Home CMS Production Clean room MedAustron HEPHY testbeams old
testbeam-RD50-DESY-Jul2023 testbeam-RD50-CERN-Oct2022 testbeam-DESY-Oct2017 testbeam-DESY-April2017 testbeam-SPS2015 testbeam-SPS2014 testbeam-DESY14 testbeam-SPS12 testbeam-SPS11 testbeam-SPS10 testbeam-SPS09 testbeam-SPS08 LP-TPC
  HEPHY logbook for testbeam at SPS October 2012 and Irradiation Mol, Page 3 of 4  Not logged in ELOG logo
Entry  Tue Oct 30 10:37:19 2012, Markus Friedl, HPK_baby, cal, cal039, 83800, 30.10.2012 10:35:35 , 30.10.2012 11:02:06 , Good 
Turned off cooling, now taking warm data
 
HPK baby stack after irradiation - no cooling
Entry  Tue Oct 30 11:05:32 2012, Markus Friedl, HPK_baby, run, run039, 150k, 30.10.2012 11:03:19, 30.10.2012 14:57:57, Unknown 
HPK baby stack after irradiation - no cooling
I =  420A and growing (warming up)
positioned centered on p and n
Entry  Tue Oct 30 17:24:01 2012, Markus Friedl, MicronOrigami_gross, cal, cal040, 83800, 30.10.2012 17:20:28 , 30.10.2012 17:54:09, Unknown 
Cooling for 2DSSD established after some struggle.
2DSSD fully read out with cooling
HV= +40 V -40 V    I = 2 uA
Entry  Tue Oct 30 22:15:41 2012, Markus Friedl, MicronOrigami_gross, run, run041, 100k, 30.10.2012 22:09:13, , Unknown temperatures_run041.jpg
Cooling for 2DSSD established after some struggle.
2DSSD fully read out with cooling
HV= +40 V -40 V    I =  1.84 uA
Entry  Fri Oct 12 15:04:55 2012, Marko Dragicevic, common, Network configuration, , , , , Unknown 
Router:
IP 137.138.113.230
Hostname ROUTERHEPHY.cern.ch
Entry  Sun Oct 14 20:12:14 2012, Marko Dragicevic, Infineon, run, run007, 110k, 14.10.2012 20:07:12, 14.10.2012 21:04:12, Unknown 
Infineon Stack Version 1 (with height information, BabyStrips horizontal Strixel vertical)
HV = 300V   I=3uA
beam on
Entry  Sun Oct 14 23:01:11 2012, Marko Dragicevic, Infineon, cal, cal004, 83800, 14.10.2012 21:44:00, 14.10.2012 21:03:00, Unknown 
Infineon Stack Version 1 (with height information, BabyStrips horizontal Strixel vertical)
HV = 300V   I=3.1 uA
Entry  Mon Oct 15 00:08:26 2012, Marko Dragicevic, Infineon, run, run008, 339075, 15.10.2012 01:49:33, 15.10.2012 08:04:24, Unknown 
 Infineon Stack Version 2 (no height information, BabyStrips vertical Strixel vertical)
HV = 300V   I=4uA
beam on
Entry  Mon Oct 15 18:52:18 2012, Marko Dragicevic, MicronOrigami_gross, Stack configuration, Belle Stack 2, , , , , Unknown 
Belle stack 2:
Modules:

    Origami #4
    Origami #3
    Wedge new 1
    Wedge old

n-Seite: Beam abgewand
Entry  Mon Oct 15 19:21:56 2012, Marko Dragicevic, common, Beam settings and profile, , , , , Unknown NetBeans_IDE_3.5_15-Oct-12_19-28-32.png
Beam setting file:
H6A.804: FM HAD (H8=+180, H6=120@0mrad) PARALL IN H6A; RD42
Kommentar (Marko):
Entry  Mon Oct 15 19:40:03 2012, Marko Dragicevic, MicronOrigami_gross, run ATTENTION: wrong bias voltage, run009, 31650, 15.10.2012 19:28:30 , 15.10.2012 22:08:31 , Crap 
ATTENTION! Bias voltage was +-100 V instead of +-50 V 
Origami Stack 2: Origami #4, #3, Wedge new1, old
HV = +-100V
Entry  Mon Oct 15 22:13:28 2012, Marko Dragicevic, MicronOrigami_gross, cal ATTENTION: wrong bias voltage , cal005, 83800, 15.10.2012 22:16:26, 15.10.2012 23:07:37 , Unknown 
ATTENTION: Bias voltage was +-100 V instead of +- 50 V
Origami Stack 2: Origami #4, #3, Wedge new1, old
HV = +-100V
Entry  Mon Oct 15 23:26:52 2012, Marko Dragicevic, MicronOrigami_gross, run ATTENTION: wrong bias voltage, run010, 158k, 15.10.2012 23:10:40 , 16.10.2012 05:05:35, Crap 
ATTENTION: Bias voltage was +-100 V instead of +- 50 V
Same as run009.
Origami Stack 2: Origami #4, #3, Wedge new1, old
Entry  Wed Oct 17 01:21:50 2012, Marko Dragicevic, Infineon, run, run009, 150k, 15.10.2012 08:20:15, 15.10.2012 11:01:11, Unknown 
 This run was not recorded in original sequence in the ELOG!!!
 

    
        
Entry  Sat Oct 13 06:55:47 2012, Manfred Valentan, MicronBaby, run, run002, 234019, 13.10.2012 06:50:00, 13.10.2012 13:50:40, Unknown 
Micron baby stack
HV = -100V   I=5.4uA
beam on
Entry  Sat Oct 13 14:44:47 2012, Manfred Valentan, MicronOrigami_gross, Stack configuration, Belle Stack 3, , , , , Unknown 
Module in Beamrichtung:
2-DSSD Origami  -z
2-DSSD Origami ce
Entry  Sat Oct 13 19:04:02 2012, Manfred Valentan, MicronOrigami_gross, run with Belle stack 3, run003, 30k, 13.10.2012 19:02:31, , Unknown 
 Belle stack 3: 2DSSD-Origami, Wedge_New_1, Wedge_old
HV = +- 50V
I_ges = 11.6 µA
Entry  Sun Oct 14 02:00:12 2012, Manfred Valentan, MicronBaby, Configuration of intermediate stack, , , , , Unknown 
Micron baby stack with every other strip connected to APV chips
n-side faces the beam, p-side not read out.
Channels counting from bottom to top
Entry  Sun Oct 14 02:02:39 2012, Manfred Valentan, MicronBaby, run, run005, 300k, 14.10.2012 02:00:08, 14.10.2012 08:17:02, Unknown 
Micron baby intermediate stack
HV = -100V   I=6.3uA
beam on
Entry  Sun Oct 14 08:25:10 2012, Manfred Valentan, MicronBaby, cal, cal003, 83800, 14.10.2012 08:21:46, 14.10.2012 08:51:58, Unknown 
Micron baby intermediate stack
HV = -100 V
I = 6.9 uA
ELOG V3.1.5-fc6679b