Home CMS Production Clean room MedAustron HEPHY testbeams old
testbeam-RD50-DESY-Apr2024 testbeam-RD50-DESY-Jul2023 testbeam-RD50-CERN-Oct2022 testbeam-DESY-Oct2017 testbeam-DESY-April2017 testbeam-SPS2015 testbeam-SPS2014 testbeam-DESY14 testbeam-SPS12 testbeam-SPS11 testbeam-SPS10 testbeam-SPS09 testbeam-SPS08 LP-TPC
  HEPHY logbook for testbeam at SPS October 2012 and Irradiation Mol, Page 2 of 4  Not logged in ELOG logo
Entry  Sat Oct 20 11:40:13 2012, Markus Friedl, MicronOrigami_gross, run, run019, 100000, 20.10.2012 11:38:19, 20.10.2012 19:20:51, Good 

Belle Stack 4: 2 DSSD -z, Origami #3, #1, wedge new #2
HV = +-45V, Ibias=72A
Position: APVs #2, 7, 11, 15 | # 17/18, 21, 25, 29
= p: 2DSSD #2, Origami3 #3, Origami1 #3, wedgenew #3
= n: 2DSSD #1/2, Origami3 #1, Origami1 #1, wedgenew #1

Several periods without beam during this run.

Entry  Sat Oct 20 19:35:30 2012, Markus Friedl, MicronOrigami_gross, run, run020, 300000, 20.10.2012 19:34:19, 21.10.2012 08:55:28, Good 

Belle Stack 4: 2 DSSD -z, Origami #3, #1, wedge new #2
HV = +-40V, Ibias=73A
Position: APVs #2, 7, 11, 15 | # 17/18, 21, 25, 29
= p: 2DSSD #2, Origami3 #3, Origami1 #3, wedgenew #3
= n: 2DSSD #1/2, Origami3 #1, Origami1 #1, wedgenew #1

 

Entry  Sun Oct 21 10:39:15 2012, Markus Friedl, MicronOrigami_gross, run, run021, 100000, 21.10.2012 10:37:26, 21.10.2012 15:04:49, Good 

Belle Stack 4: 2 DSSD -z, Origami #3, #1, wedge new #2
HV = +-35V, Ibias=69uA
Position: APVs #2, 7, 11, 15 | # 17/18, 21, 25, 29
= p: 2DSSD #2, Origami3 #3, Origami1 #3, wedgenew #3
= n: 2DSSD #1/2, Origami3 #1, Origami1 #1, wedgenew #1

 

Entry  Sun Oct 21 16:04:06 2012, Markus Friedl, MicronOrigami_gross, run, run022, 151282, 21.10.2012 18:16:53, 22.10.2012 00:04:42, Good 

Belle Stack 4: 2 DSSD -z, Origami #3, #1, wedge new #2
HV = +-30V, Ibias=70uA
Position: APVs #2, 7, 11, 15 | # 17/18, 21, 25, 29
= p: 2DSSD #2, Origami3 #3, Origami1 #3, wedgenew #3
= n: 2DSSD #1/2, Origami3 #1, Origami1 #1, wedgenew #1

Entry  Mon Oct 22 00:57:05 2012, Markus Friedl, MicronOrigami_gross, run, run023, 176629, 22.10.2012 00:55:59, 22.10.2012 10:04:38, Good 

Belle Stack 4: 2 DSSD -z, Origami #3, #1, wedge new #2
HV = +-25V, Ibias=65uA
Position: APVs #2, 7, 11, 15 | # 17/18, 21, 25, 29
= p: 2DSSD #2, Origami3 #3, Origami1 #3, wedgenew #3
= n: 2DSSD #1/2, Origami3 #1, Origami1 #1, wedgenew #1

No more events since 22.10.2012  07:09:53  event=176629 - spill signals removed?

 

Entry  Mon Oct 22 19:19:53 2012, Markus Friedl, MicronOrigami_gross, run, run024, 260000, 22.10.2012 19:18:16, 23.10.2012 08:17:20 , Good 

Belle Stack 4: 2 DSSD -z, Origami #3, #1, wedge new #2
HV = +-20V, Ibias=57uA
Position: APVs #2, 7, 11, 15 | # 17/18, 21, 25, 29
= p: 2DSSD #2, Origami3 #3, Origami1 #3, wedgenew #3
= n: 2DSSD #1/2, Origami3 #1, Origami1 #1, wedgenew #1

 

Beam shape on n side (horizontally) different than in previous runs. Number of triggers per spill is reduced to ~60k (was 200..250k before). Reason unknown.

Entry  Tue Oct 23 08:22:42 2012, Markus Friedl, MicronOrigami_gross, run, run025, 100000, 23.10.2012 08:21:37, 23.10.2012 13:47:09, Good 

Belle Stack 4: 2 DSSD -z, Origami #3, #1, wedge new #2
HV = +-15V, Ibias=47uA
Position: APVs #2, 7, 11, 15 | # 17/18, 21, 25, 29
= p: 2DSSD #2, Origami3 #3, Origami1 #3, wedgenew #3
= n: 2DSSD #1/2, Origami3 #1, Origami1 #1, wedgenew #1

Entry  Tue Oct 23 16:06:09 2012, Markus Friedl, MicronOrigami_gross, run, run026, 102124, 23.10.2012 16:04:47, 23.10.2012 23:04:56, Unknown 

Belle Stack 4: 2 DSSD -z, Origami #3, #1, wedge new #2
HV = +-10V, Ibias=36uA
Position: APVs #2, 7, 11, 15 | # 17/18, 21, 25, 29
= p: 2DSSD #2, Origami3 #3, Origami1 #3, wedgenew #3
= n: 2DSSD #1/2, Origami3 #1, Origami1 #1, wedgenew #1

SPS Status during whole run: Still problems with North Area steering. means that beam position was not stable.

Entry  Tue Oct 23 23:12:03 2012, Thomas Bergauer, MicronOrigami_gross, run, run027, 220847, 23.10.2012 23:10:14, 24.10.2012 08:19:51, Unknown 

 Belle Stack 4: 2 DSSD -z, Origami #3, #1, wedge new #2

HV = +-5V, Ibias=23.5uA
Position: APVs #2, 7, 11, 15 | # 17/18, 21, 25, 29
= p: 2DSSD #2, Origami3 #3, Origami1 #3, wedgenew #3
= n: 2DSSD #1/2, Origami3 #1, Origami1 #1, wedgenew #1
 
SPS Status during whole run: Still problems with North Area steering. means that beam position was not stable.
Entry  Sat Oct 27 01:13:47 2012, Christian Irmler, MicronBaby, run, run029, 307k, 27.10.2012 01:02:49, 27.10.2012 07:36:34, Good 

After irradiation

xy-table: x=319.4, y=74.6
beam hits APV0

Micron baby stack after gamma irrdiation
HV = -100 V
I = -58 uA

Entry  Sat Oct 27 07:51:49 2012, Manfred Valentan, MicronBaby, run, run030, 376678, 27.10.2012 07:49:09, 27.10.2012 17:32:07, Good 

After irradiation

xy-table: x=319.4, y=87.6
beam hits APV1

Micron baby stack after gamma irrdiation
HV = -100 V
I = -58 uA

Entry  Sat Oct 27 21:49:08 2012, Markus Friedl, MicronOrigami_gross, run, run031, 150k, 27.10.2012 21:42:46, 28.10.2012 02:35:55 (+1h due to winter time), Good 

Belle stack 2 after gamma irrdiation
HV = +50V -50 V
I = 102 uA
CO2 cooling

 

Entry  Sun Oct 28 02:51:49 2012, Markus Friedl, MicronOrigami_gross, run, run032, 150k, 28.10.2012 02:47:24, 28.10.2012 08:31:19 , Good 

Belle stack 2 after gamma irradiation

HV = +50V -50V

I = 101 uA

Bias currents absolutely stable during the whole run.

CO2 cooling

hitting APV3 (n side) = wide side of wedge sensor

Entry  Sun Oct 28 08:37:53 2012, Christian Irmler, MicronOrigami_gross, run, run033, 66937, 28.10.2012 08:33:42, 28.10.2012 14:10:43 , Unknown temp_run33.JPGtemp_run33_2.JPG

Belle stack 2 after gamma irradiation

HV = +50V -50V

I = 101 uA

CO2 cooling

hitting APV2 (n side) = center of wedge sensor

 

Temperatur sensors:

  • T11: Origami #4 in
  • T12: Origami #4 out
  • T13: Origami #3 in (still wrong values!)
  • T14: Origami #3 out
  • T15: Wedge new 1 out
  • T16: Wedge old out
  • T17: Wedge new 1 cooling block
  • T18: Wedge old cooling block
Entry  Sun Oct 28 16:22:35 2012, Christian Irmler, MicronBaby, run, run034, 101864, 28.10.2012 16:12:24 , 28.10.2012 18:34:24, Good 

Micron Baby stack 2 after irradiation (intermediate strips)
HV = -100 V
I = 36.3 uA

Position APV0 of all sensors

X-Y Table coordinates:
X=0 / Y=-1  (afterwards: nulled)

PC power cut after ~100k events

Entry  Sun Oct 28 20:07:28 2012, Markus Friedl, MicronBaby, run, run035, 304110, 28.10.2012 20:01:48, 29.10.2012 03:50:44, Good 

Micron Baby stack 2 after irradiation (intermediate strips)
HV = -100 V
I = 39 uA
 

DESY table shifted by 2.5mm (beam down) after beam profile was changed (to get higher intensity)

beam hitting lower APVs

Entry  Mon Oct 29 04:02:16 2012, Manfred Valentan, MicronBaby, run, run036, 296294, 29.10.2012 03:53:33, 29.10.2012 11:05:35, Unknown 

Micron Baby stack 2 after irradiation (intermediate strips)
HV = -100 V
I = 36 uA
 

DESY table shifted by 2.5mm (beam down) after beam profile was changed (to get higher intensity)

beam hitting higher APVs

 

Stopped when long beam off period was announced

Entry  Mon Oct 29 12:24:41 2012, Markus Friedl, Infineon, run, run037, 301382, 29.10.2012 12:22:22, 29.10.2012 21:05:57, Good 

Infineon stack Version 2 after irradiation
HV = +300 V
I = 162 A
 

hitting upper part of strixels and baby, vertically ~centered

Entry  Mon Oct 29 23:13:52 2012, Markus Friedl, HPK_baby, run, run038, 476500, 29.10.2012 23:13:05, 30.10.2012 10:22:54, Unknown 

HPK baby stack after irradiation with partial cooling (HPK neutron & HPK neutron/gamma)
HV = +75 V  -75V
I =  176A
positioned centered on p and n
 

Temp sensors configuration:

11   HPK Neutron n in

12   HPK Neutron n -> p

13   ----

14   HPK Neutron p -> Gamma p

15   Gamma p -> n

16   Neutron Gamma n out

 

Perfect cooling curve :-)

Entry  Tue Oct 30 11:05:32 2012, Markus Friedl, HPK_baby, run, run039, 150k, 30.10.2012 11:03:19, 30.10.2012 14:57:57, Unknown 

HPK baby stack after irradiation - no cooling
I =  420A and growing (warming up)
positioned centered on p and n
 

ELOG V3.1.5-fc6679b