Home CMS Production Clean room MedAustron HEPHY testbeams old
testbeam-RD50-DESY-Apr2024 testbeam-RD50-DESY-Jul2023 testbeam-RD50-CERN-Oct2022 testbeam-DESY-Oct2017 testbeam-DESY-April2017 testbeam-SPS2015 testbeam-SPS2014 testbeam-DESY14 testbeam-SPS12 testbeam-SPS11 testbeam-SPS10 testbeam-SPS09 testbeam-SPS08 LP-TPC
  HEPHY logbook for testbeam at SPS October 2012 and Irradiation Mol, Page 3 of 4  Not logged in ELOG logo
New entries since:Thu Jan 1 01:00:00 1970
Entry  Tue Oct 23 08:22:42 2012, Markus Friedl, MicronOrigami_gross, run, run025, 100000, 23.10.2012 08:21:37, 23.10.2012 13:47:09, Good 

Belle Stack 4: 2 DSSD -z, Origami #3, #1, wedge new #2
HV = +-15V, Ibias=47uA
Position: APVs #2, 7, 11, 15 | # 17/18, 21, 25, 29
= p: 2DSSD #2, Origami3 #3, Origami1 #3, wedgenew #3
= n: 2DSSD #1/2, Origami3 #1, Origami1 #1, wedgenew #1

Entry  Tue Oct 23 13:50:44 2012, Markus Friedl, MicronOrigami_gross, cal, cal025, 83800, 23.10.2012 13:47:09 , 23.10.2012 14:35:05, Good 

Belle Stack 4: 2 DSSD -z, Origami #3, #1, wedge new #2
HV = +-15V, Ibias=48uA
Position: APVs #2, 7, 11, 15 | # 17/18, 21, 25, 29
= p: 2DSSD #2, Origami3 #3, Origami1 #3, wedgenew #3
= n: 2DSSD #1/2, Origami3 #1, Origami1 #1, wedgenew #1

Entry  Tue Oct 23 15:55:58 2012, Markus Friedl, MicronOrigami_gross, cal, cal026, 83800, 23.10.2012 14:56:47, 23.10.2012 15:42:17 , Good 

Belle Stack 4: 2 DSSD -z, Origami #3, #1, wedge new #2
HV = +-10V, Ibias=36uA
Position: APVs #2, 7, 11, 15 | # 17/18, 21, 25, 29
= p: 2DSSD #2, Origami3 #3, Origami1 #3, wedgenew #3
= n: 2DSSD #1/2, Origami3 #1, Origami1 #1, wedgenew #1

Entry  Tue Oct 23 16:06:09 2012, Markus Friedl, MicronOrigami_gross, run, run026, 102124, 23.10.2012 16:04:47, 23.10.2012 23:04:56, Unknown 

Belle Stack 4: 2 DSSD -z, Origami #3, #1, wedge new #2
HV = +-10V, Ibias=36uA
Position: APVs #2, 7, 11, 15 | # 17/18, 21, 25, 29
= p: 2DSSD #2, Origami3 #3, Origami1 #3, wedgenew #3
= n: 2DSSD #1/2, Origami3 #1, Origami1 #1, wedgenew #1

SPS Status during whole run: Still problems with North Area steering. means that beam position was not stable.

Entry  Tue Oct 23 23:12:03 2012, Thomas Bergauer, MicronOrigami_gross, run, run027, 220847, 23.10.2012 23:10:14, 24.10.2012 08:19:51, Unknown 

 Belle Stack 4: 2 DSSD -z, Origami #3, #1, wedge new #2

HV = +-5V, Ibias=23.5uA
Position: APVs #2, 7, 11, 15 | # 17/18, 21, 25, 29
= p: 2DSSD #2, Origami3 #3, Origami1 #3, wedgenew #3
= n: 2DSSD #1/2, Origami3 #1, Origami1 #1, wedgenew #1
 
SPS Status during whole run: Still problems with North Area steering. means that beam position was not stable.
Entry  Wed Oct 24 08:25:04 2012, Thomas Bergauer, MicronOrigami_gross, cal, cal027, 83800, 24.10.2012 08:22:25, 24.10.2012 09:10:19, Unknown 

 Belle Stack 4: 2 DSSD -z, Origami #3, #1, wedge new #2

HV = +-5V, Ibias=23.5uA
Position: APVs #2, 7, 11, 15 | # 17/18, 21, 25, 29
= p: 2DSSD #2, Origami3 #3, Origami1 #3, wedgenew #3
= n: 2DSSD #1/2, Origami3 #1, Origami1 #1, wedgenew #1
Entry  Wed Oct 24 09:51:41 2012, Thomas Bergauer, MicronOrigami_gross, cal, cal028, 83800, 24.10.2012 09:50:53, 24.10.2012 10:39:43, Unknown 

 Belle Stack 4: 2 DSSD -z, Origami #3, #1, wedge new #2

HV = +-2.5V, Ibias=14.5uA
Position: APVs #2, 7, 11, 15 | # 17/18, 21, 25, 29
= p: 2DSSD #2, Origami3 #3, Origami1 #3, wedgenew #3
= n: 2DSSD #1/2, Origami3 #1, Origami1 #1, wedgenew #1
Entry  Wed Oct 24 17:24:40 2012, Thomas Bergauer, MicronOrigami_gross, run ohne Strom ;-(, run028, , , , Unknown 

 

Belle Stack 4: 2 DSSD -z, Origami #3, #1, wedge new #2

HV = +-2.5V, Ibias=14.5uA

Position: APVs #2, 7, 11, 15 | # 17/18, 21, 25, 29

= p: 2DSSD #2, Origami3 #3, Origami1 #3, wedgenew #3

= n: 2DSSD #1/2, Origami3 #1, Origami1 #1, wedgenew #1

 

NO DATATAKING BECAUSE OF POWER FAILURE AT NIM CRATE (counter finster, warum?). Georg schaut sich das an, sobald in der zone access ist.

Auch AnnekathrinPC ist nicht erreichbar. 

 

Entry  Sat Oct 27 19:36:24 2012, Markus Friedl, MicronOrigami_gross, cal, cal031, 83800, 27.10.2012 19:59:50, 27.10.2012 20:44:38, Good 

Belle stack 2 after irradiation

HV = +50V -50V

I = 112 µA

CO2 cooling

Entry  Sat Oct 27 21:49:08 2012, Markus Friedl, MicronOrigami_gross, run, run031, 150k, 27.10.2012 21:42:46, 28.10.2012 02:35:55 (+1h due to winter time), Good 

Belle stack 2 after gamma irrdiation
HV = +50V -50 V
I = 102 uA
CO2 cooling

 

Entry  Sun Oct 28 02:51:49 2012, Markus Friedl, MicronOrigami_gross, run, run032, 150k, 28.10.2012 02:47:24, 28.10.2012 08:31:19 , Good 

Belle stack 2 after gamma irradiation

HV = +50V -50V

I = 101 uA

Bias currents absolutely stable during the whole run.

CO2 cooling

hitting APV3 (n side) = wide side of wedge sensor

Entry  Sun Oct 28 08:37:53 2012, Christian Irmler, MicronOrigami_gross, run, run033, 66937, 28.10.2012 08:33:42, 28.10.2012 14:10:43 , Unknown temp_run33.JPGtemp_run33_2.JPG

Belle stack 2 after gamma irradiation

HV = +50V -50V

I = 101 uA

CO2 cooling

hitting APV2 (n side) = center of wedge sensor

 

Temperatur sensors:

  • T11: Origami #4 in
  • T12: Origami #4 out
  • T13: Origami #3 in (still wrong values!)
  • T14: Origami #3 out
  • T15: Wedge new 1 out
  • T16: Wedge old out
  • T17: Wedge new 1 cooling block
  • T18: Wedge old cooling block
Entry  Tue Oct 30 17:24:01 2012, Markus Friedl, MicronOrigami_gross, cal, cal040, 83800, 30.10.2012 17:20:28 , 30.10.2012 17:54:09, Unknown 

Cooling for 2DSSD established after some struggle.

2DSSD fully read out with cooling
HV= +40 V -40 V    I = 2 uA
Beam position: none

 

Positions of thermal sensors:

11   Kapillare Anfang

12   Kapillare Ende

13   ---

14   unmittelbar nach Kapillare

15   Origami in

16   Origami out

17   Origami -z

18   Origami CE

 

Strip order:

n-Seite: rechts (Salev) nach links (Jura)

p-Seite: oben nach unten

 

APV chips with lower noise:

                          -z                                   ce
p-side             #5                                #10 (= pos 4)
n-side             #13 (= pos1)             #19 (= pos 3)

Entry  Tue Oct 30 18:35:51 2012, Christian Irmler, MicronOrigami_gross, run, run040, 100k, 30.10.2012 18:23:21, 30.10.2012 21:55:53 , Unknown temperatures_run040.jpg

Cooling for 2DSSD established after some struggle.

2DSSD fully read out with cooling
HV= +40 V -40 V    I = 2.1 uA

Beam position:
  Origami -z 
  p-side: APV #5 
  n-side: APV #13 (= pos.1 of -z)

 

Positions of thermal sensors:

11   Kapillare Anfang

12   Kapillare Ende

13   ---

14   unmittelbar nach Kapillare

15   Origami in

16   Origami out

17   Origami -z

18   Origami CE

 

Strip order:

n-Seite: rechts (Salev) nach links (Jura)

p-Seite: oben nach unten

 

APV chips with lower noise:

                          -z                                   ce
p-side             #5                                #10 (= pos 4)
n-side             #13 (= pos1)             #19 (= pos 3)

Entry  Tue Oct 30 22:15:41 2012, Markus Friedl, MicronOrigami_gross, run, run041, 100k, 30.10.2012 22:09:13, , Unknown temperatures_run041.jpg

Cooling for 2DSSD established after some struggle.

2DSSD fully read out with cooling
HV= +40 V -40 V    I =  1.84 uA

Beam position: 
Origami ce:
   p-side:  APV #10  (= pos 4)
   n-side:  APV #19  (= pos 3)

Positions of thermal sensors:

11   Kapillare Anfang

12   Kapillare Ende

13   ---

14   unmittelbar nach Kapillare

15   Origami in

16   Origami out

17   Origami -z

18   Origami CE

 

Strip order:

n-Seite: rechts (Salev) nach links (Jura)

p-Seite: oben nach unten

 

APV chips with lower noise:

                          -z                                   ce
p-side             #5                                #10 (= pos 4)
n-side             #13 (= pos1)             #19 (= pos 3)

 

 

 

Entry  Fri Oct 12 19:42:36 2012, Christian Irmler, MicronBaby, Configuration of normal stack, , , , , Unknown micronbaby_stack_geometry.jpg

Micron baby stack with all strips connected to APV chips

n-side faces the beam, p-side not read out.

Channels counting from bottom to top

Modules as seen by the beam:

Module name                      z-position [mm]                        Sensor ID
COMM-1                               0.0                                               B2Micron_2965_10_baby2
COMM-2                               24.7                                             B2Micron_2965_14_baby2
SPRAY-1                              49.4                                             B2Micron_2825_05_baby3
SPRAY-2                              75.5                                             B2Micron_2825_05_baby4
COMB-1                               100.9                                           B2Micron_2965_10_baby4
COMB-2                               135.0                                           B2Micron_2965_14_baby4
ATOLL-1                              159.0                                           B2Micron_2965_14_baby3
ATOLL-2                              183.7                                           B2Micron_2965_17_baby3

Entry  Fri Oct 12 22:00:52 2012, Christian Irmler, MicronBaby, cal, cal001, 83800, 12.10.2012 21:16:33, 12.10.2012 21:59:02, Good 

12.10.2012  21:16:33  event=0  Disk space: Needed=0.00 GB, Available=206.59 GB, Total=931.51 GB
12.10.2012  21:16:33  event=0  DAQ start (mode: Calibration Scan)
12.10.2012  21:16:33  event=0  Init NECO... done
12.10.2012  21:16:34  event=0  Init APVs... done
12.10.2012  21:16:37  event=0  Send 10 dummy triggers to initialize APV pedestals... done
12.10.2012  21:16:37  event=0  Init FADCs... done
12.10.2012  21:16:37  event=0  Taking 600 pedestal events
12.10.2012  21:16:45  event=599  Pedestal and Noise evaluation done - switching to Calibration Scan
12.10.2012  21:17:39  event=2459  rate=8events/s temp/curr=32.7/097.5 32.7/-08.2 32.7/-08.3 32.8/-08.3 31.2/001.6 31.2/001.7 31.2/001.6 31.2/001.4
12.10.2012  21:18:43  event=4023  rate=8events/s temp/curr=32.6/097.3 32.7/-08.2 32.7/-08.5 32.7/-08.3 31.1/001.6 31.1/001.6 31.1/001.6 31.1/001.6
12.10.2012  21:19:49  event=5600  rate=50events/s temp/curr=32.7/097.5 32.6/-08.3 32.6/-08.3 32.6/-08.3 31.1/001.6 31.1/001.6 31.1/001.6 31.1/001.6
12.10.2012  21:20:53  event=7990  rate=7events/s temp/curr=32.6/097.5 32.6/-08.2 32.6/-08.5 32.6/-08.3 31.1/001.6 31.0/001.6 31.1/001.6 31.0/001.6
12.10.2012  21:21:59  event=8694  rate=6events/s temp/curr=32.5/097.3 32.6/-08.2 32.6/-08.5 32.6/-08.3 31.1/001.6 31.0/001.6 31.0/001.6 31.0/001.6
12.10.2012  21:23:02  event=11116  rate=66events/s temp/curr=32.5/097.3 32.6/-08.3 32.5/-08.3 32.5/-08.3 31.0/001.4 31.0/001.7 31.0/001.6 31.0/001.6
12.10.2012  21:24:06  event=13095  rate=7events/s temp/curr=32.5/097.3 32.5/-08.3 32.5/-08.3 32.5/-08.3 31.0/001.6 30.9/001.6 31.0/001.6 31.0/001.6
12.10.2012  21:25:08  event=15105  rate=5events/s temp/curr=32.4/097.5 32.5/-08.3 32.5/-08.3 32.5/-08.3 31.0/001.6 30.9/001.6 30.9/001.6 31.0/001.6
12.10.2012  21:26:13  event=16444  rate=7events/s temp/curr=32.5/097.3 32.4/-08.3 32.4/-08.3 32.5/-08.3 30.9/001.6 30.9/001.6 31.0/001.6 31.0/001.6
12.10.2012  21:27:22  event=18050  rate=6events/s temp/curr=32.4/097.5 32.4/-08.3 32.4/-08.5 32.4/-08.5 30.9/001.6 30.9/001.6 30.9/001.6 30.9/001.6
12.10.2012  21:28:25  event=19878  rate=8events/s temp/curr=32.4/097.3 32.4/-08.3 32.4/-08.3 32.4/-08.3 30.7/001.6 30.9/001.6 30.9/001.6 30.7/001.6
12.10.2012  21:29:26  event=21875  rate=7events/s temp/curr=32.3/097.3 32.3/-08.2 32.4/-08.3 32.3/-08.3 30.7/001.4 30.7/001.6 30.7/001.6 30.7/001.6
12.10.2012  21:30:28  event=24200  rate=50events/s temp/curr=32.3/097.3 32.3/-08.2 32.3/-08.3 32.3/-08.5 30.7/001.6 30.7/001.7 30.7/001.6 30.7/001.6
12.10.2012  21:31:33  event=26300  rate=50events/s temp/curr=32.4/097.5 32.3/-08.2 32.4/-08.3 32.3/-08.3 30.7/001.6 30.7/001.7 30.7/001.6 30.7/001.6
12.10.2012  21:32:41  event=28400  rate=9events/s temp/curr=32.3/097.3 32.3/-08.3 32.2/-08.3 32.3/-08.3 30.7/001.6 30.7/001.6 30.7/001.6 30.6/001.6
12.10.2012  21:33:43  event=30300  rate=50events/s temp/curr=32.3/097.5 32.3/-08.3 32.3/-08.3 32.3/-08.3 30.7/001.6 30.7/001.6 30.7/001.6 30.7/001.6
12.10.2012  21:34:46  event=32242  rate=42events/s temp/curr=32.2/097.5 32.3/-08.3 32.2/-08.5 32.3/-08.3 30.7/001.6 30.7/001.7 30.7/001.6 30.6/001.4
12.10.2012  21:35:50  event=34167  rate=67events/s temp/curr=32.2/097.3 32.3/-08.3 32.2/-08.3 32.2/-08.3 30.7/001.6 30.7/001.6 30.7/001.6 30.7/001.4
12.10.2012  21:36:54  event=35928  rate=7events/s temp/curr=32.2/097.3 32.2/-08.3 32.0/-08.3 32.2/-08.3 30.6/001.4 30.7/001.6 30.7/001.6 30.6/001.4
12.10.2012  21:37:54  event=38470  rate=8events/s temp/curr=32.0/097.5 32.2/-08.3 32.2/-08.3 32.2/-08.3 30.6/001.6 30.6/001.6 30.6/001.6 30.6/001.6
12.10.2012  21:39:00  event=40751  rate=1events/s temp/curr=32.2/097.5 32.2/-08.2 32.2/-08.3 32.2/-08.3 30.6/001.6 30.6/001.6 30.6/001.6 30.6/001.6
12.10.2012  21:40:04  event=42861  rate=7events/s temp/curr=32.2/097.5 32.2/-08.3 32.2/-08.3 32.2/-08.3 30.6/001.6 30.6/001.6 30.6/001.6 30.6/001.6
12.10.2012  21:41:05  event=44950  rate=50events/s temp/curr=32.2/097.5 32.2/-08.2 32.0/-08.3 32.2/-08.3 30.5/001.6 30.6/001.6 30.6/001.6 30.6/001.6
12.10.2012  21:42:10  event=47954  rate=4events/s temp/curr=32.2/097.5 32.2/-08.2 32.2/-08.5 32.2/-08.3 30.5/001.6 30.5/001.6 30.5/001.6 30.5/001.6
12.10.2012  21:43:18  event=49909  rate=7events/s temp/curr=32.2/097.3 32.0/-08.3 32.2/-08.3 32.2/-08.3 30.5/001.6 30.5/001.6 30.6/001.6 30.5/001.6
12.10.2012  21:44:17  event=52950  rate=68events/s temp/curr=32.0/097.3 32.2/-08.3 32.0/-08.3 32.0/-08.3 30.5/001.6 30.5/001.6 30.5/001.6 30.5/001.6
12.10.2012  21:45:17  event=55800  rate=50events/s temp/curr=32.2/097.3 32.2/-08.2 32.2/-08.3 32.2/-08.3 30.4/001.6 30.5/001.6 30.5/001.6 30.5/001.6
12.10.2012  21:46:18  event=59281  rate=31events/s temp/curr=32.2/097.5 32.2/-08.2 32.2/-08.5 32.0/-08.3 30.5/001.6 30.5/001.6 30.5/001.6 30.5/001.6
12.10.2012  21:47:19  event=61723  rate=73events/s temp/curr=32.0/097.5 32.0/-08.2 32.2/-08.5 32.0/-08.3 30.4/001.6 30.5/001.6 30.5/001.6 30.4/001.6
12.10.2012  21:48:20  event=64750  rate=60events/s temp/curr=32.0/097.3 32.2/-08.2 32.0/-08.5 32.0/-08.5 30.5/001.6 30.5/001.6 30.5/001.6 30.4/001.6
12.10.2012  21:49:21  event=66450  rate=50events/s temp/curr=32.0/097.3 32.2/-08.3 32.0/-08.3 32.0/-08.3 30.5/001.6 30.5/001.7 30.4/001.6 30.5/001.6
12.10.2012  21:50:23  event=69850  rate=2events/s temp/curr=32.0/097.5 32.0/-08.3 32.0/-08.5 32.0/-08.3 30.5/001.6 30.4/001.6 30.5/001.6 30.5/001.6
12.10.2012  21:51:23  event=73142  rate=7events/s temp/curr=32.0/097.3 32.2/-08.3 32.0/-08.3 32.0/-08.3 30.4/001.6 30.5/001.6 30.4/001.6 30.4/001.4
12.10.2012  21:52:33  event=74250  rate=5events/s temp/curr=32.0/097.3 31.9/-08.2 32.0/-08.3 32.0/-08.3 30.4/001.6 30.4/001.6 30.4/001.6 30.4/001.6
12.10.2012  21:53:43  event=75006  rate=30events/s temp/curr=32.0/097.3 32.0/-08.3 32.0/-08.3 32.0/-08.3 30.4/001.6 30.4/001.6 30.4/001.6 30.4/001.4
12.10.2012  21:54:45  event=76973  rate=6events/s temp/curr=32.0/097.3 32.0/-08.3 32.0/-08.5 32.0/-08.3 30.4/001.6 30.4/001.6 30.3/001.6 30.4/001.6
12.10.2012  21:55:49  event=78788  rate=6events/s temp/curr=32.0/097.5 31.9/-08.2 31.9/-08.3 32.0/-08.3 30.4/001.6 30.4/001.6 30.3/001.6 30.4/001.6
12.10.2012  21:56:57  event=80261  rate=7events/s temp/curr=32.0/097.5 31.9/-08.2 31.9/-08.3 32.0/-08.3 30.4/001.4 30.4/001.6 30.4/001.6 30.4/001.6
12.10.2012  21:57:58  event=82550  rate=64events/s temp/curr=31.9/097.3 32.0/-08.3 31.9/-08.3 31.9/-08.3 30.4/001.6 30.4/001.6 30.4/001.6 30.3/001.6
12.10.2012  21:58:54  event=83800  Processing calibration data... done
12.10.2012  21:58:55  event=83800  Writing calibration file D:\cern12\micronbaby\data\cal001.cal...done
12.10.2012  21:59:02  event=83800  DAQ stop (mode: Calibration Scan)
12.10.2012  21:59:02  event=83800  Writing properties file D:\cern12\micronbaby\data\cal001.pro...done
 

Entry  Fri Oct 12 23:10:14 2012, Christian Irmler, MicronBaby, run, run001, 333000, 12.10.2012 23:05:19, 13.10.2012 06:29:00, Good 

Micron baby stack
HV = -100V   I=5.8uA
beam on

 

Final DESY position (center of vertical beam profile)

Module position: 0 / +5.0 -- hitting the upper half of the sensor (centered on odd APVs)

Entry  Sat Oct 13 06:55:47 2012, Manfred Valentan, MicronBaby, run, run002, 234019, 13.10.2012 06:50:00, 13.10.2012 13:50:40, Unknown 

Micron baby stack
HV = -100V   I=5.4uA
beam on

 

Final DESY position (center of vertical beam profile)

Module position: 0 / -13.0 -- hitting the lower half of the sensor (centered on even APVs)

Run interrupted due to RF transmitter fault.

Entry  Sun Oct 14 02:00:12 2012, Manfred Valentan, MicronBaby, Configuration of intermediate stack, , , , , Unknown 

Micron baby stack with every other strip connected to APV chips

n-side faces the beam, p-side not read out.

Channels counting from bottom to top

Modules as seen by the beam:

Module name                      z-position [mm]                        Sensor ID
COMM-I-1                             0.0                                               B2Micron_2965_16_baby2
COMM-I-2                             26.0                                             B2Micron_2965_17_baby2
SPRAY-I-1                            50.4                                             B2Micron_2825_15_baby2  (known issue: I2C-error of APV3)
SPRAY-I-2                            76.2                                             B2Micron_2825_15_baby3
COMB-I-1                             101.8                                           B2Micron_2965_16_baby4
COMB-I-2                             136.8                                           B2Micron_2965_17_baby4
ATOLL-I-1                            161.0                                           B2Micron_2965_10_baby3
ATOLL-I-2                            185.3                                           B2Micron_2965_13_baby3

ELOG V3.1.5-fc6679b