Home CMS Production Clean room MedAustron HEPHY testbeams old
testbeam-RD50-DESY-Apr2024 testbeam-RD50-DESY-Jul2023 testbeam-RD50-CERN-Oct2022 testbeam-DESY-Oct2017 testbeam-DESY-April2017 testbeam-SPS2015 testbeam-SPS2014 testbeam-DESY14 testbeam-SPS12 testbeam-SPS11 testbeam-SPS10 testbeam-SPS09 testbeam-SPS08 LP-TPC
  HEPHY logbook for testbeam at SPS October 2012 and Irradiation Mol, Page 1 of 4  Not logged in ELOG logo
Entry  Tue Oct 23 23:12:03 2012, Thomas Bergauer, MicronOrigami_gross, run, run027, 220847, 23.10.2012 23:10:14, 24.10.2012 08:19:51, Unknown 
 Belle Stack 4: 2 DSSD -z, Origami #3, #1, wedge new #2
HV = +-5V, Ibias=23.5uA
Position: APVs #2, 7, 11, 15 | # 17/18, 21, 25, 29
= p: 2DSSD #2, Origami3 #3, Origami1 #3, wedgenew
#3
= n: 2DSSD #1/2, Origami3 #1, Origami1 #1, wedgenew #1
 
SPS Status during whole run: Still problems with North
Entry  Wed Oct 24 08:25:04 2012, Thomas Bergauer, MicronOrigami_gross, cal, cal027, 83800, 24.10.2012 08:22:25, 24.10.2012 09:10:19, Unknown 
 Belle Stack 4: 2 DSSD -z, Origami #3, #1, wedge new #2
HV = +-5V, Ibias=23.5uA
Position: APVs #2, 7, 11, 15 | # 17/18, 21, 25, 29
= p: 2DSSD #2, Origami3 #3, Origami1 #3, wedgenew
#3
= n: 2DSSD #1/2, Origami3 #1, Origami1 #1, wedgenew #1
Entry  Wed Oct 24 09:51:41 2012, Thomas Bergauer, MicronOrigami_gross, cal, cal028, 83800, 24.10.2012 09:50:53, 24.10.2012 10:39:43, Unknown 
 Belle Stack 4: 2 DSSD -z, Origami #3, #1, wedge new #2
HV = +-2.5V, Ibias=14.5uA
Position: APVs #2, 7, 11, 15 | # 17/18, 21, 25, 29
= p: 2DSSD #2, Origami3 #3, Origami1 #3,
wedgenew #3
= n: 2DSSD #1/2, Origami3 #1, Origami1 #1, wedgenew #1
Entry  Wed Oct 24 17:24:40 2012, Thomas Bergauer, MicronOrigami_gross, run ohne Strom ;-(, run028, , , , Unknown 
 
Belle Stack 4: 2 DSSD -z, Origami #3, #1, wedge new #2
HV = +-2.5V, Ibias=14.5uA
Entry  Fri Oct 12 23:51:35 2012, Markus Friedl, common, Zimmernummer & Telefonnummern, , , , , Unknown 
2nd week:
Markus: 38 - 420   (phone: 70 420)
Thomas: 38 - 431   (phone: 70 431)
Entry  Fri Oct 12 23:52:57 2012, Markus Friedl, common, Sozialisierung, , , , , Unknown 
Prost, Bergi!
(Das ist nur ein Test, ob du wirklich all die Elog-Emails liest.)
Entry  Sat Oct 13 19:04:23 2012, Markus Friedl, MicronOrigami_gross, CO2 cooling, , , , , Unknown 
Wir haben ja schon seit langem vermutet, dass man mit reiner Gasphase nicht kühlen kann. Jetzt erbringen wir den experimentellen Beweis dafür.
Expandierendes Gas kühlt zwar auch, aber nicht so tief runter und vor allem sind beträchtliche Temperaturdifferenzen zwischen den einzelnen
Modulen zu beobachten. Das erste Origami bekommt etwa -13°C aber bis zum letzten Micron sind wir auf Raumtemperatur.
Entry  Sat Oct 13 23:01:54 2012, Markus Friedl, MicronOrigami_gross, run with Belle stack 3, run004, 30k, 13.10.2012 21:41:34, 13.10.2012 22:57:48, Unknown 
Belle stack 3, other position (CE)
 
Position of xy table:
Entry  Sat Oct 13 23:04:22 2012, Markus Friedl, MicronOrigami_gross, cal, cal002, 83800, 13.10.2012 23:03:18, 13.10.2012 22:57:48, Unknown 
Belle stack 3 (2-DSSD, Micron new, Micron old)
HV = +-50V   I=10.5A 
beam on CE sensor
Entry  Tue Oct 16 23:03:09 2012, Markus Friedl, common, Sozialisierung, , , , , Unknown IMAG2041.jpgfondue.jpg
So steuert man einen Testbeam!
Entry  Wed Oct 17 14:06:24 2012, Markus Friedl, MicronOrigami_gross, Stack für stealth parasitic mode, , , , , Good pausenfueller1.jpgpausenfueller2.jpg
Dieser Stack wird jetzt quasi als Pausenkasperl eingebaut und läuft im "stealth parasitic" mode während der Irradiation-Woche. Gut,
dass wir alles auch von Wien aus fernsteuern können :-)
Entry  Wed Oct 17 21:30:39 2012, Markus Friedl, MicronOrigami_gross, cal, cal008, 83800, 17.10.2012 17:15:13, 17.10.2012 18:08:11, Good currents.pngcurrents2.png
Internal calibration for "stealth parasitic" mode Belle stack; taken without beam
 
Belle Stack 4: 2 DSSD -z, Origami #3, #1, wedge new #2
Entry  Fri Oct 19 00:45:52 2012, Markus Friedl, MicronOrigami_gross, run, run016, 11855, 19.10.2012 00:24:05, 19.10.2012 00:48:24, Crap 
 
Belle Stack 4: 2 DSSD -z, Origami #3, #1, wedge new #2
HV = +-50V, Ibias=77A
Entry  Fri Oct 19 00:56:16 2012, Markus Friedl, MicronOrigami_gross, run, run017, 197899, 19.10.2012 00:54:21, 19.10.2012 14:10:02 , Good 
Belle Stack 4: 2 DSSD -z, Origami #3, #1, wedge new #2
HV = +-50V, Ibias=76A
Position: APVs #2, 7, 11, 15 | # 17/18, 21, 25, 29
Entry  Fri Oct 19 19:25:29 2012, Markus Friedl, MicronOrigami_gross, run, run018, 318756, 19.10.2012 19:23:55, 20.10.2012 10:27:11, Good 
Belle Stack 4: 2 DSSD -z, Origami #3, #1, wedge new #2
HV = +-50V, Ibias=77A
Position: APVs #2, 7, 11, 15 | # 17/18, 21, 25, 29
Entry  Sat Oct 20 10:49:03 2012, Markus Friedl, MicronOrigami_gross, cal, cal019, 83800, 20.10.2012 10:46:36, 20.10.2012 11:32:57, Good 
Belle Stack 4: 2 DSSD -z, Origami #3, #1, wedge new #2
HV = +-45V, Ibias=70A
Position: APVs #2, 7, 11, 15 | # 17/18, 21, 25, 29
Entry  Sat Oct 20 11:40:13 2012, Markus Friedl, MicronOrigami_gross, run, run019, 100000, 20.10.2012 11:38:19, 20.10.2012 19:20:51, Good 
Belle Stack 4: 2 DSSD -z, Origami #3, #1, wedge new #2
HV = +-45V, Ibias=72A
Position: APVs #2, 7, 11, 15 | # 17/18, 21, 25, 29
Entry  Sat Oct 20 19:35:30 2012, Markus Friedl, MicronOrigami_gross, run, run020, 300000, 20.10.2012 19:34:19, 21.10.2012 08:55:28, Good 
Belle Stack 4: 2 DSSD -z, Origami #3, #1, wedge new #2
HV = +-40V, Ibias=73A
Position: APVs #2, 7, 11, 15 | # 17/18, 21, 25, 29
Entry  Sun Oct 21 09:01:04 2012, Markus Friedl, MicronOrigami_gross, cal, cal020, 83800, 21.10.2012 08:59:21, 21.10.2012 09:45:03, Good 
Belle Stack 4: 2 DSSD -z, Origami #3, #1, wedge new #2
HV = +-40V, Ibias=72uA
Position: APVs #2, 7, 11, 15 | # 17/18, 21, 25, 29
Entry  Sun Oct 21 09:50:00 2012, Markus Friedl, MicronOrigami_gross, cal, cal021, 83800, 21.10.2012 09:50:07 , 21.10.2012 10:35:40, Good 
Belle Stack 4: 2 DSSD -z, Origami #3, #1, wedge new #2
HV = +-35V, Ibias=69uA
Position: APVs #2, 7, 11, 15 | # 17/18, 21, 25, 29
ELOG V3.1.5-fc6679b