? Weil Bergi eine CO2-Batterie ohne Steigrohr bestellt hat. Annekathrin ist zwar froh, dass wir das herausgefunden hat und nicht ihre Anlage schuld ist, aber auch traurig, weil dieser Testbeam natürlich die Krönung ihrer Diplomarbeit hätte sein sollen.

Bestellung 27.9.2011 (EDH: Material Request 4732023): SCEM 60.04.15.150.4 = CO2 30 BK 12 CYL. 450 KG (TP); Price: 671 CHF -- das "TP" steht für tube plongeur, zu deutsch: Steigrohr

Bestellung 15.9.2012 (EDH: Material Request 5033041): SCEM 60.04.15.110.3 = CO2 30 BK 12 CYL. - 450 KG; Price: 391 CHF -- das ist erstens eine Andere SCEM (die von 2011 gibt es nicht mehr) und es steht kein "TP". Allein die andere Nummer hätte eine Rückfrage bei Annekathrin implizieren müssen.

Bergi: Das kostet dich ein großes "sumimasen".

Derzeit laufen wir mit Gaskühlung, aber natürlich denken wir schon an einen Plan B.

Über den offiziellen Weg am CERN kriegen wir niemals rechtzeitig CO2-Flaschen, weil die im Store gar nicht lagernd sind.

Montag früh könnten wir mit dem großen Auto zu einem Gashändler in der Nähe fahren und hoffen, dass dort 3 große Gasflaschen mit Steigrohr auf Lager sind. Batterie ist natürlich hoffnungslos, das können wir nicht ohne fremde Hilfe transportieren, einzelne Flaschen hingegen schon.

Eine andere Frage wäre, ob Hans Postema et al. ein paar richtige Gasflaschen auf Lager haben, die wir uns kurzfristig ausborgen könnten.

  13   Sun Oct 14 02:00:12 2012 Manfred ValentanMicronBabyConfiguration of intermediate stack    Unknown

Micron baby stack with every other strip connected to APV chips

n-side faces the beam, p-side not read out.

Channels counting from bottom to top

Modules as seen by the beam:

Module name                      z-position [mm]                        Sensor ID
COMM-I-1                             0.0                                               B2Micron_2965_16_baby2
COMM-I-2                             26.0                                             B2Micron_2965_17_baby2
SPRAY-I-1                            50.4                                             B2Micron_2825_15_baby2  (known issue: I2C-error of APV3)
SPRAY-I-2                            76.2                                             B2Micron_2825_15_baby3
COMB-I-1                             101.8                                           B2Micron_2965_16_baby4
COMB-I-2                             136.8                                           B2Micron_2965_17_baby4
ATOLL-I-1                            161.0                                           B2Micron_2965_10_baby3
ATOLL-I-2                            185.3                                           B2Micron_2965_13_baby3

  20   Mon Oct 15 18:52:18 2012 Marko DragicevicMicronOrigami_grossStack configuration, Belle Stack 2    Unknown

Belle stack 2:

Modules:

  1. Origami #4
  2. Origami #3
  3. Wedge new 1
  4. Wedge old

n-Seite: Beam abgewand
p-Seite: Beam zugewand

Ausleserichtung Origami und Wedge:

  • n-Seite: rechts -> links
  • p-Seite: unten -> oben

Breite Seite der Wedge Sensoren links

Auslese der p-Seiten mit 4 APVs:
Origami: die beiden obersten APVs (#4,5) nicht ausgelesen
Micron: die beiden obersten APVs (#4,5) nicht ausgelesen

Micron new: APV0 auf n-Seite I²C - Fehler

Temperatur sensors:

  • T11: Origami #4 in
  • T12: Origami #4 out
  • T13: Origami #3 in (wrong values!)
  • T14: Origami #3 out
  • T15: Wedge new 1 out
  • T16: Wedge old out
  • T17: Wedge new 1 cooling block
  • T18: Wedge old cooling block

 

  21   Mon Oct 15 19:21:56 2012 Marko DragiceviccommonBeam settings and profile    Unknown

Beam setting file:
H6A.804: FM HAD (H8=+180, H6=120@0mrad) PARALL IN H6A; RD42

Kommentar (Marko):
Das alte Beam Setting File war optimiert fuer H6B, sprich der Beam Focus war dort. Dieses Setting ist neuer und hat den Focus in H6B.

Attachment 1: NetBeans_IDE_3.5_15-Oct-12_19-28-32.png
NetBeans_IDE_3.5_15-Oct-12_19-28-32.png
  30   Tue Oct 16 23:03:09 2012 Markus FriedlcommonSozialisierung    Unknown

So steuert man einen Testbeam!

fondue.jpg

Attachment 1: IMAG2041.jpg
IMAG2041.jpg
  34   Wed Oct 17 14:06:24 2012 Markus FriedlMicronOrigami_grossStack für stealth parasitic mode    Good

Dieser Stack wird jetzt quasi als Pausenkasperl eingebaut und läuft im "stealth parasitic" mode während der Irradiation-Woche. Gut, dass wir alles auch von Wien aus fernsteuern können :-)

pausenfueller1.jpg

pausenfueller2.jpg

  36   Thu Oct 18 09:14:07 2012 Manfred ValentancommonFahrt nach Mol    Unknown

 Liebe Kollegen,

wir brechen. auf. Wünscht uns Glück!

  80   Wed Oct 31 15:54:59 2012 Christian IrmlercommonEthernetkabel zu H6A    Unknown

Ethernetkabel HNA447 -> H6A:

Das obere Ende im Counting Hut liegt im Zwischenboden unterhalb der orangenen Steckdose beim Eingang mit dem elektronischen Zahlenschloß.

Das untere Ende in der Zone hängt aufgerollt an einem Pfeiler der Kabeltasse, unweit der Stelle an der das Kabel von oben hinunter gelassen wurden. Das ist ewta dort wo die Stiege zu PPE146 endet.

siehe Fotos :)

Attachment 1: 2012-10-31_15.47.42.jpg
2012-10-31_15.47.42.jpg
Attachment 2: 2012-10-31_12.28.32.jpg
2012-10-31_12.28.32.jpg
ELOG V3.1.5-fc6679b