Home CMS Production Clean room MedAustron HEPHY testbeams old
testbeam-RD50-DESY-Jul2023 testbeam-RD50-CERN-Oct2022 testbeam-DESY-Oct2017 testbeam-DESY-April2017 testbeam-SPS2015 testbeam-SPS2014 testbeam-DESY14 testbeam-SPS12 testbeam-SPS11 testbeam-SPS10 testbeam-SPS09 testbeam-SPS08 LP-TPC
  HEPHY logbook for testbeam at SPS October 2012 and Irradiation Mol, Page 2 of 4  Not logged in ELOG logo
Entry  Tue Oct 16 22:19:21 2012, Christian Irmler, MicronOrigami_gross, cal, cal007, 83800, 16.10.2012 20:25:17 , 16.10.2012 21:12:01 , Unknown 
Origami Stack 2: Origami #4, #3, Wedge new1, old
HV = +-50V, Ibias=12.3µA
Position: verticallbtween APV 1&2 of 6,  left side of sensor, 
Entry  Tue Oct 16 23:35:28 2012, Christian Irmler, MicronOrigami_gross, run, run014, 150k, 16.10.2012 23:32:24, 17.10.2012 04:59:02 , Unknown run014_temperatures.jpg
Same as run011, but now with +- 50V bias voltage.
Origami Stack 2: Origami #4, #3, Wedge new1, old
HV = +-10V
Entry  Wed Oct 17 05:16:22 2012, Christian Irmler, MicronOrigami_gross, run, run015, 54005, 17.10.2012 05:10:06, 17.10.2012 07:27:20, Unknown run015_temperatures.JPG
Origami Stack 2: Origami #4, #3, Wedge new1, old
HV = +-50V
Ibias=4.43µA
Entry  Wed Oct 17 14:06:24 2012, Markus Friedl, MicronOrigami_gross, Stack für stealth parasitic mode, , , , , Good pausenfueller1.jpgpausenfueller2.jpg
Dieser Stack wird jetzt quasi als Pausenkasperl eingebaut und läuft im "stealth parasitic" mode während der Irradiation-Woche. Gut,
dass wir alles auch von Wien aus fernsteuern können :-)
Entry  Wed Oct 17 21:30:39 2012, Markus Friedl, MicronOrigami_gross, cal, cal008, 83800, 17.10.2012 17:15:13, 17.10.2012 18:08:11, Good currents.pngcurrents2.png
Internal calibration for "stealth parasitic" mode Belle stack; taken without beam
 
Belle Stack 4: 2 DSSD -z, Origami #3, #1, wedge new #2
Entry  Fri Oct 19 00:45:52 2012, Markus Friedl, MicronOrigami_gross, run, run016, 11855, 19.10.2012 00:24:05, 19.10.2012 00:48:24, Crap 
 
Belle Stack 4: 2 DSSD -z, Origami #3, #1, wedge new #2
HV = +-50V, Ibias=77A
Entry  Fri Oct 19 00:56:16 2012, Markus Friedl, MicronOrigami_gross, run, run017, 197899, 19.10.2012 00:54:21, 19.10.2012 14:10:02 , Good 
Belle Stack 4: 2 DSSD -z, Origami #3, #1, wedge new #2
HV = +-50V, Ibias=76A
Position: APVs #2, 7, 11, 15 | # 17/18, 21, 25, 29
Entry  Fri Oct 19 19:25:29 2012, Markus Friedl, MicronOrigami_gross, run, run018, 318756, 19.10.2012 19:23:55, 20.10.2012 10:27:11, Good 
Belle Stack 4: 2 DSSD -z, Origami #3, #1, wedge new #2
HV = +-50V, Ibias=77A
Position: APVs #2, 7, 11, 15 | # 17/18, 21, 25, 29
Entry  Sat Oct 20 10:49:03 2012, Markus Friedl, MicronOrigami_gross, cal, cal019, 83800, 20.10.2012 10:46:36, 20.10.2012 11:32:57, Good 
Belle Stack 4: 2 DSSD -z, Origami #3, #1, wedge new #2
HV = +-45V, Ibias=70A
Position: APVs #2, 7, 11, 15 | # 17/18, 21, 25, 29
Entry  Sat Oct 20 11:40:13 2012, Markus Friedl, MicronOrigami_gross, run, run019, 100000, 20.10.2012 11:38:19, 20.10.2012 19:20:51, Good 
Belle Stack 4: 2 DSSD -z, Origami #3, #1, wedge new #2
HV = +-45V, Ibias=72A
Position: APVs #2, 7, 11, 15 | # 17/18, 21, 25, 29
Entry  Sat Oct 20 19:35:30 2012, Markus Friedl, MicronOrigami_gross, run, run020, 300000, 20.10.2012 19:34:19, 21.10.2012 08:55:28, Good 
Belle Stack 4: 2 DSSD -z, Origami #3, #1, wedge new #2
HV = +-40V, Ibias=73A
Position: APVs #2, 7, 11, 15 | # 17/18, 21, 25, 29
Entry  Sun Oct 21 09:01:04 2012, Markus Friedl, MicronOrigami_gross, cal, cal020, 83800, 21.10.2012 08:59:21, 21.10.2012 09:45:03, Good 
Belle Stack 4: 2 DSSD -z, Origami #3, #1, wedge new #2
HV = +-40V, Ibias=72uA
Position: APVs #2, 7, 11, 15 | # 17/18, 21, 25, 29
Entry  Sun Oct 21 09:50:00 2012, Markus Friedl, MicronOrigami_gross, cal, cal021, 83800, 21.10.2012 09:50:07 , 21.10.2012 10:35:40, Good 
Belle Stack 4: 2 DSSD -z, Origami #3, #1, wedge new #2
HV = +-35V, Ibias=69uA
Position: APVs #2, 7, 11, 15 | # 17/18, 21, 25, 29
Entry  Sun Oct 21 10:39:15 2012, Markus Friedl, MicronOrigami_gross, run, run021, 100000, 21.10.2012 10:37:26, 21.10.2012 15:04:49, Good 
Belle Stack 4: 2 DSSD -z, Origami #3, #1, wedge new #2
HV = +-35V, Ibias=69uA
Position: APVs #2, 7, 11, 15 | # 17/18, 21, 25, 29
Entry  Sun Oct 21 15:15:45 2012, Markus Friedl, MicronOrigami_gross, cal, cal022, 83800, 21.10.2012 15:13:47, 21.10.2012 16:00:25, Good 
Belle Stack 4: 2 DSSD -z, Origami #3, #1, wedge new #2
HV = +-30V, Ibias=70uA
Position: APVs #2, 7, 11, 15 | # 17/18, 21, 25, 29
Entry  Sun Oct 21 16:04:06 2012, Markus Friedl, MicronOrigami_gross, run, run022, 151282, 21.10.2012 18:16:53, 22.10.2012 00:04:42, Good 
Belle Stack 4: 2 DSSD -z, Origami #3, #1, wedge new #2
HV = +-30V, Ibias=70uA
Position: APVs #2, 7, 11, 15 | # 17/18, 21, 25, 29
Entry  Mon Oct 22 00:08:39 2012, Markus Friedl, MicronOrigami_gross, cal, cal023, 83800, 22.10.2012 00:07:34, 22.10.2012 00:53:02, Good 
Belle Stack 4: 2 DSSD -z, Origami #3, #1, wedge new #2
HV = +-25V, Ibias=65uA
Position: APVs #2, 7, 11, 15 | # 17/18, 21, 25, 29
Entry  Mon Oct 22 00:57:05 2012, Markus Friedl, MicronOrigami_gross, run, run023, 176629, 22.10.2012 00:55:59, 22.10.2012 10:04:38, Good 
Belle Stack 4: 2 DSSD -z, Origami #3, #1, wedge new #2
HV = +-25V, Ibias=65uA
Position: APVs #2, 7, 11, 15 | # 17/18, 21, 25, 29
Entry  Mon Oct 22 10:10:16 2012, Markus Friedl, MicronOrigami_gross, cal, cal024, 83800, 22.10.2012 10:08:53, 22.10.2012 10:54:18, Good 
Belle Stack 4: 2 DSSD -z, Origami #3, #1, wedge new #2
HV = +-20V, Ibias=53uA
Position: APVs #2, 7, 11, 15 | # 17/18, 21, 25, 29
Entry  Mon Oct 22 19:19:53 2012, Markus Friedl, MicronOrigami_gross, run, run024, 260000, 22.10.2012 19:18:16, 23.10.2012 08:17:20 , Good 
Belle Stack 4: 2 DSSD -z, Origami #3, #1, wedge new #2
HV = +-20V, Ibias=57uA
Position: APVs #2, 7, 11, 15 | # 17/18, 21, 25, 29
ELOG V3.1.5-fc6679b